View of Big Wave Project From Highway 1 and North Capistrano Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living,

Slides:



Advertisements
Similar presentations
Radio waves (remove this text box if you want to put in your own title)
Advertisements

Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.
Current Project Update October 25th 2012 Good Evening!!!
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
Collaboration & Data Sharing for Homeland Security Wilson Fire/Rescue Services North Carolina Wilson Fire/Rescue Services North Carolina Presented by Don.
Changes to the 2011 Landscape Projects Grand Haven.
Glenvar High School Renovations School Board Presentation
International Opportunities in Horticulture at Auburn University Amy N. Wright Department of Horticulture Auburn University.
Central Business District Study Area 1500 acres along Peachtree Pkwy.
The Pathway to Success Creating a Gateway to ISU and a Connection to ‘riverSCAPE’ Goal PS – Initiative 5.
Great Sand Dunes National Park Self-Guided Interpretive Trail.
Phase Difference = Phase Difference = 0.05.
Desgining Your Restaurant Pertemuan 20 Matakuliah: G0424 – Hotel and Restaurant Management Tahun: 2008.
Existing informal footpath (owned by HCA) to connect to Lodge Jct crossing Carriageway widened into wooded area Proposed area for landscaping.
Unit 2 Places.
November 4, 2010 Citizens’ Oversight Committee Presentation to the Presented By: Bill Winslow Program Manager, Bernards.
© MAKO Surgical Corp CONFIDENTIAL - For limited use only. Not for distribution. 1 Direction to MAKO Surgical MAKO Surgical –Address: 2555 Davie Road,
The Grand Canyon Park. About the Grand Canyon Park The Grand Canyon is a steep-sided canyon carved by the Colorado River in the United States in the state.
Slide 1. Central Plains (High Plains) Wind Farm in Wichita County, Kansas, classified as tilled and flat. Inset shows buried cable that was highly visible.
1.
Location: East of the Visitor Center and Scenic Loop on Calico Basin Length: ½ mile round trip Difficulty: Easy; wheelchair accessible Estimated Minimum.
East Hall VOLUNTEERS Discovery Room Shop4Science Cafe PORTICO Rotunda Entrance Foyer Rotunda Vestibule West Hall FIRE EXIT REST ROOMS FIRE EXIT REST ROOMS.
The Delta Science Center at Big Break. The Delta Science Center at Big Break MISSION Recreation Education Restoration Research.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Chapter 1 Career Opportunities.  Residential Design  Remodeling (non-load bearing)  Kitchen Design  Bath/Spa Design  Lighting  Vacation Homes 
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
McLean Campus at Tysons Corner
Q Building Remodel Update September 10, What We Started With…
Urban Planning What are the primary spatial considerations and concerns in city planning?
Premium Transit District 4, Office of Modal Development Making the Connection.
Learning, Health, and Safety Capital Project Alternates and Change Order
Time Remaining 20:00.
Viewed from Pillar Point Bluff preserve and CA Coastal Trail, the Big Wave site lies between Pillar Point Marsh and the open farmed fields of Half Moon.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
Bond Projects Update November 12, Measure J Buchser MSBellomy Street Improvements Wilcox HS“Maker X” Portable Building Pedestrian Bridge at Calabazas.
University of Toronto Mississauga Campus Update to the UTM 2000 Master Plan University of Toronto Mississauga Campus: UTM Master Plan Update Campus and.
Tom Wisner Hall Kings Landing Park Huntingtown, Maryland Calvert County Natural Resources Division Use these buttons to move through the slide.
Please visit :- Marketed by:-AmuraAmura For More Info > Srivari Ananyaa | Luxury Homes.
Please visit :- Marketed by:-AmuraAmura For More Info > Srivari Ananyaa | 2/3 BHK Homes.
Four Mile Run Restoration Pre-Bid Meeting April 25, 2016.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
OPA 15 – What is it? OPA 15 – “Hwy 400 Strategic Industrial Employment Area secondary plan” secondary plan prescribes the nature of development within.
Green Stormwater Infrastructure and Park Improvements
Proposed 2016 Wilmington Parks Bond Referendum
2006 Facilities Master Plan Update Cañada College
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Chabot College Facilities Priorities
Defense Acquisition University PROTOCOL AND OPERATIONS OFFICE
Containing Contaminants at Carlsbad Caverns National Park
Planning Commission November 4, 2010
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
2012 Sarasota Chalk Festival Overview Sarasota City Commission
VILLA BALBOA QUARTERLY MEETING march 22, 2016
Facilities Update November 17, 2017
Southwest State University – 2nd Floor Charter Hall (CH)
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
Stormwater Ecological Enhancement Project (SEEP)
Gaurav’s Office: and (Receptionist)
Facilities Inspected Facility Parking Map Reference Comments
PAD Proposal.
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
The Big 6 Research Model Step 3: Location and Access
Food Stand and Restrooms
Campbell Heights Business Park Development Melissa Johnson City of Surrey –Area Planning South.
Sandy Grove Middle School
The Torre Mia is situated just a few minutes walk from the historical center of Montalcino, in a splendid panoramic position over Val d'Orcia.
BUILDING LIGHTING PLAN PHASE II
START DIRECTIONS QUIZ.
THE GROWTH ENVIRONMENT.
Presentation transcript:

