Brussels, 15 November 20041 DANUBE: where we are? E. Sovjáková chairperson of the GIS/ESG ICPDR.

Slides:



Advertisements
Similar presentations
FASRB and the Water Risk Management Samo Grošelj Deputy Secretary, ISRBC.
Advertisements

Danube River Basin Study Sili Liu Example of international basin-wide watershed management.
The Danube Basin ICPDR Philip Weller Danube Leaders Conference, Novi Sad, July 9, 2010 The Ecological Foundations for Development.
Towards a sustainable development in the Sava river basin Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC.
1 DRBM Plan Basis. 2 Visions & Management Objectives for all Significant Water Management Issues …….lead all countries of the DRB towards a joint goal!
International Cooperation in Water Management and Pollution Control in the Danube River Basin Joachim Bendow, ICPDR Executive Secretary 1.
EU S TRATEGY FOR THE D ANUBE R EGION (EUSDR) | Annual Stakeholder Seminar of the Pillar II. - Protecting the Environment of the EU.
Danube River Basin Regional experiences on integrating GEF in environment and development plans and policies Sub-regional Workshop for GEF Focal Points.
GIS development. Danube Commission+ISRBC meeting Sava GIS Sava GIS establishment –Performed in accordance with the Sava GIS Strategy EU WFD INSPIRE Directive.
1 M. Schneider-Jacoby/Euronatur Pollution Control and the Danube River Dr. Mihaela Popovici Technical Expert Water Management, ICPDR.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Water.europa.eu Assessment of the River Basin Management Plans – preliminary findings Conference on River Basin Management Planning Ankara, 28 February.
Daniel Baláž, Ján Černecký State Nature Conservancy of the Slovak Republic Nature Conservation and River Monitoring in Slovakia.
Institutional Capacity in Transboundary Basins: The Danube The Experience of the ICPDR UN Water Decade Workshop 11 November, 2008, Bonn Philip Weller.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
Streamlining Climate Change Adaptation into RBM: European Perspective Birgit Vogel (MRC) Raimund Mair (ICPDR) 6 th Sharing & Learning Seminar Asia Pacific.
1 International Co-operation in Water Management and Pollution Control in the Danube River Basin FUTAKI, Károly Info Mgmt and Admin Officer ICPDR Secretariat.
Connecting rivers and seas – the Danube/Black Sea experiment Laurence Mee.
German Guidebook on the Implementation of the EC Water Framework Directive Dr. Harald Irmer Germany.
Philip Weller, ICPDR Progress and current status of the Joint Statement The ICPDR point of view Joint Statement Meeting Jan. 2009, Budapest.
Powerpoint Templates Page 1 Powerpoint Templates Black Sea Basin Directorate – presentation of the scope, responsibilities and project interests Mrs. TANYA.
The Danube ICPDR Philip Weller Brussels, Feb 24, 2011 Corporate Partnerships in River Basin Management.
1 Public participation in the Danube Basin: approaches, activities, challenges Jasmine Bachmann ICPDR Secretariat UN Conference on Info Management and.
INTERNATIONAL ENVIRONMENTAL LAW Inland waters protection.
Development of WFD compliant Transnational Monitoring Network in the Danube River Basin Dr. Igor Liška ICPDR Secretariat.
EXPERIENCE IN PREPARING THE FLOOD RISK MANAGEMENT PLAN IN AUSTRIA CLEMENS NEUHOLD FEDERAL MINISTRY OF AGRICULTURE, FORESTRY, ENVIRONMENT AND WATER MANAGEMENT.
3. Pilot projects on transboundary rivers under the UN/ECE Water Convention.
Water.europa.eu Water Framework Directive - a framework for Community action in the field of water policy Marieke van Nood WFD Team, DG ENV.D.2, European.
1 Communication in the Danube River Basin Jasmine Bachmann International Commission for the Protection of the Danube River 1.
The Adriatic Sea Partnership: A pilot program for the Mediterranean “Extraordinary Meeting of MAP Focal Points” Side Event Catania, Italy 7 November 2006.
Platina Manual on Sustainable Waterways ICPDR Philip Weller Brussels, Nov 21, 2010.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project GEF Danube – Black Sea Strategic Partnership 3rd Biennial GEF International.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project and Public Participation in the Transboundary River Basin Management.
JOVANKA IGNJATOVIĆ, REC CEE 1 / 31 May 29, 2014, Skopje, Macedonia INTEGRATED WATER RESOURCES MANAGEMENT IN TRANSBOUNDARY CONTEXT Jovanka Ignjatović, Senior.
Progress and challenges of a transboundary cooperation Dr. Adam Kovacs International Commission for the Protection of the Danube River (ICPDR) Status of.
Péter Bakonyi PAC Assisstant. Content 27/03/2014Budapest, 7th SG Meeting Action 1 Action 2 Action 3 Action 5 Action 6 Action 7 Action8.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
Assessment of Transboundary Groundwaters in South Eastern Europe
Question: How do we generate map products within WasserBLIcK ?
Reducing impacts of the Danube River Basin on the Black Sea
Concept of a Danube River Basin GIS
in transboundary basins:
1 Danube River as a Source for Cooperation: Exploring the Results and Potential Dr Mihaela Popovici, Technical Expert in Water Management, ICPDR Tufts.
The EU Danube Region Strategy (EDRS) is a macro-regional development strategy and action plan for the regions and countries of the Danube river basin.
EU Water Framework Directive
IAEA Interest in the Water Framework
Climate Change and River Basin Planning
Dr. Ursula Schmedtje Secretariat of the ICPDR
CIS-Workshop on River Basin Management Plans 8 – 9 May 2006, Bonn (DE)
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
MODALITY OF COOPERATION
Commission report on Art. 8 WFD Monitoring programmes
LIFE and the implementation of the Water Framework Directive
Information on projects
Hans Dufourmont Eurostat Unit E4 – Structural Funds
LIFE and the implementation of the Water Framework Directive
Workshop on Biodiversity and Water
Comparison of methodologies for defining Good Ecological Potential
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
The 1997 UN Watercourses Convention
Hans Dufourmont Eurostat Unit E4 – Structural Funds
EIONET and EUROWATERNET Common Implementation Strategy
2019 DANUBE WATER CONFERENCE
Sustainable Water Management & Greening of the Economy
Concept paper on the assessment of WFD River Basin Management Plans
WG PoM 15 October 2015, Brussels
Brussels – 20 April 2007 European Commission - DG Environment
The GISCO Progress Report Nov – Feb By Albrecht Wirthmann
European waters - assessment of status and pressures 2018
WISE GIS Group 15 January 2008 John Cima.
Presentation transcript:

