ORBUMP Power Supply... 16x3 SCR’s Pulse Forming Network (PFN) - looks like a very slow transmission line. Flat top ~ (10 usec)*(number of cells). Reduced.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
THIS PRESENTATION HAS BEEN UPLOADED TO THE WIKI. Motors, Controllers, and Regenerative Braking.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
IEEE’s Hands on Practical Electronics (HOPE) Lesson #: Inductance.
Linac Marx Modulator Update Trevor Butler 7/22/2015.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Anders Sunesson RF Group ESS Accelerator Division
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
The “Run II Era” The proton source is very close the the specifications in the Run II Handbook. Although it’s the highest priority, support of collider.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
The Proton Source (mostly Booster) in the “Collider Era” Eric Prebys February 3, 2003.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PAC Meeting, December 12, Prebys 1 The Problem.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
DC Machine & Transformer
Proton Economics Eric Prebys FNAL Accelerator Division.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Pelletron status update Main Injector Departmental Meeting November 11 th, 2009 L. Prost.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Status of HESR 18th March Gießen Dieter Prasuhn.
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
How to run ions in the future?
Junji Urakawa (KEK) for ATF International Collaboration
Impedance working group update
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
UITF Conduct of Operations Review
Tuesday 20 September 2011.
KFA10 status 03/06/2019 Currently:
Presentation transcript:

ORBUMP Power Supply... 16x3 SCR’s Pulse Forming Network (PFN) - looks like a very slow transmission line. Flat top ~ (10 usec)*(number of cells). Reduced to 6 cells some time ago. Reduced to 4 last Thursday To magnets 30 kA Step-up transformer Controller Charging SCR ORBUMP steers beam out through stripping foil during injection

Recent Problems Last Thursday, a cooling hose broke. –HV bus bar broke down –Tuning rod melted Took advantage of the “opportunity” –Reduced PFN from 6 to 4 cells (should reduce heating of magnets). –Replaced all water hoses. –Removed unused inductors. When powering back up… –An SCR and some associated electronics blew –Replaced, happened again. –Disconnected all 48 SCR’s and verified all connections. Found some minor problems. Power came up after that, but… New PFN impedance changed V to I ratio. –When we attempted to raise V to compensate, ORBUMP started missing triggers, causing huge period 1 losses (which had nothing to do with LLRF!!) –Problems tracked down (after several days) to transient noise on the firing card. –Works now (?!?!?)

Effect of Shorter Pulse ORBUMP Temperatures

Plans for ORBUMP Immediate future (next week or so) –Improved water distribution (new manifold, some different plumbing). –Replace inductors with rebuilt spares. –Lucite tuning rods -> G10 (won’t melt). Longer term. –Buy new capacitors ($1K each) –Replace (48) SCR network with modern (4 or 8) network. On the table for a while Just got bumped up in priority. Goal to be in by summer. –New controller? Possibly use MP02 design directly?

RF Cavity Update All university fabrication under way or complete. Parts have started to arrive. All look OK so far. Assembly fixtures being constructed at MI-60. Still looks good for summer shutdown.

Collimators Dust still settling from review, but seems to have passed. Design more or less complete. Working out details of installation logistics. Still looks good for the summer shutdown.

Dogleg Replacement Meeting next week to work out details of design. Important to understand field quality requirements. Pulsed “anti-septum” Pulsed Magnet Kicked Beam Circulating Beam Just before Extraction