Prof. Awad Hanna Project Control  Major objectives for a good control plan. 1.Should accurately represent the work. 2.Permit deviations to be detected,

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Chapter 7 Project Management
Work Breakdown Structures
Scheduling CTC-470.
Targets for the individual and the organisation By Rachel, Claire, Kirsten and Natalie.
Software Process Models
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Creating the Project Plan
Systems Analysis and Design 9th Edition
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Scheduling Computations for Precedence Networks. Prof. Awad Hanna Tabular Format (Precedence Diagram)  Can be carried out on the tabular form without.
Prof. Awad Hanna Precedence Diagram Advantages of using Precedence Diagram: 1. No dummy activity are required. 2. A single number can be assigned to identify.
Software project management (intro)
Hazard Analysis and Critical Control Points
Prof. Awad Hanna Estimating Activity Duration Time Interval  Time Interval is selected according to the nature of the activity (seconds - minutes…) 
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 10 Project Monitoring and Control
Project Evaluation and Control
BAR CHART Develop by Henry Gantt. Definitions Activity
Page 1 ICT in Time Management Grade 11 ICT Mrs. Ghazaal.
4 th European Project Management Conference, London, 6-7 June 2001 Resource Critical Path Approach to Project Schedule Management Vladimir Liberzon, PMP.
Quick Recap Monitoring and Controlling. 2 Control Project Cost.
1 The Initial Report Preparation Guidelines. 2 The Initial Report u Definition of project scope u Project aims and objectives u Initial project plan.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project monitoring and Control
Project Life Cycle.
T.L. Martin & Associates Copyright © 2008 Chapter 1 Fundamentals of Scheduling T.L. Martin & Associates, Inc Office Park Drive Gaithersburg, Maryland.
Scheduling CTC-415. Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two.
+ PROGRESS MONITORING: IEP Goals and Benchmarks By Marlene Chavez.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
4/21/2003CVEN Maxwell 1 Project Control: Control of Work and Cost Versus Time Part November 19, 2015.
PROJECT PLANNING AND SCHEDULLING
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
© Prof. Awad Hanna1 Productivity Measurement. © Prof. Awad Hanna2 Productivity Definitions and Measurements Productivity = or  Example : 0.27 Work-hours.
DEVELOPING A STATUS REPORT: A HYPOTHETICAL EXAMPLE Tong Wang P , Chapter 13 Process and performance Measurement and Evaluation, Project Management.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
Project Management PTM721S
Time Planning and Control Time-Scaled Network
Design and modeling 10 step design process
Ten-Stage Design Process
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Ten-Stage Design Process
TOPIC-8A- PROJECT TIME CONTROL
Project Planning and Scheduling
Activity Planning.
Resource Leveling Advantages/Applications of Resource Leveling
PROJECT SCHEDULING PERT - Cost.
PLANNING RESOURCES 1. Materials Need to determine 2. Equipment
Monitoring and Reporting Project Progress
What Will You Learn 1. How To Plan Projects
Time Planning and Control Time-Scaled Network
CEM 510 Construction Planning & Scheduling Dr Almohawis
Chapter 6 Activity Planning.
ENGINEERING MANAGEMENT (GE 404)
FACULTY OF ENGINEERING CONSTRUCTION AND BUILDING DEPARTMENT
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

Prof. Awad Hanna Project Control  Major objectives for a good control plan. 1.Should accurately represent the work. 2.Permit deviations to be detected, evaluated and forecasted. 3.Should make provision for periodic corrective actions.

Prof. Awad Hanna Level of Control  Small projects - low cost - short duration  Detailed network  Reporting mechanism  Middle-sized projects (300 activities)  Detailed network  Summary network  Area and craft network

Prof. Awad Hanna Target Activities Properties  The scheduler has to choose between early start schedule or target schedule. Two Major Considerations: 1. The way in which the resources are applied to the activity. 2. The manner in which the activity is to be measured.  In all the previous work we assumed that each activity has a constant rate of utilization.

Prof. Awad Hanna We will keep this assumption knowing that the most probable one is  If an activity has expended a third on its cost, the activity is said to be one third finished.  The most important consideration is measuring the completion of activities is that the measure should be consistent throughout the project.

Prof. Awad Hanna Target Activity Durations

Prof. Awad Hanna Monitoring the Project 1.Feedback from direct contact  Efficient but requires close cooperation between the manager and field personnel.

Prof. Awad Hanna Monitoring the Project (cont.) 2.Feedback from photography  Record progress and provide permanent documentation of the work.  Tell nothing about the time taken to perform the work.

Prof. Awad Hanna Monitoring the Project (cont.) 3.Feedback from check-off list  Planner prepare a check-off list that is started, to be continued, or to be finished in the next time interval.  Effective if the reporting periods are short “Daily, Weekly” and small number of activities involved.  Disadvantage: false reporting

Prof. Awad Hanna Monitoring the Project (cont.) 4.Feedback from bar chart 5.Feedback from networks Advantage: Superintendent has complete information about the status of the project. Disadvantage: Diagram may appear confusing to field personnel.

Prof. Awad Hanna Setting the Target Schedule Early Start Schedule: As Target for Control  Problem: Required high effort to keep the plan working Late Start Schedule As Target for Control  Problem: Because every activity is timed to start as its latest, project overruns are sure to follow.

Prof. Awad Hanna Target Schedule  Activities may be positioned early or late start or somewhat in between.  Non-critical activities allow intermediate start.

Prof. Awad Hanna Anticipated target S-Curve

Prof. Awad Hanna The S-Curve field

Prof. Awad Hanna Sample Project Cost Data

Prof. Awad Hanna Early Start Tree

Prof. Awad Hanna Late Start Tree

Prof. Awad Hanna Target Network

Prof. Awad Hanna Project S-Curve

Prof. Awad Hanna Actual Versus Target S-Curves