Andrew McNab - Manchester HEP - 10 May 2001 EDG / Globus Meeting, 5-7 April “Obtaining an up-to-date understanding of the state of the Globus Toolkit,

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

INFN & Globus activities Massimo Sgaravatto INFN Padova.
Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Data Management Expert Panel. RLS Globus-EDG Replica Location Service u Joint Design in the form of the Giggle architecture u Reference Implementation.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
The Anatomy of the Grid: An Integrated View of Grid Architecture Carl Kesselman USC/Information Sciences Institute Ian Foster, Steve Tuecke Argonne National.
Preparation of D1.7 Massimo Sgaravatto INFN Padova.
Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.
Andrew McNab - EDG Access Control - 14 Jan 2003 EU DataGrid security with GSI and Globus Andrew McNab University of Manchester
WP 1 Grid Workload Management Massimo Sgaravatto INFN Padova.
A conceptual model of grid resources and services Authors: Sergio Andreozzi Massimo Sgaravatto Cristina Vistoli Presenter: Sergio Andreozzi INFN-CNAF Bologna.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
Status of Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
The Globus Toolkit Gary Jackson. Introduction The Globus Toolkit is a product of the Globus Alliance ( It is middleware for developing.
Massimo Cafaro GridLab Review GridLab WP10 Information Services Massimo Cafaro CACT/ISUFI University of Lecce, Italy.
Introduction Globus Toolkit™ Developer Tutorial The Globus Project™ Argonne National Laboratory USC Information Sciences Institute
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
4b.1 Grid Computing Software Components of Globus 4.0 ITCS 4010 Grid Computing, 2005, UNC-Charlotte, B. Wilkinson, slides 4b.
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
Globus Computing Infrustructure Software Globus Toolkit 11-2.
1 Globus Developments Malcolm Atkinson for OMII SC 18 th January 2005.
Kate Keahey Argonne National Laboratory University of Chicago Globus Toolkit® 4: from common Grid protocols to virtualization.
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
Thoughts on the ATF of the DataGrid 24 th –25 th May 2001 Steve Fisher / RAL.
ARGONNE  CHICAGO Ian Foster Discussion Points l Maintaining the right balance between research and development l Maintaining focus vs. accepting broader.
Report from Amsterdam Massimo Sgaravatto INFN Padova.
GT Components. Globus Toolkit A “toolkit” of services and packages for creating the basic grid computing infrastructure Higher level tools added to this.
INFSO-RI Enabling Grids for E-sciencE The US Federation Miron Livny Computer Sciences Department University of Wisconsin – Madison.
CERN Technical Coordinators Report PTB, 3 rd July 2002 Bob Jones.
The Anatomy of the Grid: An Integrated View of Grid Architecture Ian Foster, Steve Tuecke Argonne National Laboratory The University of Chicago Carl Kesselman.
Grid Workload Management Massimo Sgaravatto INFN Padova.
Virtual Data Grid Architecture Ewa Deelman, Ian Foster, Carl Kesselman, Miron Livny.
Andrew McNabETF Firewall Meeting, NeSC, 5 Nov 2002Slide 1 Firewall issues for Globus 2 and EDG Andrew McNab High Energy Physics University of Manchester.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
28 March 2001F Harris LHCb Software Week1 Overview of GGF1 (Global Grid Forum) and Datagrid meeting, NIKHEF, Mar 5-9 F Harris(Oxford)
Pegasus: Running Large-Scale Scientific Workflows on the TeraGrid Ewa Deelman USC Information Sciences Institute
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
GRIDS Center Middleware Overview Sandra Redman Information Technology and Systems Center and Information Technology Research Center National Space Science.
INFSO-RI Enabling Grids for E-sciencE OSG-LCG Interoperability Activity Author: Laurence Field (CERN)
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
Andrew McNabSecurity Middleware, GridPP8, 23 Sept 2003Slide 1 Security Middleware Andrew McNab High Energy Physics University of Manchester.
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
Planning Ewa Deelman USC Information Sciences Institute GriPhyN NSF Project Review January 2003 Chicago.
CERN, DataGrid PTB, April 10, 2002 CrossGrid – DataGrid Collaboration (Framework) Marian Bubak and Bob Jones.
Andrew McNabGrid in 2002, Manchester HEP, 7 Jan 2003Slide 1 Grid Work in 2002 Andrew McNab High Energy Physics University of Manchester.
X.509 Proxy Certificates for Dynamic Delegation Ian Foster, Jarek Gawor, Carl Kesselman, Sam Meder, Olle Mulmo, Laura Perlman, Frank Siebenlist, Steven.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
Andrew McNab - Globus Distribution for Testbed 1 Globus Distribution for Testbed 1 Andrew McNab, University of Manchester
Security Middleware Andrew McNab University of Manchester.
Report from DataGrid Technical Board Massimo Sgaravatto INFN Padova.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli Wide Area Workload Management Work Package DATAGRID project Parallel session report Cristina Vistoli.
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
Protocols and Services for Distributed Data- Intensive Science Bill Allcock, ANL ACAT Conference 19 Oct 2000 Fermi National Accelerator Laboratory Contributors:
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
Andrew McNab - Globus Distribution for Testbed 1 Status of the Globus Distribution for Testbed 1 Andrew McNab, University of Manchester
Current Globus Developments Jennifer Schopf, ANL.
CERN 1 DataGrid Architecture Group Bob Jones CERN.
June 2000 Globus UK Workshop R. Hughes-Jones Globus Current and Future Organizational / Management uHow do we keep informed of work in UK / HEP? èSimple.
EGEE Middleware Activities Overview
Pegasus and Condor Gaurang Mehta, Ewa Deelman, Carl Kesselman, Karan Vahi Center For Grid Technologies USC/ISI.
Presentation transcript:

