LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.

Slides:



Advertisements
Similar presentations
Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
Advertisements

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
LAT Design Integration1 GLAST LAT ProjectDecember 2003 LAT Planning Meeting December 10, 2003 Design Integration LAT Planning Meeting December 10, 2003.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
LAT Requirements Verification in TVAC
Integration and Test GLAST Large Area Telescope:
1. Introduction and Overview
Thermal Vacuum Test: Plans and Procedures
Design Integration and Analysis
GLAST Large Area Telescope:
Integration and Test Organization Chart
Mechanical/Thermal Systems
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope:
Design Integration and Analysis
Presentation transcript:

LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status Review 24 May 2005 Design Integration and Analysis Martin NordbyJohn KuJack Goodman

LAT Design Integration and Analysis2 GLAST LAT Project24 May 2005 Design Support Status Flight/fly-away hardware design (all remaining hardware listed) √ X-Side Blanket Bar and mount brackets: drawings released √ X-Side Connector Panels: drawings released √ Y-Side Connector Panel: drawings released √ External cables: ACD cables revisions released –Accelerometer mount brackets: drawings in release cycle –Temp Sensor Brackets: drawings complete; analysis ECD is 5/25 –MLI blankets: design/interfaces finalized at Spectrum meeting last week; dwg’s in work –External fly-away instrumentation cables: in queue after above work is finished –TKR accel mount bracket: concept complete; drawing not started (ECD: 6/24) LAT-DS Cable Installation Kit –Final checks out for review now; out for release by 5/27 LAT-DS LAT Tower and Electronics Assembly –In release cycle now LAT-DS LAT Instrument Assembly –Modeling largely complete –Drafting awaiting completion of flight hardware detailing LAT-DS ACD-LAT IDD –Release waiting on telecon review of changes

LAT Design Integration and Analysis3 GLAST LAT Project24 May 2005 Integration and Test Planning LAT Integration Sequence (LAT-MD ) –Revision not yet started to address post-tower integration sequence updates Configuration drawings –LAT Instrument Configuration Assembly Heat pipe locating/support MGSE drawings in release cycle ACD lift fixture in analysis Drawing on hold pending completion of ACD lift fixture (ECD: 6/15)) Integration MGSE (all remaining integration MGSE listed) –Chill Bars: parts complete; assembly to be done this week (need: 6/8) –Chiller: due last Friday –Auxiliary cooling plumbing: order in-work; expect delivery next week (need: 6/8) Environmental Test planning –Planning and Design review May 3-4 at NRL was successful in baselining EMI, Dynamics test plans –T-Vac test planning is behind  we have a follow-on meeting tomorrow to finalize in- chamber heating/cooling plans, which is the biggest issue

LAT Design Integration and Analysis4 GLAST LAT Project24 May 2005 Structural Analysis: Accomplishments LAT System Level –Continued LAT Static test plan development Support of MGSE designs Final analysis, and TRR slide preparation in-work –Continued LAT Environmental test planning Supported Environmental Test NRL –Presented Dynamics Test Plan – No major actions –Identified details that need to be closed and are in-work –Completed TIP assembly analysis – minor design modification, final report pending LAT Subsystem Level –TKR Subsystem Continued support of TKR testing at Alenia Continued to review all TKR vibration test reports from INFN/Bari –Mechanical Subsystem Supported RAD test plan discussions –EBOX Subsystem Supported TEM/TPS Acceptance testing T IT TI T T D I T = Flight Design = Integration Prep = LAT/SS Test Prep T

