Operational Planning Jason Smith. Operational Planning Goals –What Ops Planning is –What Ops Planning is not –What rules we operate under –Limitations.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Advertisements

NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
NAESB Coordinate Interchange
NAESB Coordinate Interchange Standard, Version 1 / 0
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
WECC Reliability Management System Tagging Requirements Before the WECC MIS Meeting November 13, 2009 By David Lemmons.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Concerns with RUC Capacity Short Charge and Energy Trades.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Jeremy West Sr. Operations Planning Engineer ECC Update January 28, 2015.
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Peak RCCo Performance Metrics Draft –November 2013.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
Energy Imbalance Market Presented at: The Governor’s Utah Energy Development Summit 2015 Caitlin Liotiris Energy Strategies Power Through Ideas.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
TOP and BA Responsibilities SPP Wind Workshop May 30, 2013.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Scheduling and Operating Transmission Devices in the Nodal Environment.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Generation Adequacy Task Force Meeting April 10, 2014.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Wind Management at MISO
Phase Angle Limitations
Energy and Ancillary Services Design Stream Working Group Meeting 6
Grid Integration of Intermittent Resources
Western Electricity Coordinating Council
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Enhanced Curtailment Calculator (ECC)
Coordinate Operations Standard
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
SPP Wind Workshop: SPP Update on Internal Process Improvements
Presentation transcript:

Operational Planning Jason Smith

Operational Planning Goals –What Ops Planning is –What Ops Planning is not –What rules we operate under –Limitations –How Wind is incorporated in the plan 2

Operational Planning What it is: –Next-to-last line of defense –Keep the lights on –Last-chance outage coordination/review  unique transmission outages every given day –Meets NERC requirement for coordination between RC, TOPs, and BAs 3

Current/Next Day Studies Monday-Friday process with on-call weekend support and re-study as necessary Collect forecasts for the time periods (current and next day) –Load –Outages (gen and trans) –Interchange –Wind Forecast –Gen Dispatch 4

Current/Next Day Studies Cases are built, then contingency analysis performed –Constraints identified – new Temp flowgates created as necessary –Outage schedules adjusted as needed –Operating Guides developed that have not been identified already –Ideally, curtailments found to be necessary on “non- available” resources are identified and coordinated at least day-ahead 5

Operational Planning What we can’t do: –Commit/decommit generation to avoid a curtailment unless reliability dictates such (IM changes this) –Deny outages to avoid a curtailment/re-dispatch unless reliability dictates such (voltage, capacity shortages, etc.) –Deny or reschedule outages to a more opportune, “economic” time –Guarantee that a previously approved outage will still be feasible at the start time 6

Operational Planning Governance –NERC Standards TOP-003, IRO-005, IRO-008 –SPP Criteria Section 5 – RC and member responsibilities –Appendix 7 – Data submission requirements –Appendix 12 – CROW Outage Submission Methodology –SPP Operating Reliability Working Group 7

Limitations We don’t know what we don’t know –Load forecast beyond 7 days is generally a guess –Generation commitment is a guess (today) –No economic impact of outages is studied  i.e.: Possible to redispatch and maintain reliability but at enormous cost “Early” approvals –Attempt to balance need for providing early approvals to submitters without later causing a real-time reliability concern 8

Wind Forecast in Ops Planning Hourly wind forecasts for the next 168 hours (7 days) Major updates every 6 hours (hours 0-6 using current generation as feedback) Forecasts inserted into Ops Plan cases Re-dispatch forecasts based on assumed production –Forecast upon forecast leads to occasional large errors 9

Wind Forecast in Ops Planning (cont.) Short-lead outages reviewed, taking wind forecast into account –Due to the non-dispatchable nature, precautions must be taken to avoid errors –Op Guides stating the necessity of a limitation/ curtailment are required for wind resources – independent of forecast production 10

Questions 11