E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.

Slides:



Advertisements
Similar presentations
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Advertisements

Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Space Charge meeting – CERN – 09/10/2014
H. Damerau, S. Hancock, LHC Beam Studies Review 28/08/2012 PS: the Longitudinal Plane 1 H. Damerau, S. Hancock LIU Beam Studies Review Meeting 28 August.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Introduction Status of SC simulations at CERN
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
E. Benedetto, 29/04/14, OP Shutdown Lecture, Res. Compensation in the PSB Resonance compensation in the PS Booster (1 st part) E. Benedetto + M. McAteer.
Injector MD planning and requests for 2014 Giovanni Rumolo and Hannes Bartosik Thanks to all MD users, machine supervisors, operators, experts … MSWG meeting,
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
Theoretical studies of IBS in the SPS F. Antoniou, H. Bartosik, T. Bohl, Y.Papaphilippou MSWG – LIU meeting, 1/10/2013.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
E.M, PS-OP shut-down lectures, 20/02/ u Requirements of the LHC on its injectors u What are the nominal & already achieved beams at PS exit? u How.
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
LIU-PS Beam Dynamics Working Group Introduction and objectives
LHC Wire Scanner Calibration
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Impact of the current debuncher limitations (…can we get rid of longitudinal painting?)
Automatic emittance measurement in the CERN 1.4 GeV Booster
Alternative/complementary Possibilities
Plans for ions in the injector complex D
Space charge studies at the SPS
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
Proposals for 2015 impedance-related MD requests for PSB and SPS
Emittance growth AT PS injection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
LHC Emittance Measurements and Preservation
New AD Production Beam in the PSB
Multiturn extraction for PS2
Summary of Space-Charge Measurements, 2011
PSB magnetic cycle 160 MeV to 2 GeV
News on TMCI in the SPS: Injecting high intensity bunches
Optics Measurements in the PSB
ThomX – Commissioning Meeting – 25/01/2018
PSB rf Foreseen limitations with 2 E13 p at 2 GeV
PSB magnetic cycle 900 ms MeV to 2 GeV
Another Immortal Fill….
Emittance Studies at Extraction of the PS Booster: Emittance Calculation S. Albright, F. Antoniou, F. Asvesta, H. Bartosik, G.P. Di Giovanni, M. Fraser,
Presentation transcript:

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI teams which have already submitted MDs requests

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Outline List of MDs requests, with tentative dates: -Emittance measurements -RF studies -Beam production -Injection/Extraction -LIU Transverse Beam Dynamics studies: Optics, Space Charge, Instabilities, Losses, … Flags Not yet synchronized with the rest of the Injector complex, schedule, etc…  Giovanni will present the full picture and planning at some future MSWG. OPLIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Wire scanners Wire-scanner calibration (on LHCINDIV to SPS, ~December) Emittance Working Group: monitor LHC beam brightness along the chain. Campaign interesting the entire injector complex. Check new calibration with different wire speeds Cross-check measurement using different filters/HV with simulations Implement the import of longitudinal profile measurements from tomoscope data (de-convolution to subtract dispersion). Contacts: BI, Guido Sterbini, Jean-Francois. OP LIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 RF studies Longitudinal dynamics and beam production (in //, weeks 26 to 31, priority depends on user requirements): Longitudinal shaving C16 blow up studies (new production schemes for LHC) H1+2 synchro studies (new production schemes for LHC) Re-bucketing studies Single batch transfer Other cycle type commissioning Contact: Alan + Maria Elena Finemet cavities (in //, weeks 38 to 41 + ½d access in the machine before  ATTENTION! no TS scheduled so beginning Sept.) Testing the Finemet system in the PSB Contact: Mauro + Alan + Maria Elena OP LIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Production of new beams to PS New LHC beam parameters (In //): After LS1, LHC beams will be transferred to the PS with larger longitudinal emittances (1.5 eVs for the BCMS and 2.8 eVs for the standard, instead of the present 0.9 eVs and 1.2 eVs, respectively) and bunch lengths compatible with the recombination kicker rise time (150 ns for the BCMS and 220 ns for the standard). The production of these beams at the PSB (and the possibility of making them operational) will have to be tested by performing a controlled blow up along the cycle with C16 and producing the larger emittances within wanted bunch lengths by using h1 and h2 at 8 kV and in phase just prior to extraction. Contact: Giovanni + Alan + Bettina OPLIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Production of new beams to PS “Cycles rapprochés” (in //) Double-batch injection of LHC beams with reduced time between batches. Contact: Klaus “Hollow bunches” (in //, requires PS) Production of hollow bunches to reduce space-charge at injection in the PS. Contact: Adrian + Giovanni + RF + PS LIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Injection/Extraction YASP (In //; soon after restart): Recommission YASP after the optics changes of the transfer lines, the new configuration and some still outstanding modifications to YASP. Contact: Bettina + Jean-Francois Orthogonal matching knobs for PSB-PS injection (In //): Contact: Klaus OP