Andrew McNab - Manchester HEP - 10 May 2001 EDG / Globus Meeting, 5-7 April “Obtaining an up-to-date understanding of the state of the Globus Toolkit, and communicating to Globus project members the goals and concerns of EDG.” “Defining a framework for future joint work that would be effective and mutually beneficial.”

Andrew McNab - Manchester HEP - 10 May 2001 Attendees ISI: Carl Kesselman, Laura Pearlman, Ewa Deelman, Ann Chervenak ANL: Ian Foster, Steve Tuecke, Bill Allcock, Mike Wilde, other experts at different times. EDG: Steve Fisher (ATF), Francesco Prelz and Massimo Sgaravatto (WP1), Wolfgang Hoschek and Brian Tierney (WP2), Alex Martin (WP3), German Cancio (WP4), Andrew McNab and Franco Semeria (WP6), Fabrizio Gagliardi (PM).

Andrew McNab - Manchester HEP - 10 May 2001 Decisions: Joint activities Include U.S. sites in the “production prototype” system. At least ANL and ISI, perhaps others— Caltech? UW? Others? Accelerate development of packaging and certain other Globus elements, to ensure that they are available for use by EDG group. Attempt to transfer some EDG technology (e.g., dynamic accounts, resource broker) to U.S., for use in say GriPhyN experiments.

Andrew McNab - Manchester HEP - 10 May 2001 Decisions: Globus activities MDS-2 (have alpha already): GRIS performance, Index plug in, etc. GridFTP (have alpha already) GRAM job manager fix All this handled via packaging Replica management (alpha: integration with GDMP?) Define U.S. nodes to integrate into tests Prototype community authorization server (CAS)

Andrew McNab - Manchester HEP - 10 May 2001 Decisions: EDG activities Use Globus 2.0 for M9. Group server (ie for grid-mapfile) EDG-specific data converters (for GRIS) Dynamic accounts (collaboration on requirements) Scheduler “(in addition to making all of this work)”

Andrew McNab - Manchester HEP - 10 May 2001 Detailed schedule Apr 30: MDS II A1, Replica requirements May 31: MDS II A2 (Indexes), initial repackaged release (“Globus 2.0A”) Jun 30: Group CAS? Repackaged MDS 2.0 Jul 31: Final rep mgmt package - Feature Freeze Aug 31: Code Freeze (Sep 30: All done…)

Andrew McNab - Manchester HEP - 10 May 2001 Need for more communication Globus CVS and internal developer lists accessible Legal framework: Consortium for Open Grid Software Continue Globus - EDG meetings Start Globus - EDG mailing lists for interested parties

Andrew McNab - Manchester HEP - 10 May 2001 Future meetings Second joint meeting and Globus tutorial at EuroGlobus in Lecce (June 18-22) Third joint meeting after GGF2 in Washington Fourth joint meeting at GGF3 in Rome

Andrew McNab - Manchester HEP - 10 May 2001 Summary Globus 2.0 will emerge over the summer Globus Project has committed to specific milestones EDG has committed to testing + using it This all relies on developing a relationship with EDG as “collaborators rather than customers.”