Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in https://edms.cern.ch/document/1549318/1 https://edms.cern.ch/document/1549318/1.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
LHC CRAB CAVITY He Tank DQW Prototype P.Freijedo-Menendez C.Zanoni L.Giordanino R.Leuxe.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Specification of niobium sheets 031/05/2010 O. Capatina G. Arnau Izquierdo W. Weingarten S. Atieh.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
P.Freijedo Date: Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Material samples provided by Niovawe: N22: Niobium.
Status of Activities at CERN
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Fabrication and measurement of RF components for CLIC study
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Manufacturing process, validation and factory test
High pure Niobium Industrialisation, Alternative Production Ways, and Strategic Cooperation.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Ports: purpose –vacuum, rf location –accelerating cavity, coupling cavity dimensions … Already discussed, but some points need to be double checked …
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
1 - NbTi-Nb transitions for the extremities (Clé et Bords droites): DESIGN OF THE WELDING CONFIGURATIONS & SAMPLES FOR TESTING AND QUALIFICATIONS: - Tuning.
Beam Vacuum Interconnect Design Options Ray Veness.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Design specificities of the SPL cryomodule prototype O. Capatina, V. Parma – CERN On behalf of the SPL team 1.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
P.Freijedo Date: Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Beam tube for Crab Cavity Beam tube provided by.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TDR guideline discussion on Cavity Integration
CERN – Zanon discussions
Plans for the construction of the new membrane cryostat in bldg 182
Crab Cavities Contribution from the U.S.
Ti/SS transitions A.Basti INFN-PISA*
T5.2: Harmonization - Material and Component Reference
Crab – RFD prototype: Production Status Update
Crab Cavities: In-house Production Extremities
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Complementary ISTC Projects #3888, 3889p
Flexible lines production and planning
CERN Engineering Specification
Fabrication of Nb and Cu SPL cavities and required tools CERN status
DQW HOM filter fabrication quality control
Status of Cavities at DESY
Niklas Templeton – STFC – UK Collaboration
Cavity + He Vessel interface
RF-Dipole Cavity Update
Analysis of niobium material
Superconducting RF Crab Cavities
Crab – RFD prototype: Fabrication Status Update
Presentation transcript:

Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in

Material summary (Ti-grade2) ITEMDimensions [mm] Ordered [n o ] Received [n o ] Comments Ti Gr.2 for helium tank 575 x 390 x Machining at GRAEVEN; 452 x 390 x x 484 x Ø165 x Ø215 x Ø173 x Ti Gr.2 for spare helium tank 575 x 390 x Ultrasonic test performed at CERN, results OK 452 x 390 x x 484 x Ø165 x Ø215 x Ø173 x x 1000 x 2 11 Ti Gr.2 for tensile, metallographic and tightening tests (only 25 mm) 220 x 100 x Tensile and metallographic samples have recently been machined, tests will be performed in the coming weeks. 220 x 100 x x 100 x x 200 x 25 11

Material summary (Ti-grade2 + 5) ITEMDimensions [mm] Ordered [n o ] Received [n o ] Comments Ti Gr.2 for ring screw caps He tank & tightening tests (only 3 mm) 500 x 575 x 2 11 Ultrasonic testing required? 590 x 530 x 3 11 Ti Gr.2 for shear and traction tests on bolts, tooling Ø30 x Shear and traction tests foreseen for November Ø40 x x 50 x x 40 x x 53 x x 55.5 x Ti Gr.2 for brazing test Ø100 x Ø144 x Bolts in Ti Gr.5 for prototype helium tank M5 x Quick metallographic inspection of thread performed; Molycote vs. apiezon test performed M6 x

Material summary (Nb) ITEMDimensions [mm] Ordered [n o ] Received [n o ] Comments Nb for welding tests & qualification 520 x 520 x 4 77 (5.5 left) Ultrasonic test OK; 0.5 unit of 4 mm and 0.5 unit of 2 mm to be used for brazing and tightening tests 520 x 520 x x 520 x 2 33 (2 left) Nb55Ti for welding tests & qualification 520 x 520 x 4 22 (1.5 left)Ultrasonic test OK Nb for HOM – DQW manufacturing 210 x 210 x 35 22Heraeus; UT currently being performed Ø60 L= Heraeus; UT performed on Ø50, unexploitable; Metallography currently being performed, very inhomogeneous grain structure, probably out of spec.; Ø25 too long, rest will be used for UT calibration Ø85 L= Ø50 L= Ø25 L= Ø60 L= NingXia; UT performed on Ø50, not fully exploitable due to grain directionality and lack in calibration material; Metallography currently being performed, results look promising. Ø85 L= Ø50 L= Ø25 L= x 100 x 40 77Ultrasonic test OK

Material summary (Nb + MISC) ITEMDimensions [mm] Ordered [n o ] Received [n o ] Comments Nb for HOM – RF manufacturing 272 x 70 x Tender closed on the 25 th of September, material will be ordered this week 44 x 90 x x 160 x x 180 x 4 1- Ø85 L=30 4- Nb for calibration blocks Ø85 L= Nb for electro-hydro forming No dimensions -- Nb for high strain rate forming No dimensions --Study on various strain hardening rates Nb for cavity body DQW 4 mm thick plate -- Material for 2 cavities Nb for beam port cavity DQW 3 mm thick plate -- Nb55Ti for interface Nb-Ti for cavity DQW No dimensions LN for flanges cavity DQW No dimensions --

Additional material? Tuning system? Cryostat? Connections?