F. Arteche EMC studies for CMS tracker upgrade Status & Plans.

Slides:



Advertisements
Similar presentations
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Advertisements

Jornadas Futuros Aceleradores, Barcelona May8th ‘09 R&D IFCA Iván Vila Álvarez Instituto de Física de Cantabria.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
FTD-ILD sub-detector power distribution system prototype based on Supercapacitors I.Echevarria, M. Iglesias, A. Pradas, FJ. Piedrafita, Dr. F. Arteche,
IFCA Activities in R&D for ILC Instituto de Física de Cantabria [CSIC-UC] Spain.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Off-beam Infrastructure for AIDA (A proposal for discussion) Iván Vila Álvarez kick-off meeting, CERN, Feb 16th 2010.
EMC review for Belle II (Grounding & shielding plans) Sub-systems ( XXXXX)
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
ITAINNOVA TA: Scientific & Administrative issues Electromagnetic Compatibility Facility for electronics noise and grounding diagnostics (WP12 – Task 12.2)
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Structural and environmental monitoring of tracker and vertex systems using Fiber Optic Sensors Iván Vila Álvarez IFCA (CSIC-UC) ILWS ECFA Vertex session,
Thermo-mechanical infrastructure: Environmental Monitoring with FOS AIDA WP9.3 meeting November 21 th DESY, Hamburg. David Moya Martin Instituto de Física.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SiD LoI preparation workshop, SLAC 3th March 2009 Spanish Network LoI contribution Iv á n Vila Á lvarez Instituto de F í sica de Cantabria [CSIC-UC]
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Power Working Group Summary Philippe Farthouat Magnus Hansen DC-DC Plug-in Module based on Rad Tol AMIS2 ASIC.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
NEWATLASPIX: Development of new pixel detectors for the ATLAS experiment upgrade Giulio Pellegrini.
FOS monitoring for Off-beam infrastructure AIDA 2 nd Annual meeting WP9.3 Iván Vila Álvarez Instituto de Física de Cantabria (CSIC-UC )
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
F. Arteche EMC issues for Tracker upgrade. 1 de 19 CMS / ATLAS Power working group Paris- France, 23 September 2009 OUTLINE 1. Introduction. 2. EMC strategy.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Research activities at ITA for future accelerator M. C. Esteban.
F. Arteche, C.Esteban, (ITA) I.Vila(IFCA) Electronics integration studies for CMS tracker upgrade.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Structural and Environmental monitoring with FOS E. Currás, D. Moya,I. Vila, A.L. Virto, Instituto de Física de Cantabria (IFCA-Santander) J. G. Carrión,
DC-DC Conversion Studies – Status Report from Aachen Tracker Upgrade Power WG Meeting February 13 th, 2009 Lutz Feld, Rüdiger Jussen, Waclaw Karpinski,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
Giulio Pellegrini 27th RD50 Workshop (CERN) 2-4 December 2015 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona 1 Status of.
8  February 2011 FOS irradiation Results and Omega Shape manufacture D. Moya, I. Vila, A. L. Virto, F.J. Muñoz, J. Duarte Instituto de Física de Cantabria.
Noise propagation issues in complex power cables for HEP detectors M. Iglesias, I. Echeverria,F. Arteche 12 th Meeting of the Spanish Network for future.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Readiness of the FOS monitor for DESY’s thermo-mechanical mock-up. Kloster Seeon, May 19 th DEPFET Workshop D. Moya, I. Vila, A. L. Virto., J.González.
Dr. F.Arteche Instituto Tecnológico de Aragón (ITA) Belle II: Grounding and Electronics Integration Issues.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
EMC issues for cabling and racks layout design. (Belle II – Grounding) F.Arteche.
T-THERMO-MECHANICAL MODEL FOR THE LC FORWARD TRACKER Ciemat, October 27 th, FPA2013ILC workshop D. Moya, I. Vila, Instituto de Física de Cantabria (CSIC-UC.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
Real-Time FOS monitor DEPFET PXD and SVD Workshop in Göttingen E. Currás, D. Moya, I. Vila, A. L. Virto. Instituto de Física de Cantabria (CSIC-UC ) G.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
Readiness of the FOS monitor for the thermal mock-up and recent activities. PRAGUE, January 7 th VXD Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,
R&D LINE ON ACTIVE PIXEL DETECTORS P1.6 Fiber optic enviromental and structural vertex monitor. Ciemat, October 27 th D. Moya, I. Vila, A. L. Virto., J.González.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
PXD meeting, 22 June 2011 New omega shape and fibers irradiation D. Moya, I. Vila, A. L. Virto, F.J. Muñoz, J. Duarte Instituto de Física de Cantabria.
ILD Silicon Tracking Status Report
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Results achieved so far to improve the RPC rate capability
Readiness of the FOS monitor for the thermal mock-up and recent activities. Kloster Seeon, 16th DEPFET Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,
AIDA WP12.2 : Detector Characterization Facilities EMC characterization Fernando Arteche.
EMI studies of different switched converters: setup and lessons learnt
DC-DC Conversion Studies – Status Report from Aachen
Fiber Optic Transmission
Presentation transcript:

