Appeal of Proposed Real Time Market Mitigation Measures Texas Nodal Market May 18, 2004.

Slides:



Advertisements
Similar presentations
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Advertisements

©Ofcom ERG views on continued development of roaming regulation March 2007.
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Consideration of Price Caps Reduction Meeting of the Board of Governors of the California ISO By David Parquet Vice President Enron North America Corp.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
Hedging Energy in the New Marketplace Scott E. Thompson Portfolio Director SPP/ERCOT.
1 Competition Policy and Regulation in Hydro-Based Electricity Markets Luiz Rangel Energy Centre, University of Auckland September 2007.
David Schlissel and Cathy Kunkel When, Not If: Bridgeport’s Future and the Retirement of PSEG’s Coal Plant January 23, 2014.
Darden School Social Responsibility and Entrepreneurship April 2, 2007 Recycling Energy: Profitably Mitigating Climate Change Tom Casten Chair, Recycled.
Congestion Pricing: Competitive Locational Prices of Power Stoft (2002)
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
Discussion of Virtual Divestitures: Will They Make a Difference? By Bert Willems Steve Puller, Texas A&M.
Department of Economics and BusinessBIS Phuket
An Emissions Cap Alternative to New Source Review September 27, 1999.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
The California energy crisis Introduction (Wolak March ‘01) –Wholesale: averaged $33 MWH in 1999, $116 MWH in 2000, $310MWH Jan –Natural gas $3-$4.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Electric Restructuring In Pennsylvania Sonny Popowsky Pennsylvania Consumer Advocate May 10, 2007 Institute for Regulatory Policy Studies Transforming.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
1 Märt Ots Energy Market Inspectorate Vilnius Energy regulation in Estonia.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Exchange Rates. An exchange rate is the price of one currency in terms of another. –It indicates how many units of one currency can be bought with a single.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Revisiting the Mitigation Proposal Clayton Greer Constellation Power Source.
International Legal Regulation of the Securities Market Regulation of the securities market is an ordering activity of all its participants and transactions.
Leader-Follower Framework For Control of Energy Services Ali Keyhani Professor of Electrical and Computer Engineering The Ohio State University
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Structuring Electricity Markets Lester B. Lave Electricity Industry Center Carnegie Mellon University January 10, 2008.
Dealing with Failed Deregulation What would Price C. Watts Do?
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Evaluation of Historical and Proposed Alert and EECP Pricing True North Associates 1.
Exchange Rates. An exchange rate is the price of one currency in terms of another. –It indicates how many units of one currency can be bought with a single.
Unit-Specific Bid Limits based on Modified Generic Cost.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Mitigation of Credit Tail Risk Exposure Donald Meek Credit Working Group January 20, 2015.
Module – 5 Pricing.  PRICING OBJECTIVES Growth in sales Improve market share Profit level Control cash-flow Combat competition Maintaining the image.
Today: Finish discussion of trading techniques used in CA Reaction of FERC to these issues Discussion of how FPA limits market Use of antitrust law to.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Setting Payment Amounts for Output of OPG’s Prescribed Assets: The Regulated Contract for Differences Concept IESO Presentation to OEB September 15, 2006.
Mario S. DePillis Jr. USAEE Meeting, Pittsburgh, PA October 25-28, 2015.
Consumer Cost Effectiveness of Carbon Mitigation Policies in Restructured Electricity Market Jared Moore and Jay Apt (adviser) CMU Engineering and Public.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
1 Economic Dispatch Sub-Committee Meeting Ross Baldick Department of Electrical and Computer Engineering The University of Texas at Austin September 24,
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
The Uptake of Management Accounting Practices Among Malaysian Firms in SMEs Sector HAU YIN TING A EPPA 2033 PERAKAUNAN KOS SEMESTER 1 SESI 2014/2015.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Valley Import Constraint Resmi Surendran. Valley Import Constraint Range of SFs – to in valley area – 0.03 to outside valley area Not.
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
PJM Load Product (Consumption Product)
Electricity Wholesale Markets: Designs for a low-carbon future
Transmission: the Critical Link
Business Plan.
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Generation Expansion Daniel Kirschen
FERC Order in Devon Power LLC, et al. ER
Stock Personal Finance.
Unit II – Classification Of Capital
Presentation transcript:

Appeal of Proposed Real Time Market Mitigation Measures Texas Nodal Market May 18, 2004

TNT’s Compromise on Real Time Mitigation Has Incentives for Everyone Except Combined Cycle Plants What’s in it for new investment? –New Investment would be capped at a 14.5 HR, which would have adequate head room (or incentives) for new combined cycle units to recover their capital cost What’s in it for older, less efficient plants? –Most of the older, less efficient gas plants across ERCOT, which typically have low capacity factors, are provided a substantial incentive (as much as cost plus 50%) which allows them to recover their costs and make a profit What’s in it for loads? –Loads acting as a resource would not be mitigated What’s in it for combined cycle plants? –Existing combined cycle plants, which typically have capacity factors greater than 50%, would be mitigated to their short run costs plus 10%, which does not allow for recovery of capital This is clearly unfair and must be changed!

What’s the Problem? We want existing combined cycle generators to take all the financial risk for their investment decision, but we are proposing a mitigation rule that guarantees they won’t recover any of their fixed costs when mitigated It is conceivable, in any system, that transmission topology can change over time, what were good siting decisions by generators are overtaken by change, and relatively new generation can find itself in a constrained area without a competitive solution If this rule were adopted, combined cycle plants would be mitigated to a price that is less than a generator would have made in a cost of service based regulated market…This is neither just nor reasonable.

What’s the Problem? (cont.) Let’s take a simple example: A combined cycle unit, over one year, is mitigated 30% of of it’s hours of operation Typical capital costs range from $18 to $20/MWh for new units Since the unit would not be allowed to recover any of their fixed costs when mitigated, the combined cycle owner is now forced to try to recover their capital costs in the remaining 70% of the hours This means their cost structure is now substantially raised to around $25 to $28/MWh Given how competitive markets work, combined cycle units can’t simply raise their prices in bilateral markets to recover this higher level of costs and therefore they begin the “Death Spiral” The “Death Spiral” is characterized by mothballing or retirement declarations, bankruptcies, and inadequate new resources because banks consider ERCOT an inhospitable market for investment

What Should the Board of Directors Do? The Board needs to level the playing field and ensure that combined cycle plants have the same incentives as other plants, when mitigated The best way to achieve this is to modify the TNT real time mitigation compromise to define costs as long run costs, which includes the actual cost of capital for each unit Or alternatively, the Board could modify the bid cap for combined cycle resources to a 14.5 Heat Rate, which would allow for recovery of capital costs