LAT Design Integration and Analysis5 GLAST LAT Project24 May 2005 Structural Analysis: Near-term Milestones and Status LAT System Level –LAT Static Testing: complete pre-test analysis and review with mechanical branch –LAT Dynamics Testing Finalize external accelerometer locations and cable routing – ECD = 6/1/05 Update LAT vibration test predictions – ECD = 9/1/05 Continue planning with I&T and NRL for LAT environmental testing – ECD=ongoing through test –MGSE for I&T: augment MGSE analysis with additional I&T needs, as required LAT Test Stand MGSE and associated handling procedures and test environments – ECD = 6/3/05 Shipping Container Analysis Report – ECD = 6/3/05 LAT Subsystem Level –TKR Subsystem Continue to support testing in Italy (help from GSFC is lined up) –Mechanical Subsystem Proof Test Spectrum provided flexures TRR – ECD = 6/10/05 Shear plate qualification test report – ECD = 6/17/05 Grid Static Load Test procedures, STE, TRR – ECD = 7/5/05 Support RAD and XLAT issues, as needed –EBOX Subsystem Complete TEM/TPS Vibration test report Analyze cable support tray analysis D I T T IT I T T TID = Flight Design = Integration Prep = LAT/SS Test Prep

LAT Design Integration and Analysis6 GLAST LAT Project24 May 2005 Thermal Engineering Activities – Completed Design Engineering and Support –Supported LAT level TVAC MGSE design –Presentation at LAT Environmental TIM on May 3-5 LAT Level Thermal Analysis and Tests –Completed evaluation of concepts to reduce transient times between thermal cycling; Auxiliary HEX is the best, but added complexity; Base case chosen to be LAT powered on with overdriving thermal sink plates to -150C –LAT TVAC concept thermal design set-up finished –LAT TVAC Test Plan document finished Subsystem Support and Oversight –Completed TKR 1 and TKR 3 TVAC Acceptance Test; first time for dual test LAT Thermal Control System Lockheed Thermal Control System Hardware –Radiator Protoqual Test Plan, finished –Held review with LM Mission Success Group and NASA to re-scope X-LAT Plate acceptance test Thermal test with atmospheric hot and cold GN2 rather than at vacuum Increase cycles from 4 to 12 Change from thermographic to ultrasonic test of heat pipe bond joint –X-LAT Plate Protoqual Test Plan finished

LAT Design Integration and Analysis7 GLAST LAT Project24 May 2005 Thermal Engineering Activities – Current Design Engineering and Support –Environmental Specification – change Tracker Acceptance Level Tests (35oC to 45oC) –Review between SLAC, LM and Spectrum to agree on MLI blanket outer surface finish. LAT Level Thermal Analysis and Tests –Thermal math model for LAT TVAC Test almost complete; LAT support stand GSE will be incorporated into model when time becomes available - after radiator/TCS acceptance tests –TVAC Test Procedures document started Subsystem Support and Oversight –Continued support for TKR TVAC Acceptance Testing; TKR 4 and 5 in test this week –Continued support of TVAC tests for eboxes –Support of ACD TVAC test LAT Thermal Control System –Set-up for test to measure thermal conductance of VCHP triple joint using mold release material in progress; test will proceed when time is available in TVAC chamber Lockheed Thermal Control System Hardware –Radiator/TCS Protoqual Test planned for June 2005 –X-LAT Plate undergoing ultrasonic testing May 23-24; Protoqual Test TRR scheduled for May 25; Thermal cycling planned to be finished May 27. –X-LAT Plate TVAC Protoqual Test Procedures, finished and in review

LAT Design Integration and Analysis8 GLAST LAT Project24 May 2005 Thermal Engineering Activities - Planned Design Engineering and Support –Complete detailed MLI design –Review, then fabricate MLI blankets; two sets, one set for tests and other for flight LAT Level Thermal Analysis and Tests –Thermal Math Model, Ver. 6.1, reduced node –Thermal Math Model, Ver. 6.2, LAT TVAC test configuration –Document analysis of LAT transition from Survival to Operating Mode –200 Node Launch Vehicle Thermal Math Model Subsystem Support and Oversight –Support TVAC tests of all eboxes –Support TVAC tests of TKR –Support ACD TVAC test LAT Thermal Control System –Preliminary verification during LM Radiator Protoqual Tests –TCS verified in LAT TVAC tests at NRL Lockheed Thermal Control System Hardware –Radiator TVAC Protoqual Test Procedures, writing to begin within days