F. Arteche EMC studies for CMS tracker upgrade Status & Plans

1 de 14 CMS / ATLAS upgrade power working group Aachen, 21 September 2010 OUTLINE 1. Introduction – Motivation 2. EMC project for tracker upgrade. 3. Working Packages –Status & Plans 4. Conclusions

1. Introduction - Motivation New FEE requirements forces to install DC-DC converters close to FEE (inside sub-detector modules). –The high current demanded by each power channel However DC-DC converters are a very noise source –It is necessary minimize the noise coupling between FEE – DC-DC units –It is necessary to minimize the total noise inside sub-detector volume A large R&D effort is planned and taking place to develop a DC-DC switching converter to operate under high magnetic field with low noise emissions inside tracker volume –GREAT effort form CERN & Aachen CMS / ATLAS upgrade power working group Aachen, 21 September 2010 Today Upgrade 2 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September EMC project for tracker upgrade EMC immunity studies for CMS tracker upgrade –IFCA & ITA – Approved by CMS MB on November 2009 Long & detailed review process (Tracker & CMS upgrade MB ) Proposal was welcomed because cover critical integration issues for the detector First stage of the EMC strategy – long term strategy for CMS The main goal of the project is: –To define preliminary rules to ensure the integration of main components (Detector, FEE, Power network and DC-DC ) –To define design strategies that allow increasing the immunity of the Detector-FEE unit. It is divided in two parts: –Noise coupling mechanism at system level Impedance & Power Network effects on noise emissions –New high immunity systems to EM noise 3 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September EMC project for tracker upgrade This proposal has been included in a bigger project as part of the Spanish contribution for future colliders. –Title: R&D on detectors for future colliders It has been submitted to Spanish research program for founding –Project members: Centro Nacional de Microelectrónica Barcelona (CSIC) Instituto de Física de Cantabria (CSIC-UC) Instituto Tecnológico de Aragón (G. Aragón) The project covers several aspects of the R&D for future colliders –Sensors –EMC studies at system level –Optical fiber sensors to increase EMC immunity 4 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September EMC project for tracker upgrade This proposal has been approved - July 2010 It is a 3 years project Founding for the EMC tracker upgrade project (300 K€) EMC studies: 140 K€ FOS studies: 160 K€ Teams involved in the project –IFCA – 8 members (Physisics & Engineers) Dr. Fernandez García (100%), RyC Broad instrumental expertise;. Dr. R. Jaramillo Echeverria (100%), Electronic Dr. C. Martínez Rivero (50%) CSIC Tenured Prof. A. Ruiz Jimeno (50%), U. Cantabria full Dra. A. Lopez Virto (50%), U. Cantabria tenured Dr. I. Vila Álvarez (100%) CSIC Tenured researcher F.J. Muñoz Sanchez (100%) CSIC FPI D. Moya Martín (100%) CSIC Engineer; Mechanical design, carbon composites, ILD. –ITA – 4 members (Engineers) Dr. Fernando Arteche (100%) Electrical M. Cristina Esteban Lallana (50%) Electrical Iván Echeverria Ciaurri (50%) Electrical Fco Javier Piedrafita Orduna (50%) Electrical ITA 5 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September Working packages – Status & Plans The project has started in 2010 It is divided in four working packages –WP 1: Power network impedance characterization –WP 2: Noise propagation effects in power network –WP 3: Noise immunity test in FEE prototypes –WP 4: Validation of EM immune OFS for temperature, magnetic field and strain: Effect on overall EM noise Strong collaborations with other groups is planned –FERMILAB – M. Johnson –Aachen – L. Feld & K. Klein –CERN – F. Faccio & G. Blanchot –Others collaborations are welcome 6 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September Working packages – Status & Plans WP 1: Power network impedance characterization –The aim of WP1 is to define and characterize the impedances connected to the DC-DC power converter It defines the noise (conducted and radiated) levels emitted by the DC-DC power converters AT SYSTEM LEVEL Characterization of the electromagnetic environment –Impedances ( FEE & Power Bus) –Multiple units 7 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September Working packages – Status & Plans WP 1: Power network impedance characterization –Preliminary results ( More details during poster session ) Strong dependence of DM noise emissions respect –Input & output Impedance –Granularity Strong dependence of CM noise emissions respect –Stray capacitance Impedance –Input voltage –These conclusions have to be confirmed with a special test set – up for noise emissions at system level Set-up preparation has already started. –First results - October 2010 –Final results – December 2010 –We are open to test CERN & Aachen group´s DC-DC converters with the system test set-up at ITA Still to discuss 8 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September Working packages – Status & Plans WP 2: Noise propagation effects in power network –The aim of WP2 is to define the key points that allow designing the power network to minimize the effects of noise currents generated by DC-DC converter. PCB or twisted pair cables – Ability to radiate Slots in the CF frame - Cable inside carbon fibre structure DC-DC layout effects (conducted and radiated) –This WP is carrying out in two stages: Simulations models –Transmission line models - MATLAB code –FEM –EMA3D or COMSOL - Antenna models »Long experience at ITA in EMC simulation Real conducted and radiated test (Anechoic chambers) –Radiated noise from power network –Noise distribution on power networks 9 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September Working packages – Status & Plans WP 2: Noise propagation effects in power network –This WP will be focused on double stack layout Strong collaboration with FERMILAB –It was discussed with Marvin Johnson on July –Simulation phase has been already started First results second part of 2011 –Real test phase is planned for end 2011 or beginning de 14