Brussels, 15 November DANUBE: where we are? E. Sovjáková chairperson of the GIS/ESG ICPDR

Brussels, 15 November Danube River Basin (DRB) The second largest river basin of Europe 18 states including EU-Member States (AT, CZ, DE, HU, IT, PL, SK, SI) Accession Countries (BG, HR, RO) other states (AL, BA, MK, MD, CS, CH, UA) Convention on Cooperation for the Protection and Sustainable Use of the Danube River (DRPC)

Brussels, 15 November Delineation of the Danube River Basin District (DRBD) DRB the coastal basins of the Black Sea tributaries lying on Romanian territory coastal waters of the Black Sea

Brussels, 15 November Overview map of the DRBD

Brussels, 15 November When the GIS task starts? How to implement the EU Water Framework Directive Organisation measures in 2000 Forming RBM Expert Group (RBM EG) Forming GIS Expert Sub-Group (GIS ESG) The work plan of the GIS ESG is a part of the work plan of the RBM EG

Brussels, 15 November Advantages of the GIS ESG Mighty backing: Permanent Secretariat of International Commission for the Protection of the Danube River Support of the Contracting Parties to the DRPC (the European Community is also a Contracting Party) Support of UNDP DRB Project working with web

Brussels, 15 November Common GIS, unavoidable part of common implementation for the water framework directive They were identified: Essential needs Problems Steps to solution of short-time problems

Brussels, 15 November Short-time problems Making ready common maps to Roof report, part A Preparing a review of data sources in participating countries Preparing a review of national GIS capabilities Working out a recommendation how to continue Financial securing of those activities

