ECHO, European Commission, Brussels 20 Jan 2016 KnowRISK project Kick off meeting for the selected projects under the 2015 Call for proposals for prevention.

Slides:



Advertisements
Similar presentations
A Guide to Localizing the Hyogo Framework for Action
Advertisements

Preparedness for Oil-polluted Shoreline cleanup and Oiled Wildlife interventions (POSOW) Gabino Gonzalez 6th of February 2012 Preparedness project for.
Brussels, 6 February Joint kick-off meeting of the selected projects under the Call OJ 2011/C49/09 Urban Disaster Prevention Strategies Using MAcroseismic.
1 Bishkek November 17, Goulsara Pulatova RegionalCoordinator UNISDR Secretariat Office in Central Asia 2nd Regional Consultative.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions ECHO. C4 – Civil protection prevention and preparedness 2010 Kick off meeting – Brussels.
CIRAS PROJECT OVERVIEW
1Comprehensive Disaster Risk Management Framework The Role of Local Actors 111 Safer Cities Session 1 World Bank Institute Fouad Bendimerad, Ph.D., P.E.
OPENCities OPENCities is based on a concept developed by British Council in collaboration with a network of European Cities, led by Belfast, including.
SOUTH ASIA LAUNCH OF GLOBAL CAMPAIGN MAKING CITIES RESILIENT MY CITY IS GETTING READY New Delhi June 8-9, 2010.
Re silience of C ritical I nfrastructure P rotection in E urope (RECIPE) PhD Robert Mikac, RECIPE Project Manager Head of Sector for Civil Protection,
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
This project has been funded with support from the European Commission, the Civil Protection Financial Instrument, – Directorate General for Humanitarian.
FROM GAPS TO CAPS Risk Management Capability on Gaps Identification in the BSR Neringa Brogaitė-Karvelienė Fire and Rescue Department under MoI of Lithuania.
EUPAN HRWG/IPSG Meeting
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: An outline NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project co funded by the.
Enhancing Volunteer Awareness and education against Natural Disasters through E-learning (EVANDE) Dr C. Fassoulas, Project Coordinator Natural History.
1 Overview of LESSLOSS – Training / Dissemination Activities Lessloss Topic Workshops TWS3-1 and TWS5-1 SP7 and SP10 Local Organisers: LNEC and IST Lisbon,
Headquaters Kick-Off Meeting Brussels 17 January 2013 Aware and Resilient Project overview – Austrian Red Cross.
15 April Fostering Entrepreneurship among young people through education: a EU perspective Simone Baldassarri Unit “Entrepreneurship” Forum “Delivering.
EUROWA Module European Module for Oiled Wildlife Emergency Response Assistance.
With the support of the Civil Protection Financial Instrument European Commission – Directorate General for Humanitarian Aid and Civil Protection - ECHO.
The URBACT II Programme General Presentation Vilnius, 20 January 2011.
An Integrated Methodological framework for Emergency Logistics - MELOGIC Dr Georgios Boustras Associate Professor in Risk Assessment Dean of the Ioannis.
Action of Contrast to Contrast to Hydraulic Hydraulic Emergency in Emergency in LOcal LOcal Urban Urban Site SiteACHELOUS.
MATILDA Project Bruxelles, 20 January 2015 Kick off meeting for the selected projects under the 2014 Call for proposals for prevention and preparedness.
Marina Signore e- Frame Project Coordinator Division "Metadata, Quality and R&D Projects", Chief Istat e-Frame “European Framework for Measuring Progress.
Community Resilience in Urban Areas (CRUA). Administrative Overview Agreement number:ECHO/SUB/2014/ Total eligible cost: € 662, EC co-financing:
REGIONAL ANALYSIS ON DISASTER RISK REDUCTION EDUCATION IN THE ASIA PACIFIC REGION IN THE CONTEXT OF HFA PRIORITY 3 IMPLEMENTATION Bangkok, March 2009 Prepared.
Washington D.C., USA, July 2012www.aids2012.org The HIV/AIDS Civil Society Forum and Think Tank: from policy to action Anna Zakowicz HIV/AIDS Civil.
Rome, 15 May hrs 4th ODS3F Progress Meeting, 15 May 2014, Rome ODS3F project overview Giovanni Laneve DIAEE – Università di Roma ‘La.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Disaster Preparedness and Prevention Initiative for South Eastern Europe DPPI SEE Seminar on Strengthening Cooperation with Candidate Countries and Western.
E-PreS: Monitoring and Evaluation of Natural Hazard Preparedness at School Environments Stathes Hadjiefthymiades National Kapodistrian University of Athens.
A Strategic Research Agenda for Europe in the field of illicit drugs Priorities for socio-economic and humanities research HDG Brussels - December 10,
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
RECALL Resilient European Communities Against Local Landslides KICK OFF MEETING Projects selected under the 2014 Call for Proposals for Prevention & Preparedness.
Mission & Activities Cristina Dorati Warsaw, 18 January 2008 [Regional Agency for Education, Training and Employment]
Cooperation project on strengthening EU's Nordic USAR modules Acronym: EU-NU Grant Agreement n:o ECHO/SUB/2014/
Operational tools for improving efficiency in wildfire risk reduction in EU landscapes (FIREfficient) CIVIL PROTECTION FINANCIAL INSTRUMENTS 2013 CALL.
Global Assessment Report and need for Regional Assessment Report Meeting of the ISDR Asia Partnership, September September 2011 Pattaya, Thailand.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
CREATION OF A BLACK SEA NETWORK FOR SUSTAINABLE TOURISM DEVELOPMENT IN BULGARIA, ROMANIA, UKRAINE, MOLDOVA AND GEORGIA (BS TOURISM NET) NEWSLETTER Issue.
IDEA Improving Damage assessments to Enhance cost-benefit Analyses Call Identifier: Prevention 1. Actions on the economics of investing in disaster risk.
Responsive Innovation for Disaster Mitigation Gordon A. Gow University of Alberta.
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
3 rd WG F meeting: CRUE ERA-Net update Andreas Pichler CRUE ERA-Net dissemination officer.
MENTEP kick off meeting and bilateral discussions Brussels, 13 April 2015 MENTEP in a nutshell …from the partners’ point of view Patricia Wastiau European.
URBACT INFODAYS PORTUGAL TOWARDS URBACT III Lisbon 21st January 2015.
EU PROMETHEUS 2014 Communication Strategy KICK OFF MEETING Brussels April 9 th, 2013.
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
Monitoring Visit to NatRisk Project
MEFISTO Mediterranean Forest Fire Fighting Training Standardisation
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Risk management via an Innovative System based on Knowledge
Common Standard Operational Procedures for the Union Civil Protection Mechanism Modules and Teams (UCPM SOPs) – UCPM SOPs – UCPM-2017-PP-AG This.
SwafS : Mobilising Research Excellence in EU Outermost Regions (OR)
Susanne Wacht (THW) Kick-off meeting 18 January 2017 at DG ECHO / ERCC
Civil Protection Financial Instrument – Prevention Projects
Risk Management Capability on Gaps Identification in the BSR
Strengthening Early Warning Systems in Europe
DIRECT – DIsaster REsilient Communities and Towns
Water Scarcity Drafting Group (DG) Strategic Coordination Group meeting Brussels, May 19th 2005 Progress Report 1 Dicembre 2004.
Structural Funds: Investing in Roma
PACES Preparedness for Appropriate accommodation in Emergency Shelters
Presentation transcript:

