PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch. 7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
Advertisements

PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
PHENIX WEEKLY PLANNING 9/6/2007 Don Lynch. 9/6/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upin progress.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
PHENIX WEEKLY PLANNING 10/25/2007 Don Lynch. 10/25/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 11/1/2007 Don Lynch Daylight Savings Time ends Sunday Nov. 4 at 2:00 AM.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 7/19/2007 Don Lynch. 7/19/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 8/9/2007 Don Lynch. 9/9/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch

7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted 2011? HBD West repairStarted9/14 MuID collar removal, MMS move S.DoneDone Disconnect EC and Move to AHDoneDone C-A fold scaffolding, remove lift & ladder, disconnect gas sniffersDoneDone PHENIX techs disconnect water, elect., gas, fibers, RXNP blue cable Mike Rau remove lift wiring, disconnectTOF blower DoneDone Move EC to AHDoneDone Note: C-A Cooling water improvements are planned for this summer. This may involve interuption of water cooling for most/all of the summer. Please let me know if water cooling is necessary for any subsystem operations this summer.

7/26/2007 Weekly Planning Meeting RPC Engineers coordination visitDone Done Reconnect EC for maintenance in AHDoneDone Move MuID collar to AHDoneDone Misc. Subsystem Maint./repair/UpgradeIn Progress10/1 Misc. Infrastructure ImprovementsIn Progress10/1 Install IR floor plates, rolling cart & move manlift to IRDoneDone Remove MPC South(wp needed)DoneDone MPC South upgrade/ bench testsIn Progress9/20 Remove SouthEast Vertical Lampshade7/307/30 Move CM south8/68/6 Remove MPC North (wp needed) 8/68/31 MPC North upgrade/bench tests8/139/20 MuTr Capacitor Decap (wp needed))Started9/ Summer Shutdown Schedule

7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule (cont’d) ItemStartComplete MuTr FEE Prototype (wp needed)8/69/20 DOE Safety Audit (preliminary)8/68/7 Install CM access ladder (wp needed)8/138/17 Move CM North8/138/13 Repair RXNP Phototube8/138/20 Remove HBD East8/158/31 Reinstall MPC North (wp needed) 8/208/31 Summer Sunday Tour8/158/21 DOE Safety Audit (intensive)8/208/31 Install CM Cranepostponed to 2008 C-A arc flash work (no power)8/238/24 Neutron shield support design & install.8/239/30 HBD West Mechanical/Gas Reinstall9/239/24 HBD EAST Mechanical/Gas Reinstall 9/2410/1 HBD Electrical Reinstall9/1710/8 Reinstall MPC South9/209/26 EC Roll In10/810/10 DC East repair10/1110/12 HBD/MPC/Other TBD Commissioning10/110/31 Start of Run 811/111/1

7/26/2007 Weekly Planning Meeting CM Ladder/Stair Shutdown Access PO in progress To be used during shutdown (EC out) only.

7/26/2007 Weekly Planning Meeting CM Ladder/Stair Run Access Features: 60 deg. Alum ships ladder (1 or 2) lifts off to store verticaly for run and/or to access rack doors. (folding rail not shown) Step up platform above rack and cables.

7/26/2007 Weekly Planning Meeting Station 1 access plan Preliminary Design Concept: 3 levels Bottom level just below Station 1 Mid level 2 pcs just below MPC cavity Top level over the beam pipe just above MPC cavity

7/26/2007 Weekly Planning Meeting RPC Factory Work is continuing. Please make sure that all work in 912 is properly planned and approved. If in doubt consult with Don Lynch or Paul Giannotti.

7/26/2007 Weekly Planning Meeting A. Factory Set Up: 1. PHENIX tech support: Gas: John T. Elect: Frank T. Mech: Kenny J. 2. Electrical work moving forward. 3. Tent to be cleaned, floor painted and tent secured 4. HVAC specs 18,000 BTU AC 4 HEPA filters, internally recirculated 5. Gas distribution design TBD B. Safety Issues: Per Yousef’s Minutes from review RPC Factory Issues Calib./testing of SF6 monitors Gas system schematic in progress Gas system construction after approval Fire protection Paul to consult with Joe Lavesques Gas environmental impact Ralf update review numbers when gas system design is complete Electronics/equipment review Factory users safety manual interim Worker plan complete; final productiuon version needed C. Factory Equipment Design & Fabrication (cosmic ray test stand) Ali has suggestions Layout & installation shelves & cranes not going to use jib crane, Riggers will set up A-frame