CMS / ATLAS upgrade power working group Aachen, 21 September Working packages – Status & Plans WP 3: Noise immunity test in FEE prototypes –The aim WP3 is to define the FEE immunity on prototypes: Impact of integration strategies in the overall design. –Conducted immunity test –Radiated immunity test (ITA facilities). –Some preliminary work has been done during 2009 Analysis of coupling mechanism in old tracker –Already presented in TWEPP 2009 & Tracker upgrade meetings (H field at pitch adapter) –Future plans – two options Test FEE prototypes of new Tracker system Test old FEE in new topologies –These tests are planned for 2012 –We expect to collaborate with other groups 11 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September Working packages – Status & Plans WP 4: Validation of EM immune OFS for temperature, magnetic field and strain: Effect on overall EM noise –The purpose of WP4 seeks out the implementation of OFS to substitutes previous measuring systems based on cooper cables. Different methods for attaching the fibres to carbon composites supports Architectures for sensor distribution network EMC factor measurement (Copper Vs FOS) –Main FOS activities Complete the market survey. Proposal of fiber routing for CMS upgraded tracker Testing of standalone fibers (irradiation). CF test structures with bonded or embedded fibers. Mechanical expansion and compression test under several thermal and humidity conditions. Experimental validation of OFS vs. electrical expansion gauges. Comparison with FEA simulations 12 de 14

CMS / ATLAS upgrade power working group Aachen, 21 September Working packages – Status & Plans WP 4: Validation of EM immune OFS for temperature, magnetic field and strain: Effect on overall EM noise –First activities (During 2010) Host material impact –Fiber embedded in hosting material (CF laminate) Irradiation effects –First test on going Irradiation campaign at CNA (Sevilla) » Synchrotron 18Mev ( October 2010) Collaboration with INTA – Madrid & CNM-Barcelona –Some prototypes & test 13 de 14

ITA & IFCA have started this year a new project focused on integration issues at system level This project is supported by Spanish R&D program –Some founding has been received –Collaboration with CNM-Barcelona R& D project divided in 4 WP WP1, WP2 & WP4 has started –WP1 focused on impedance effects on noise emission is finishing –WP2 focused on power network issues has recently started –WP4 focused on development of high immunity systems is on going CMS / ATLAS upgrade power working group Aachen, 21 September Conclusions 14 de 14