View of Big Wave Project From Highway 1 and North Capistrano Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living, Theater,Landscape Planting

View of Big Wave Project From Highway 1 and North Capistrano Phase 3 and 4 (5 years from Permit): Second 16 Units, Landscaping Visible Phase 5 and 6 (8 years from Permit): Athletic Facilities, Storage Buildings (Wellness Center Complete), Landscape ½ Growth, Two Buildings in Business Park

View of Big Wave Project From Highway 1 and North Capistrano Phase 6 (12 years from Permit): Four Buildings in Business Park, Full Landscaping Phase 7 (15 to 20 years from Permit): Last Four Buildings of Business Park, Remaining ½ of Business Park Parking Lot

View of Big Wave Project From Highway 1 and North Capistrano Completed Project (15 to 20 years After Permit): All Landscape and Wetlands Restoration Removed From View Existing View Without Project

View of Big Wave Project From Ridgeline Radio Tower Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living, Theater, Landscape Planting

View of Big Wave Project From Ridgeline Radio Tower Phase 3 and 4 (5 years from Permit): Second 16 Units, Landscaping Visible Phase 5 and 6 (8 years from Permit): Athletic Facilities, Storage Buildings (Wellness Center Complete), Landscape ½ Growth, Two Buildings in Business Park

View of Big Wave Project From Ridgeline Radio Tower Phase 7 (15 to 20 years from Permit): Last Four Buildings of Business Park, Remaining ½ of Business Park Parking Lot Phase 6 (12 years from Permit): Four Buildings in Business Park, Full Landscaping

View of Big Wave Project From Ridgeline Radio Tower Completed Project (15 to 20 years After Permit): All Landscape and Wetlands Restoration Removed From View Existing View Without Project

View of Big Wave Project From Ridge Trail Looking South Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living, Theater, Landscape Planting

View of Big Wave Project From Ridge Trail Looking South Phase 3 and 4 (5 years from Permit): Second 16 Units, Landscaping Visible Phase 5 and 6 (8 years from Permit): Athletic Facilities, Storage Buildings (Wellness Center Complete), Landscape ½ Growth, Two Buildings in Business Park

View of Big Wave Project From Ridge Trail Looking South Phase 7 (15 to 20 years from Permit): Last Four Buildings of Business Park, Remaining ½ of Business Park Parking Lot Phase 6 (12 years from Permit): Four Buildings in Business Park, Full Landscaping

View of Big Wave Project From Ridge Trail Looking South Completed Project (15 to 20 years After Permit): All Landscape and Wetlands Restoration Removed Existing View Without Project

View of Big Wave Project From Airport Entrance Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living, Theater, Landscape Planting

View of Big Wave Project From Airport Entrance Phase 3 and 4 (5 years from Permit): Second 16 Units, Landscaping Visible Phase 5 (8 years from Permit) Wellness Center Complete, Landscape ½ Growth, Two Office Buildings

View of Big Wave Project From Airport Entrance Phase 7 (15 to 20 years from Permit): Last Four Buildings of Business Park, Business Park Complete Phase 6 (12 years from Permit): Four Buildings in Business Park, Full Landscaping

View of Big Wave Project From Airport Entrance Completed Project (15 to 20 years After Permit): Without Landscaping Existing View Without Project

View of Big Wave Project From Rt. 1 North of Airport Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living, Theater, Landscape Planting

View of Big Wave Project From Rt. 1 North of Airport Phase 3 and 4 (5 years from Permit): Second 16 Units, Landscaping Visible Phase 5 (8 years from Permit) Wellness Center Complete, Landscape ½ Growth, Two Office Buildings

View of Big Wave Project From Rt.1 North of Airport Phase 7 (15 to 20 years from Permit): Last Four Buildings of Business Park, Business Park Complete Phase 6 (12 years from Permit): Four Buildings in Business Park, Full Landscaping

View of Big Wave Project From Rt. 1 North of Airport Completed Project (15 to 20 years After Permit): Without Landscaping Existing View Without Project