7/26/2007 Weekly Planning Meeting RPC Mockup Test

7/26/2007 Weekly Planning Meeting RPC Mockup Test

7/26/2007 Weekly Planning Meeting RPC Mockup Test

7/26/2007 Weekly Planning Meeting Other Work Empty (except clean metal waste) and discard old container VTX prototype NCC prototype & electronics Neutron shielding test Shield support design in August Install in September for Run 8 tests

7/26/2007 Weekly Planning Meeting MuTr FEE Upgrade Prototype Station 2: 5 AD board Chassises 3 TX board Chassises Station 1: 3 AD-Board Chassises 2 TX-Board Chassises

7/26/2007Weekly Planning Meeting Station-1 3 AD-Board Chassises 2 TX-Board Chassises Need to be accessible to St-1during test period Need Man Lift No plan how to mount yet

7/26/2007Weekly Planning Meeting Hardware Requirements MuID North + MuTR North (No Magnetic-field at all) Gas : – Phase-I : 8/14 - 8/23 MuID : CO 2 MuTR: Ar + CO2 – Phase-II: 8/23 - 9/10 MuID : CO 2 + C 4 H 10 (recirculation mode) MuTR: CF 4 + Ar + CO 2 (recirculation mode) Dry N 2 : not much flow – Manifold + 1/4 inch tubes Cooling Water : not much flow – Manifold + 1/4 inch tubes Power : – Install 8 AD & 8 TX boards 102W = 8 * 9.4W(AD) + 8 * 3.4W(TX) – Power from MuTr LV module unused 12ch (7.5V * 4A = 30W/ch) LV cable * 12 pairs. LV module->Octant.7 (st-1,st-2). 16

7/26/2007Weekly Planning Meeting Schedule Prior to 8/6: Approval & Permits Aug.6 : Preparation for Installation Aug.13 : Start Installation Aug.16 : Debugging Aug.23 : Production data taking. Sept.10~20 : Finish data taking Sept.10~20 : Start Uninstall After 9/10: Test MuTr for unintended damage Phase-I Phase-II

7/26/2007Weekly Planning Meeting Updating PHENIX Gas System Documentation Most documentation is not up-to-date There are many incomplete or missing documents Needs to meet DOE standards regarding documentation Proper documentation is integral to communicating information safely and efficiently

7/26/2007Weekly Planning Meeting Updating PHENIX Gas System Documentation Collected existing gas system documents Updated gas system spreadsheets Created schematic drawing of the gas pad and mixing house Created a 3-D assembly of the gas pad Updating this documentation helped: – Show how the gas pad and mixing house are actually setup – Call attention to missing components such as check valves – Display layouts and show where free space is for future additions

7/26/2007 Weekly Planning Meeting Safety/Security Notes: 1. There is a DOE ISM audit in August, please schedule cleanup periods for your spaces and your offices. The first thing they will see is the condition of our facility and get a first impression from that. Cleaning the area should also be done at the end of each job during the shutdown. The criteria should be that the area looks cleaner when the job is done than it looked before the job started. 2. Definition of worker planned work - we all need to be able to explain this when the DOE auditor talks to us: This term has replaced "skill of the craft" for work planning at BNL. Worker planned work is more descriptive of what is actually always done. All work is planned whether documented on a green permit or not. Worker planned work does not require a permit, but still requires planning. 3. Wear your badge at all times. The only valid exception is when wearing your badge may interfer with work or create an unsafe condition. Put your badge back on after task is completed.

7/26/2007 Weekly Planning Meeting 5 Year Plan 2007 HBD Repairs, DC (minor) repairs), MPC N&S upgrade,MuTr FEE upgrade prototype, infrastructure upgrades & repairs, misc. subsystem work 2008 MuTr FEE upgrades 1 octant 1&2 S, Cu absorber test, RPC3 S, infrastructure upgrades & repairs, misc. subsystem work 2009 Scaffolding in MMS and MMN, MuTr FEE N&S stn. 2 & 3, MuTr N&S stn. 2 & 3 repairs, RPC2 S&N, RPC3 N, Cu absorbers, infrastructure upgrades & repairs, misc. subsystem work 2010Remove HBD & RXNP, remove beampipe, DC West upgrade, VTX barrel, RPC1 N&S, MuTr FEE stn. 1 N&S, MuTr stn. 1 N&S repairs, infrastructure upgrades & repairs, misc. subsystem work 2011NCC S, FVTX, infrastructure upgrades & repairs, misc. subsystem work 2012NCC N, upgrades contingency & wishlist, infrastructure upgrades & repairs, misc. subsystem work * Years refer to the shutdown year and follow the run with the similar number (i.e. work in 2007 is to be done in the shutdown that follows run 7, and so on)

7/26/2007 Weekly Planning Meeting Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info I’m outa here For the next week or so I’ll be back 8/6