ENTERPRISE OF STATE ATOMIC ENERGY CORPORATION “ROSATOM” FMB Lepse Dismantling Project Status Lepse IPMU 26 April 2013 Moscow.

Slides:



Advertisements
Similar presentations
PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension W.I.
Advertisements

1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
Stuart East, 22 nd May 2012 Delivering industrial solutions for the fusion research community Stuart East.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
IAEA RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety Regional Workshop on Drafting Regulations.
EGYPT NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION “General Information on the Status of the Egyptian Nuclear.
History of Nuclear Safety Legislation in Pakistan
Licensing of Nuclear Power Plants in Pakistan
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
IAEA Perspective and Lessons Learned in Shipping HEU Spent Fuel to Russia Institute of Nuclear Materials Management 48 th Annual Meeting July , 2007.
International Teamwork – RTG Recoveries and Disposals Joint US-Canadian Presentation Christopher C. Landers U.S. Department of Energy & Nicole C. Evans.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
Governmental, Legal and Regulatory Framework in Azerbaijan Republic Aysel Hasanova, Akbar Guliyev, Emin Mansurov Regional Workshop - School for Drafting.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
IAEA Safety Publications Related to Regulatory Infrastructure Safety Fundamentals SF 1 Safety Requirements GSR Part 1, GSR Part 3 School of Drafting.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
Tom MAZOUR IAEA, Division of Nuclear Power
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Republic of Moldova.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
ISO training courses Developed by DOE and IBRAE RAN and conducted at the Training Center “Emergency Response” of the Institute for Advanced Training.
Status Report for Critical Infrastructure Protection Advisory Group
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Source Control Project, Phase I Chemical hazards Objectives  Development of the of risk assessment methodology based on the use of approaches of ISO
1 Prospects of the Floating Nuclear Power Plant overseas projects State Atomic Energy Corporation “Rosatom” JSC “Concern Rosenergoatom” «Directorate for.
State Nuclear Regulatory Committee of Ukraine Development of Regulations Development of Regulations School for Drafting Regulations on Nuclear and Radiation.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Update on EPPR Radiation Projects October 2012 Ann Heinrich, U.S. Department of Energy.
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
US-Russia cooperation in emergency response enhancement Emergency Exercise Series US-Russia cooperation in emergency response enhancement Emergency Exercise.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Nuclear Safety & Nuclear Security Synergy By Dr. Lucian BIRO Director General ROMANIA National Commission for Nuclear Activities Control International.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
IAEA International Atomic Energy Agency Milestones in the development of a national infrastructure for nuclear power The Nuclear Security dimension Technical.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
JORDAN ATOMIC ENERGY COMMISSION (JAEC) Building of National Safeguards Capabilities in Jordan IAEA’s Technical Meeting/Workshop on National Infrastructure.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
Department for Nuclear and Radiation Safety of the Ministry for Emergency Situations (Gosatomnadzor) Leading specialist Diana Rusakevich Belarus Department.
Cryogenic safety organisation at CERN
EMERGENCY RESPONSE CENTER OF THE ROSATOM:
Governmental, Legal and Regulatory Framework in Azerbaijan Republic
Radiation & Nuclear Safety and Security Aspects in Lao PDR
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
Quality control of equipment manufacturing for nuclear facilities
Legal and Regulatory Framework for Nuclear Installations in IRAN
The Transport standards
Presentation transcript:

ENTERPRISE OF STATE ATOMIC ENERGY CORPORATION “ROSATOM” FMB Lepse Dismantling Project Status Lepse IPMU 26 April 2013 Moscow

KEY ACHIEVEMENTS - 1 Lepse has been towed to Nerpa – September 2012

KEY ACHIEVEMENTS - 1 All necessary approvals were obtained prior to the towing operation Three tugs were used with the addition of “Rossita” as a support vessel An Emergency Rescue Group were in attendance A harbour exclusion zone was set-up The operation was carried out successfully

 Lepse is now safely moored at Nerpa alongside a temporary berth at the Pier  All physical protection and radiological safety measures are in place, the Sanitary Pass and Guardhouse facilities are installed.  Lepse is under constant monitoring KEY ACHIEVEMENTS – 2

KEY ACHIEVEMENTS - 3 The Integrated Technical Design has been prepared by Aspect Conversion and is currently being reviewed by FCNRS, Regulators and International Experts. The contract for the adaptation of Nerpa infrastructure to facilitate the raising of Lepse to the slipway pad is close to signature. The Tender for the process equipment is under preparation.

PROJECT STRUCTURE Work to Completion LEPSE PROJECT NDEP AREA 1 – Project Management AREA 3 – Preparation for Defuelling AREA 4 – Improvement of Nerpa Infrastructure AREA 2 – Development of Technical Documentation AREA 5 – Lepse Dismantling SNF & RAW Handling SNF Transport to Mayak LSP Transport to Saida Bay Extract from Procurement Plan rev ’C’ 6

PROGRAMME KEY DATES ActivityPlanned Date Infrastructure for docking & dismantling is ready November 2013 Lepse is raised to the slipway pad at Nerpa December 2013 Dismantling and preparation of LSPs is complete End 2014 Shipyard Infrastructure required for de-fuelling is ready End 2014 The Shelter is constructed and fore LSP installed Early 2015 All facilities commissioned and ready for de-fuelling Mid 2016

Thank you! Federal State Unitary Enterprise “Federal Center for Nuclear and Radiation Safety” ENTERPRISE OF STATE ATOMIC ENERGY CORPORATION “ROSATOM”