Brussels, 15 November Financing Preparation of basic data will be financed by member states UNDP DRB project goal – its financial backing allows: Compiling common maps for Roof Report, part A Preparing consulting papers Start of Project: The Development of a Danube GIS for WFD implementation

Brussels, 15 November Sources of the ICPDR Contracting parties National geoinformation infrastructure Expert groups of the ICPDR (RBM, EMIS, MLIM, APC ECO, FP)

Brussels, 15 November Other significant outsourcing Direct dealing with EuroGeographics Evaluation licence assistance to EGM product, version 1.0 First term of evaluation report: April 2004 Evaluation licence assistance, version 1.1 Second term of evaluation report: November 2004 EGM user license requirements

Brussels, 15 November Placing an order to common maps compilation Compilatory subject: FLUVIUS, Vienna Result: 16 overview maps of the Danube River Basin District 1. Overview 2. Relief and Topography 3. Annual Precipitation 4. Surface Water Bodies 5. Significant Point Sources of Pollution

Brussels, 15 November Placing an order to common maps compilation Compilatory subject: FLUVIUS, Vienna Result: 16 overview maps of the Danube River Basin District 6. Land Use 7. Major Hydraulic Structures 8. Potential Accident Risk Spots 9. Old Contaminated Sites in Potentially Flooded Areas 10. Heavily Modified Surface Waters of Basin-wide Importance 11. Risk of failure to reach the Environmental Objectives – Organic Pollution

Brussels, 15 November Placing an order to common maps compilation Compilatory subject: FLUVIUS, Vienna Result: 16 overview maps of the Danube River Basin District 12. Risk of failure to reach the Environmental Objectives – Hazardous Substances 13. Risk of failure to reach the Environmental Objectives – Nutrient Pollution 14. Risk of failure to reach the Environmental Objectives – Hydro morphological Alterations 15. Important Transboundary Groundwater Bodies 16. Water-related Protected Areas for Species and habitats of Basin-wide Importance

Brussels, 15 November Consultation ordering Compilatory subject: KTH, Department of Land and Water Resources Engineering, Stockholm Results: User Needs Assessment GIS Hardware and Software Considerations Evaluation of EuroGlobalMap Conceptual Design of the Danube GIS/DANUBIS

Brussels, 15 November Different addressees, different needs RBM on the basin wide scale Information about results of the first analysis Information on the progress of WFD implementation

Brussels, 15 November Open questions Are common maps sufficiently detailed? To whom will the created maps serve? Represent the created layers a good foundation to future grow of the common GIS? To what goal it should serve? Do our work impulses to GIS expanding in member states? What we find out? Common coding system of hydro geographic features

Brussels, 15 November More detailed analyse necessary Background documents – in discussion

Brussels, 15 November Results of the GIS/ESG For background discussion: Assessment of the national GIS capabilities Issues of Reference Geographical Data to the GIS supporting WFD and their rational solution

Brussels, 15 November Changes of the national GI No hitch but substantial changes of geoinformation infrastructure Example: the Czech Republic

Brussels, 15 November Agreement about DRB GIS project principles Strategic Plan for the development of the Danube River Basin GIS May 2004, GIS ESG June 2004, RBM EG

Brussels, 15 November Agreement about DRB GIS project principles ToR Term of reference and steps for implementation (July 2004) Decision to place an order of the project to UBA Austria Base Document (February 2004) Start of work ( August 2004 )

Brussels, 15 November Two parts of the project Expected results: Inception Report Day to day mode of collaboration Periodical progress meeting Work plan: Inception Report - September 2004 Final Report - February 2005

Brussels, 15 November Further questions in view Continuing WFD reporting Dec and Dec requirements Resolution of the DRB GIS Common system of codes of the hydrological features (rivers, sub-basins, water bodies) Transboundary data needs Forcing development of the national water information systems

Brussels, 15 November Further questions in view New ISO standards for quality assurance Accessibility of data Harmonisation of tools for basic measurements (sizing of area, length rivers CORINE Land Use – how to deal with remote sensing imagery Statistical methods

Brussels, 15 November If you need further information go to the Internet address