Advancing Traffic Signal Management Programs through Regional Collaboration T3 Webinar -- July 23, 2009 Jim Poston Regional Transportation Commission Reno,

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Advertisements

Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
2009 MUTCD Revisions Part 4 – Traffic Signals Revisions to the 2009 MUTCD.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD CA MUTCD 2012 Revisions to Part 4 – Highway Traffic Signals.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
Advance Preemption Costs More than Simultaneous Preemption: Fact or Fiction?
Freeway Signing Plan Design April 29, 2008
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
February 19, 2015 Design Guidelines to Accommodate Pedestrians and Bicyclists at Interchanges Draft ITE Recommended Practice: Meghan Mitman, AICP Senior.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
CE 4640: Transportation Design Prof. Tapan Datta, Ph.D., P.E. Fall 2002.
Introduction to Transport
PASSER II SOFTWARE.
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Signal Timing Design Example Problems. Intersection of Michigan Avenue and Hewitt Road.
Signalized Intersections
2015 Traffic Signals 101 Topic 7 Field Operations.
Transportation Engineering
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
Transportation Research Group University of Nevada, Reno 2012 ITE District 6 Annual Meeting SIGNAL TIMING WITHOUT TRAFFIC COUNTS Zong Z. Tian, Ph.D., P.E.
Transportation Engineering
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
CEE 320 Fall 2008 Course Logistics HW7 due today (9 total) Midterm next Friday (Wednesday review) Signalized Intersections (Chapter 7 of text) Last material.
Center for Advanced Transportation Education and Research University of Nevada, Reno Presenter: Cui Zhou University of Nevada, Reno Center for Advanced.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
1 Urban Intersections Slides prepared by Dale S. Harrington, P.E.
NEGOTIATING INTERSECTIONS
CEE 764 – Fall 2010 Topic 3 Basic Signal Timing and Coordination Principles.
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
Linking Planning and Operations in Las Vegas Talking Operations Seminar March 23, 2005.
Problem 4: Okeechobee Road Stopped Control Analysis.
 SIGN, SIGNALS, & ROADWAY MARKINGS Do Now - Create a list with as many different road signs you are able to think of. What does each sign tell you? Classify.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Intersections.
Expressway Driving Legacy High School Drivers Education.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
Traffic Signals & ITS to Encourage Walking & Cycling
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
Maintenance and Temporary Traffic Control
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
Intersections.
The I-465 West Leg Reconstruction Project
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Drive Right Chapter 2 Unit 1
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
* Topic 7 Field Operations
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
Problem 2: Moe Rd/Route 146 Intersection
Highway capacity and Level of Service Analysis
Eliminating Left & Right Secondary X-roads where only 2 lanes possible without delaying traffic , nor cycles , nor pedestrians LCC July’15.
Signal Timing: Putting it All Together
Using CMFs in Planning for Virginia’s Project Funding Prioritization
ARTERIAL INTERCHANGE Four exit ramp, split level (SPUI)
CE 3500 Transportation Engineering Saturation flow and signal LOS
CE 3500 Transportation Engineering Elements of Traffic Signals
Metropolitan District | mndot.gov
Transportation Engineering Calculating Signal Delay February 23, 2011
Interlocal Cooperative Agreement FY 20
Signal Design CTC-340.
Presentation transcript:

Advancing Traffic Signal Management Programs through Regional Collaboration T3 Webinar -- July 23, 2009 Jim Poston Regional Transportation Commission Reno, Nevada

Region Overview

2009 population – 428, year growth rate – 2% - 3% Road network –132 miles of freeway –376 miles of regional arterials Traffic signals – 376 –Reno – 247 –Sparks – 110 –Washoe County – 19

Regional Transportation Commission of Washoe County MPO Engineering –Fuel tax & fed funds: $34 million –Impact fees: $65 million –RTC-5: $80 million Transit –RTC RIDE – 9 million rides/year, 30 routes –RTC INTERCITY, RTC ACCESS –Sierra Spirit, TART

