Permit to Work System TDI-Brooks International December 2014.

Slides:



Advertisements
Similar presentations
Health & Safety Life Book AM ST p. 1 v.01 - Jan.19, 2011 Confined Space Confined Space / Permit and NON - Permit space Definition Confined space.
Advertisements

Health & Safety Expectations Build Contractors Including expectations for any H&S Site Audit/Inspection Documentation & Management Expectations Site Audit.
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
Job Loss Analysis Overview
JOB SAFETY ANALYSIS Presentation. Job Safety Analysis Break down the task into steps Identify the hazards connected with each step State how you will.
CONTROL OF HAZARDOUS ENERGY “LOCKOUT/TAGOUT” (LOTO)
Confined Space Safety An overview of the hazards and regulatory requirements associated with confined space work.
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
12 Safe Maintenance Rules HAZARD ISOLATIONS. August 6, 2015 | 2 To protect the persons who intervene on a facility, to be sure of the energy absence (electricity,
PERMIT REQUIRED CONFINED SPACES PERMIT REQUIRED CONFINED SPACES.
Workplace Safety Young Workers. Why is this important? Canadian statistics show that one in seven young workers are injured on the job. The leading causes.
Lumbermen’s Underwriting Alliance
Material Safety Data Sheets Why do you as a Manager, cook or CN Helper need to know about Material Safety Data Sheets.
Risk Management (Safe Work Method Statements)
DOC ID © Chevron 2005 Gulf of Mexico Permit to Work (PTW) KnowledgePlanet Awareness & Quiz March 2008.
JOB HAZARD ANALYSIS Example Guide.
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
Process Safety Management
“Incident Free Starts With ME”
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Elkhorn Construction Inc..  A BJSA is a tool in which we plan our work, identify hazards, mitigate the hazards, and assign the responsible people. 
Hot work permit.
Hot Work Procedure and Permit
Job Safety Analysis (JSA)
Post Safety Forum 2015 POST Online Orientation. Safety Tools Risk Management Documentation Confined Space Requirements Job Safety Analysis Planned Job.
Training Instructions Hit Enter or Click “Next” for slide progression Hit backspace to go to previous slide Read Slides Fill in Quiz as You Go Write Down.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
HSE Officer Nov Who is the HSE Officer? SOP-GEN-2014C The First Mate is the designated HSE Officer on TDI-Brooks vessels.
JOB SAFETY ANALYSIS Presentation. ANY New Job/ Activity Recognize the Hazards Plan the work Protect the people Before starting ANY new job/ activity,
TDI-Brooks International Nov 2015
NS5 Session #2 Work Orders Turning Standard Jobs into WOs and completing them Oct 2015.
Hazard Recognition and Risk Analysis Why follow safe work practices?
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Hot Work Permit Osan AB Fire Emergency Services.
NS5 Session #1 Introduction to NS5 The NS5 System Oct 2015.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Permit-Required Confined Spaces 29 CFR Intro to Confined Space INSTRUCTIONAL GOAL: The participant will understand the requirements and definitions.
Our Journey to Zero Beliefs
Permits Web Innovations 2017.
We always have time to work safely
NS5 Session #3 Unplanned Maintenance
Site Safety.
How to Navigate IRB Paperwork.
How to Navigate IRB Paperwork.
Issue Entry Permit Training.
Introduction to OSHA (Part 1)
Look. Think. Do. © Workplace Safety and Health Council.
Introduction to OSHA (Part 1)
Safety rules for works supervisors
Chapter 9 Safety Permit Systems
PTW – Permit To Work. What is PTW? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific time.
Goodyear Napanee Contractor Safety
First Break To establish minimum safety requirements when performing a first break “First Break” – Refers to the initial opening of piping/equipment.
Safety is part of our culture at Halliburton
RISK ASSESSMENT AND METHOD STATEMENT
How to Navigate IRB Paperwork.
Oleh : Ir. Sjaifuddin Thahir, MSc.
Control of Knife and Hand Cutting Tools
Please read this before using presentation
How to Navigate IRB Paperwork.
The toolbox Entry into confined spaces: Can be UNFORGIVING;
Introduction to OSHA (Part 1)
SAFETY STANDARDS FINAL JEOPARDY
Confined space.
Introduction: Phosphates’ Life-Saving Rules.
Start JSA Team JSA Note Inspect Site Hazards Resolve JSA Sign Permit
Isolation Procedure Topic 2, Unit 6.
Welcome back to 2016 Memory Jogger – Mobil Retail M&R Activities
Presentation transcript:

Permit to Work System TDI-Brooks International December 2014

Basics TDI-Brooks’s permit to work system is described in the SMM in SOP-GEN-012B A permit to work system is a formal written system used to control POTENTIALLY HAZARDOUS WORK.