ECHO, European Commission, Brussels 20 Jan 2016 KnowRISK project Kick off meeting for the selected projects under the 2015 Call for proposals for prevention and preparedness projects Instituto Superior Técnico (IST) Portugal

ECHO, European Commission, Brussels 20 Jan 2016 Acronym: KnowRISK Project name: Know your city, Reduce seISmic risK through non- structural elements Framework: CALL FOR PROPOSALS 2015 FOR PREVENTION AND PREPAREDNESS PROJECTS IN CIVIL PROTECTION AND MARINE POLLUTION. PREVENTION PRIORITIES Starting date: 1 JANUARY 2016 Duration: 24 MONTHS

ECHO, European Commission, Brussels 20 Jan Countries: Portugal, Italy, Iceland 4 Partners: Instituto Superior Técnico (IST), Portugal -COORDINATOR Laboratório Nacional de Engenharia Civil (LNEC), Portugal Istituto Nazionale di Geofisica e Vulcanologia (INGV), Italy University of Iceland (EERC), Iceland Advisory Board: National Civil Protections Agencies from Portugal, Iceland and Italy Consultants: 3 renown experts from Italy and UK Cost of the Project: ,00 EUR EU Financial Contribution : ,00 EUR (75% total eligible costs) Participants

ECHO, European Commission, Brussels 20 Jan 2016 KnowRISK project # aims at facilitating local communities’ access to expert knowledge on non- structural seismic protection solutions WHY? Damage of these elements often induces in significant earthquake impacts. #1999 Izmit earthquake, Turkey => 50% of the injuries and 3% of human losses were caused by non-structural failures. # Christchurch earthquakes, New Zealand => 40% of building damage was induced by non-structural malfunctions. Around 70%-85% of construction cost goes into these elements, their damage can strongly influence the ability of communities to cope with and recover from earthquakes. Non-structural elements of constructions are: - architectural parts (partitions, ceilings, cladding), - electrical and mechanic systems (distribution panels, piping, plumbing) and - contents (furniture, book cases, computers and desktop equipment).

ECHO, European Commission, Brussels 20 Jan 2016 Objectives i) Decrease the gap between science and stakeholders (Task B); ii) Identify non-structural elements in building stock (Task C); iii) Solutions to strengthen non-structural elements (Task C); iv) Assess the level of awareness of stakeholders and citizens (Task D); v) Promote the engagement among science community, practitioners and citizens (Task E); vi) Provide a multi-language Practical Guide of non-structural solutions (Task F).

ECHO, European Commission, Brussels 20 Jan 2016 Project structure Definition of seismic scenarios critical for non- structural damage in each participant country (Task B) produce a Portfolio of good practices to reduce most common non-structural vulnerabilities(Task C) investigate the level of awareness (survey/quiz) in specific communities (Task D) Definition of risk communication strategies and participatory approaches (Task E) Research for Action Action for Prevention Dissemination of good practices in society groups (schools, households, general public) (Task F)

ECHO, European Commission, Brussels 20 Jan 2016 Project structure

ECHO, European Commission, Brussels 20 Jan 2016 TaskStart DateEnd DateDeliverables A - Project coordination and management 01/01/201631/12/ Administrative management. - Creation of the Management Board coordination. - Project launch meeting in Brussels. - Periodical meeting of the Management Board of the project - Two progress reports (months 8 and 16). - Final report. - Layman’s report. B - RiskMAP01/02/201630/09/2016- Seismic scenarios for Lisbon pilot area, Mt. Etna pilot area and South Iceland pilot area - Identification of ground motion intensity parameters that are critical for non-structural damage. - RiskMAP for pilot areas. C - Non-structural seismic risk reduction 01/02/201631/01/2017- Review of non-structural damage from past earthquakes (worldwide) to develop a systematic classification system. - Identification of the most vulnerable non-structural components in the pilot study areas. - Shake table tests of wall shelves. - Portfolio: procedures for minimizing the risk of non-structural damages. D - Going into target- communities 01/04/201631/12/2017- Report on characterization of pilot-areas report. - Report on building sector stakeholders and end-users views about earthquake risk and non-structural risk reduction. - On-going Social Impact Assessment report. E - Tools and strategies of risk communication and learning 01/02/201630/09/2017- Practical Guide on non-structural safety for population. - Participatory risk communication action “KnowRISK: be safe!” - Know your school: cope with non-structural vulnerability - Educational tools for risk reduction. - Social Impact Assessment Report: how far was risk communication in terms of behaviour change? F - Publicity (Visibility)01/01/201631/12/2017- Dissemination of research output. - KnowRISK Portal development. - KnowRISK Newsletter. - KnowRISK Final Dissemination Conference.

ECHO, European Commission, Brussels 20 Jan 2016 Planned meetings i) Kick-off meeting (4-5 Feb 2016) ii) Iceland (Sept 2016) –> Results Task B; ongoing Tasks C, D, E and F iii) Catania (March 2017) -> Results Task C; ongoing Tasks D, E and F iv) Final Conference: Lisbon (Dec 2017). Reporting progress August st progress report: Month 8 (August 2016) 2 nd progress report: Month 16 (April 2017) Final report: Month 24 (December 2017)

ECHO, European Commission, Brussels 20 Jan 2016 Follow up of the project Dissemination of the Practical Guide Non-structural elements are many and of diverse nature. Only a few were given most attention. In the continuation of this Project other should be the object of more detailed analysis. In the field of communication of risk there are many other stakeholders beyond the ones worked out in this Project which could be interested in being part of the field inquires. A Special Issue publication will be made with all the material developed.