RTC Signal Coordination Efforts RTC owns/operates no traffic signals RTC provides additional resources –Manpower –Expertise First regional project – 1999 Representative project – –165 intersections Project cost $615,050 –95% Federal funding –5% match from NDOT

RTC Signal Coordination Efforts Project components –Improved signal timing –Timing guidelines –Staff tools to expedite future signal timing –Staff training

Results on the street Average speed increased by 13% Delay reduced by 8% –113,000 vehicle-hours saved per year Less fuel used – 550,000 gals saved Cleaner air –NOx: 5,600 lbs –PM 10 : 720 lbs –CO: 67,000 lbs 16.7:1 benefit-cost Video illustration

Additional Products Regional timing guidelines Targeted signal operations training Regional Synchro™ computer network Public outreach materials Recommendations for improvement beyond signal timing –Maintain regional level of service

Timing Guidelines ParameterValueApplication Phasing Timing Ped Walk4 – 7 sec Use 6 seconds at typical locations. If additional time is needed, increase accordingly. In unusual situations where the overall signal cycle length is critical, the duration can be reduced to a minimum of four (4) seconds. Flashing Don’t Walk (Ped Protect) Variable The minimum pedestrian clearance interval shall be sufficient to allow a pedestrian crossing in the crosswalk who left the curb or shoulder during the WALK interval to travel at a walking speed of four (4) feet per second, to at least the far side of the traveled way or to a median of sufficient width for pedestrians to wait. If needed, other walking speeds may be used as appropriate. The duration of the FLASHING DON’T WALK interval is calculated by subtracting the yellow change interval and the red clearance interval from the minimum pedestrian clearance interval. The pedestrian clearance interval, together with the associated yellow change interval and red clearance interval, is intended to allow a pedestrian to cross the roadway before a conflicting green indication is displayed. This does not say we can use the walk period as part of the time it takes a pedestrian to cross the street. Initial Green 8 secThru movements on arterial 4 secSide street and all left turn movements Max Initial This is only used if the approaches don’t have stop bars. [JP1] This seems too short for minor thru movements with 4 secs TBR. I’d recommend TTR be set to Max-TBR.[JP1] [JP2] Cond svc is the default?[JP2]

Training

Regional Synchro™ Network

Recommendations for Improvement beyond Signal Timing Inside McCarran (Acceptable LOS=D) Main Street Cross Street Existing LOS (AM/mid/PM) Low-cost improvementMajor improvement MoanaUS-395 rampsC-D-ERestripe to (2)NBLT lanes(Corridor) Add (1) WB lane on Moana PlumbHarvardC-E-F (No improvement identified) Add 2 nd NBLT lane; Add 2 nd WBLT lane PyramidOddieF-E-F Remove E/W split phasing; restripe WB to L/TR (Corridor) Add 3 rd NB, 3 rd SB lane on Pyramid RockGlendaleD-D-FExtend WBRT striping Extend WBRT storage, add WB thru lane; (Corridor) add 3 rd NB lane, add 3 rd SB lane RockHymerC-B-E (No improvement identified) Remove E/W split phasing; restripe EB to LT/R; (Corridor) add 3 rd NB lane, add 3 rd SB lane RockI-80 rampsF-C-ERestripe EB ramp to L/LTR/R Add EBRT acceleration lane; (Corridor) add 3 rd NB lane, add 3 rd SB lane

Public Feedback

Public Feedback - Followup

Public Outreach Materials

Is It Better? Las Vegas Mayor Oscar Goodman "I'm not having the pleasant experience that's been represented to us. … If I'm wrong, I'm going to apologize. But I'm not wrong... You show me that it's working. It's not, from my perspective."

Before-after video comparison Video Illustration

Image advertising

Next Project Improved public information Next project –New intersections, some repeats –Closer cooperation with UNR –MOU to “freeze” signal timing –Traffic counts provided to consultant Cooperative traffic management –Computer access –Shared information on construction projects –Single contact for signal calls Supplemental, not replacement

Questions? Jim Poston (775)