The 5 Why’s of a Permit Why do we have to write permits? Federal Law requires a written permit for potentially dangerous work.

The 5 Why’s of a Permit Why did they make it a law? Because while many people die on the job each year, these activities have the highest fatality rates.

The 5 Why’s of a Permit Why did more people die doing this type of work? Because the workers are exposed to greater hazards.

The 5 Why’s of a Permit Why weren’t they more careful to work safely? Because they didn’t recognize the hazards or were so used to them that they became complacent.

The 5 Why’s of a Permit Why would they allow themselves to become complacent if it was so dangerous? Fatigue, rushing to finish the job, frustration, didn’t think it was important, nothing bad had happened before.

Permits and Risk Assessment The permit isn’t the point! The point is to slow down, recognize the risks and have a plan to protect yourself and others.

Permitted Work TDI-Brooks requires a permit for: Hot Work Working at Heights (over 6 ft off the deck) Energy Isolation Confined Space

Definitions Hot Work- (29 CFR 1915) “Any riveting, welding, burning, or other fire or spark producing operations” If it produces a spark, it needs a permit

Definitions Working at Heights (SMM) Any work 6 feet or more above the deck Fall protection must be worn unless a risk assessment determines that it would create a greater hazard.

Definitions Confined Space Any entrance into a registered permit- required confined space on the vessel Confined Spaces on all vessels are listed in the SMM.

Definitions Energy Isolation (Lockout/ Tagout ) 29 CFR 1915 Required to prevent activation of equipment or release of stored energy that could harm a person

Definitions Authorized Person (SMM) The person empowered by TDI to approve and sign a permit

Definitions Authorized Persons: (SMM) Working at Heights- Master or Mate Energy Isolation or Hot Work- Chief Engineer

Definitions Authorized Persons: (SMM) Confined Space- Must be signed by BOTH Master and Chief Engineer

Definitions Alternate Authorized Persons The Port Engineer may authorize any permit when a Master, Mate or Chief Engineer is not available

Risk Assessment Before performing a task, you need to assess the risks. A Job Safety Analysis (JSA) is integrated into each permit and should include a rescue plan for the worker if needed.

Where to find permits Permits are located on the ship web pages on the TDI Forms/ Permits page.

In Doubt? Print it out! The first two pages of the Permit contain a flowchart and detailed instructions on how to complete the permit, who is authorized to sign it and how to enter it in the NS5 work order.

Flowchart- Page 1 of the Permit The flowchart shows the process for documenting ALL work – planned, unplanned, with or without a permit.

Instructions Page 2 of Permit The second page states who the Authorized Person is and how to enter the WO into NS5.

Read Instructions!! The instructions will tell you exactly what to enter in each section:

Work Description Page 3 of Permit Fill out ALL info

Special Permits & PPE More than one permit may be needed. Shift change is documented in this section PPE is documented next

JSA (from flowchart) Everyone participates in the JSA– INCLUDING CONTRACTORS

JSA Risk Assessment Risk Analysis is included in the Permit as a JSA. Include a rescue plan in JSA for Working at Heights and Confined Space What could go wrong? Plan for it here.

Hazards The section below the JSA will include an list of potential hazards and controls to mitigate them. Weather and sea state would be included here.

Authorized Person Signs Post Copy at work site/ Original on Bridge SIMOPS meeting if needed AFTER the JSA–

Controls Controls apply both before work begins AND after work has been completed.

Controls Based on the pre-start controls, which type of permit is this? After completing all the previous steps and final checks before starting, you may BEGIN WORK.

12 Hour Rule Working at Heights and Hot Work permits are only good for 12 hrs. If work will continue after the 12 hrs, a new permit must be issued. ** The only exception to the 12 hr rule is Energy Isolation. It may take weeks to get a part in. A single EI permit will suffice until the repair can be made.

Change of Shift If permitted work crosses into the change of shift, the new workers must complete a new permit, but can review the JSA from the previous permit. So– New shift workers = new permit But- can use the previous shift’s JSA - as long as it is reviewed with all new workers

When work is complete… the paperwork continues When work is finished, you must complete the After Task Controls and the Authorized Person must sign that the job is complete.

Finally! The after task completion is to ensure : When all of these steps are completed, you are done! Make sure the correct copy is filed on the bridge–( the one with all the final checks and signatures)