Introducing the INS Master Schedule Wayne Baggett.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

MIGRATION MIGR-09. How to Run Your Next Implementation... Don't Let It Run You! Patricia Johnson Senior Systems Consultant Strategic Systems Group, Inc.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Management Session 7
Chapter 3: The Project Management Process Groups
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Project Management and MS Project. The project management triangle: Time Resources Scope.
Quality Consulting Overview of Reports Module. Quality Consulting Dashboard Reports Dashboard Reports module provides project highlights for users of.
Project Management Basics
Planning. SDLC Planning Analysis Design Implementation.
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
S/W Project Management
IT Project Management Cheng Li, Ph.D. August 2003.
Michael Dermody September 2010  Capability Maturity Model Integration ◦ Is a Trademark owned by the Software Engineering Institute (SEI) of Carnegie.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Travel Website Enhancement Project Project Update First Name Last Name.
1 EIR Accessibility Web Scanning Program Jeff Kline, Statewide Accessibility Coordinator Texas Department of Information Resources October, 2012.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Software Project Planning Chapter 2 Applied Software Project Management, Stellman & Greene.
Requirements Traceability: Planning, Tracking and Managing Requirements Presenter: Paula R. Maychruk, BV/TEd., CAPM, CBAP.
Copyright 2009  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand.
Project Status Report Presenter Name Presentation Date.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
Managing CMMI® as a Project
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Chapter 15 Introduction to Systems Development. Learning Objectives Learn how information systems are developed Understand importance of managing SD process.
Develop Project Charter
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
MONITORING AND TRACKING PROGRESS. Remember Your Primary Objective Mitigate fire suppression-caused damage to as close to pre-fire conditions as is reasonably.
T Iteration Demo METAXA PP Iteration 17 November November November 2015.
Information System Project Management Lecture three Chapter one
Microsoft Project User Group May 2002 – Chapter Meeting Scheduling - Best Practices Initiation and Planning Presented by James Nuthall Brentford Technologies,
Science Team Objectives K. Jezek and J. Richter-Menge Science Team Co-leads.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
U.S. Department of Agriculture eGovernment Program February 10, 2004 USDA Presidential Initiatives Working Group Meeting.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
What is project management?
ITFN 4014 and ITFN 2012 Orientation Fall Homepage Tel: CSU (678)
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
The OSG Stakeholders’ Request System Oct 9, 2012 Gabriele Garzoglio for the Project Office.
Where Module 04 : Knowing Where the Project Is 1.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Supplier Management Can’t live with them, Can’t live without them!
T Project Review X-tremeIT PP Iteration
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Workplace Projects.
CINEMA System Engineering
TechStambha PMP Certification Training
Adaptive Product Development Process Framework
Presentation transcript:

Introducing the INS Master Schedule Wayne Baggett

What Is It? The INS Master Schedule –Captures “project-level” work led by INS –Includes work by other divisions –Captures HST observing-cycle activities Does not capture every task being done within INS –Routine SI calibrations –Help Desk support

What Will It Be Used For? The INS Master Schedule will be used for –Tracking progress of the work –Identifying schedule conflicts –Identifying resource issues –Assessing resource allocations –Assessing impact of new work requests

How Was It Produced? INS SI Teams and other groups identified work items Work Item Data Sheets written for each item –Describes work –Identifies INS Lead –Provides priority –Identifies deliverables

How Was It Produced? HST INS Work Item Data Sheet 1. SI/Title: ACS/ASCS Study 2. INS Lead: M. Sirianni 3. Description of Work: Study temperature-dependencies of CTE, QE, dark current, bad pixel behavior to see if the ASCS is needed for the best operation of the ACS. Write one or more ISRs as the formal report of the study. Calibration data to support this study will be obtained in November Schedule Constraints and Dependencies: An ASCS decision is needed from the HST Project by early Spring Risks and Open Issues: Risk – If the calibration observations do not correctly complete in November 2005, then the study will be delayed. Mitigation: repeat any failed observations in the Spring. 6. Priority: High 7. Priority Justification: This study could have an impact on the SM4 manifest. 8. Resources (including estimated calendar duration for each portion): a. Requirements ACS Instrument Scientist (0.21 FTE) b. Development ACS Commanding Developer c. Testing ACS Commanding Developer Instrument Engineer 9. Documentation and Deliverables: Calibration ISR

How Was It Produced? Discussed work items with INS Division Office Assigned work items to general time periods Drafted the detailed near-term schedule Work(ing) with other divisions to finalize this schedule –“If you’re part of the plan, you’re part of the planning.”

Current Status Draft Schedule exists and is starting to be used for tracking work progress –ACS – COS– NICMOS –STIS– Cal Planning– User Support INS Master Schedule will be a “living” document –Updated regularly to reflect progress –Updated as needed to capture changes to existing work –Updated as needed to capture new work

Current Status Some Work Items still need to be defined Schedule is still in draft form –Some items are missing –Discussion with other divisions needs to be completed

Sample of Schedule

Where to Find It Web Site – –Contains Link to INS Master Schedule (PDF) Instrument and other group pages with Work Item Data Sheets –Maintained by W. Baggett