Rockridge BART Safe Routes to Transit Project Community Meeting Wednesday, September 30, 2015 Rockridge Library.

Slides:



Advertisements
Similar presentations
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Advertisements

County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
City of Oakland: Road Diet Experience
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
How did the Bicyclist Cross the Road? By: Mike Hendrix, PE, PTOEDate: June 26, 2012 A Case Study of Two Intersections in Seattle.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Nonmotorized Regional System Plan 1 3 rd Technical Task Force meeting Regional Nonmotorized Transportation System Plan Thursday April 3 rd 2014 Steer Davies.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Maryland Avenue and Westminster Street Jerry Auge, PE Project Manager Ramsey County Paul St. Martin Traffic Engineer City of St. Paul September 10, 2013.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Bicycle, Pedestrian, Livability Pedestrian Plan— GIS Analysis APTAC July 2015 Kate Brady.
1Prepared by AC Transit Service Development Transit Signal Priority For the San Pablo Rapid Bus.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
APWA Management & Public Administration Committee Creating Complete Streets to Accommodate All Users May 23, 2012.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
“Connecting People and Places” REGIONAL MOBILITY PLAN CRTPA Board Meeting May 17, 2010.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Provo-Orem Bus Rapid Transit Project Update July 2013.
Community Outreach Meeting September 10, 2015 Welcome to Santa Clara County I-680 Corridor Study 1.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
COMPLETE STREETS Local Model Policy June 10, 2015.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Safety Is Everyone’s Responsibility May Today’s Agenda Central Corridor Light Rail Overview Safety Outreach Program –Do’s and Don’ts –Safety video.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
METRO PADYAKAN Walk and Bike Ways Go to Home Page.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
La Plaza Vieja Neighborhood Plan Transportation Commission Meeting Wednesday, September 30, 2015 Sara Dechter, AICP City of Flagstaff Comprehensive Planning.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Pedestrian Master Plan Update Seattle Planning Commission Michelle Marx, Ian Macek, Kevin O’Neill May 26, 2016.
30 Stockton Transit Priority Project Chestnut November 10, 2015 Marina Community Association.
City Manager Report – May, 2016 Presented to: Minot City Council City Manager Report – May, 2016 Presented to: Minot City Council Lee Staab, City Manager.
Mobility for all Modes Update to the Transportation Chapter of the City’s Comprehensive Plan City Council May 27,
Rock Creek East II Livability Study April 28, 2016.
Center City Connector 101.
Stanford Avenue/El Camino Real Intersection Improvements Project
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
El Cerrito Active Transportation Plan
COACT ODOT Update September 13, 2018.
Committee Update August 27, 2018.
M14A/D Select Bus Service
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Presentation transcript:

Rockridge BART Safe Routes to Transit Project Community Meeting Wednesday, September 30, 2015 Rockridge Library

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Process to date 2008 Oakland settlement with Caltrans 2010 Long public process resulted in new list Public meeting 250 comments Final project list Development of highest priority projects Update and course correction, as needed Final design & bids for top projects Revised project list

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Caldecott project tracking

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Project background 2007Bicycle Master Plan 2008Caldecott process 2014 SR2T grant 2015 Meetings with:  AC Transit  College Avenue merchants  Community

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Project area Shafter/Keith Ave Miles Ave

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Existing roadway Frequent pedestrian and bicycle activities Overcrowded sidewalk corners 2 vehicle lanes (except 1 block) 46’ curb-to-curb wide (mostly)

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Project goals Improve pedestrian access at the intersections closest to Rockridge BART Station Provide better bicycle access along corridor Fill gap in Oakland’s bicycle network

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Project components Bicycle lanes College/Shafter/Keith improvements College/Miles improvements

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Bicycle lanes College Ave: Broadway to Alcatraz Avenue No loss of parking No loss of travel lanes (except 1 block) Also on Shafter and Keith

Bicycle lanes | College Avenue

Bicycle lanes | Shafter Avenue

College/Shafter/Keith intersection

College/Miles improvements

September 30, 2015Rockridge BART Safe Routes to Transit Community Meeting Project timeline June 2015:Met with AC Transit Sept 2015:Met with Rockridge merchants Presented to BPAC Community meeting Oct 2015:Comment deadline Spring 2016:Complete design Fall 2016:Start construction

Rockridge BART Safe Routes to Transit Community Meeting Additional Comments by 5:00 pm Friday 10/16/15 Victoria Eisen | Eisen|Letunic (City consultant)