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Injection/Extraction Injection kicker MD (Dedicated; autumn?): Repeat MD to modify the kick distribution in the 4 injection kickers and measure the resulting emittance. Check the bump closure. Contact persons: Bettina + Tony Fowler BI optics (In //; end of summer?): With the corrected injection line model, optimise the BI optics for max. brightness and min. losses. Contact: Bettina + Elena OP LIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Injection/Extraction BTM optics changes (In //; towards summer): Compare old to new optics including emittance & mismatch measurements. Some errors have been corrected in the optics and Wolfgang+Jose are working on a new matching to remove 2 bottlenecks. Contact: Wolfgang + Bettina Extract beam at 160 MeV (Dedicated; Tbd): In preparation of the commissioning of the Linac4 connection. New timings added during LS1 to allow earlier pulsing of the extraction kickers. This important functionality has to be verified and it should be checked if with the optics proposed by Wolfgang the beam can be transported with only small losses to the PSB dump. Contact: Jose-Luis + Wolfgang + Bettina LIU OP

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Ring Optics Nonlinear optics from Turn-by-turn trajectories (in // & dedicated; application not available < autumn, preparatory tests before): First measurement of the ring optics to compare to the simulations; Preparation for the connection of the PSB with Linac4. Measure trajectories with all 16 BPMs per ring (x 4 rings) If possible, use tune kicker at higher voltage (if spare can be made or found) Repeat tests with AC dipole (if tune can be made more stable) Measurements with chromaticity corrected (*) in both planes Measure trajectories with tune altered by 0.5 or 1 (to move phase advance between bpms away from 90 degrees, reducing systematic error of optics calculations) (dedicated MD!) Contact: Meghan + Bettina + Jose-Louis (*) Q’ correction MD, discussed in a dedicated slide OP LIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Studies for linear optics from orbit response (in //, after start-up): Measurements should be repeated after realignment of LS1 Data acquisition process will be automated (possibly using Matlab), allowing for faster collection and more precise measurements Measurements will be made at multiple working points (dedicated!) Contact: Meghan Tune scans (in //, after start-up): Measurements should be repeated after realignment of LS1 Measurements with corrected chromaticity (*) Contact: Vincenzo + OP Resonance compensation (in //): Investigate resonance compensation (see work of P. Urschuetz) Contact: Gian Piero + ABP OP Ring Optics (*) Q’ correction MD, discussed in a dedicated slide LIU OP LIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Space-charge Space Charge 160 MeV (In // and dedicated): Preparation for the connection of the PSB with Linac4. Measurements should be (partly) repeated after realignment of LS1 Measurements with high intensity, high emittance beam Measurements with corrected chromaticity (*) Measurements at different tunes (dedicated MD!) Contact: Vincenzo + Magda Space Charge at “lower” energy (In //, Tbd, requires reprogr Bfield) To obtain high space-charge tune-shift, different measurements Contact: Elena + OP + Vincenzo Effect of octupoles on SpaceCharge (In //, low priority) To excite/cure Montague or 0.25 line Contact: Vincenzo + Elena (*) Q’ correction MD, discussed in a dedicated slide LIU OP LIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Other high intensity effects Instabilities and Impedances (in //, Tbd, TFB not available < summer): Continue investigations on known instabilities, making use of the upgraded TFB. Tune shifts measurements, for impedance model benchmark Contact: Carlo + Kevin Loss studies (In //, summer): Study loss pattern after transverse and longitudinal shaving. Make use of the new BLMs. To be done at present energy but also at ~160 MeV and/or with very small emittances Contact: Magda + Bettina + Elena OP LIU

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Beam Dynamics/OP: others… Change injection working point (in //, in preparation for MDs) Setting up special working-point right at injection (instead of moving the tune after injection), for Space-Charge MDs Includes optimization BI optics&steering Contact: Elena + Bettina Injection with reduced/increased current (Dedicated, Tbd if feasible) Studies for protons from Linac4. Check emittance vs. Linac2 intensity, for different steering and kicker delay Contact: Elena + Bettina + Linac people + kicker experts LIU OP

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 (*)MDs with chromaticity correction Since different teams requested MDs with corrected chromaticity, here a summary of the requests: Turn-by-Turn measurements (Meghan) Tune scans with corrected chromaticity (Vincenzo) see evolution losses and profiles (tails) close to the integer or to some 3 rd order resonance line (to isolate the contribution of SpaceCharge) (Vincenzo + Elena + Bettina) Measure tune shift vs intensity (Carlo)

E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 Summary List of MDs, “as received” from Users (and/or Supervisors) Studies concern present Operation and LIU studies, most of them belong to both categories Please if you have additional requests, even if preliminary, don’t forget to inform us. MDs coordinator (for the injector complex): Giovanni Rumolo Deputy MDs coordinator: Hannes Bartosik LIU-PSB beam dynamics contact: Elena Benedetto MDs coordinator (for the injector complex): Giovanni Rumolo Deputy MDs coordinator: Hannes Bartosik LIU-PSB beam dynamics contact: Elena Benedetto