Status of MEIC Beam Synchronization V.S. Morozov on behalf of MEIC study group (summary of the results of a series of special MEIC R&D meetings) MEIC Collaboration.

Slides:



Advertisements
Similar presentations
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Advertisements

Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Ion Polarization Control in MEIC Rings Using Small Magnetic Fields Integrals. PSTP 13 V.S. Morozov et al., Ion Polarization Control in MEIC Rings Using.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
Synchronization Andrew Hutton Slava Derbenev Yuhong Zhang.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
EIC Users Meeting, SBU, 6/27/14 Polarized Electron Beams in the MEIC at JLab Fanglei Lin for MEIC Study Group EIC Users Meeting, Stony Brook University,
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
Hybrid Fast-Ramping Synchrotron to 750 GeV/c J. Scott Berg Brookhaven National Laboratory MAP Collaboration Meeting March 5, 2012.
Third ILC Damping Rings R&D Mini-Workshop KEK, Tsukuba, Japan December 2007 Choosing the Baseline Lattice for the Engineering Design Phase Andy Wolski.
P. Chevtsov for the ELIC Design Team
Electron Cooling Simulation For JLEIC
Large Booster and Collider Ring
Non-linear Beam Dynamics Studies for JLEIC Electron Collider Ring
Beam-beam Effects in Hadron Colliders
Gear Changing Issues for MEIC: Outline
First Look at Nonlinear Dynamics in the Electron Collider Ring
Electron Polarization In MEIC
Electron collider ring Chromaticity Compensation and dynamic aperture
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Collider Ring Optics & Related Issues
Beam-Beam Interaction in Linac-Ring Colliders
Negative Momentum Compaction lattice options for PS2
Negative Momentum Compaction lattice options for PS2
MEIC Shifting Magnet Tim Michalski August 6, 2015.
Path Length Chicane Options
Fanglei Lin, Andrew Hutton, Vasiliy S. Morozov, Yuhong Zhang
Update on MEIC Nonlinear Dynamics Work
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Beam Beam effects for JLEIC
Yu.N. Filatov, A.M. Kondratenko, M.A. Kondratenko
HE-JLEIC: Boosting Luminosity at High Energy
Ion Collider Ring Using Superferric Magnets
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Status and plans for crab crossing studies at JLEIC
JLEIC Main Parameters with Strong Electron Cooling
Alejandro Castilla CASA/CAS-ODU
Update on JLEIC Electron Ring Design
Conventional Synchronization Schemes
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
Progress Update on the Electron Polarization Study in the JLEIC
MEIC New Baseline: Performance and Accelerator R&D
Possibility of MEIC Arc Cell Using PEP-II Dipole
More on MEIC Beam Synchronization
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Cavity tuning options for synchronization
HE-JLEIC: Do We Have a Baseline?
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
MEIC Alternative Design Part III
New Chicane Option Total bending angle and start and end points fixed
MEIC beam path change with e-ring bypass lines
Summary and Plan for Electron Polarization Study in the JLEIC
Ion Path Length Compensation with Chicane
JLEIC Ion Beam Formation options for 200 GeV
Illustrations of Beam Synchronization Issue
Presentation transcript:

Status of MEIC Beam Synchronization V.S. Morozov on behalf of MEIC study group (summary of the results of a series of special MEIC R&D meetings) MEIC Collaboration Meeting, JLab October 5-7, 2015

MEIC Collaboration Meeting, JLab, October 5-7, Introduction Overview of synchronization requirements and schemes Harmonic jump Beam path-length adjustment Scanning synchronization RF cavity tuning range Engineering aspects of moving magnets Conclusions Outline

MEIC Collaboration Meeting, JLab, October 5-7, Issue: energy-dependence of ion velocity desynchronizes ions with electrons Schemes involving magnet movement –Moving magnets in the ion collider ring Moving whole arcs or a small number of magnets in chicane(s) With or without harmonic jump –Moving magnets in the electron collider ring & adjusting RF in both rings Moving (almost) whole arcs or a small number of magnets in chicane(s) With or without harmonic jump –Some combination of the above two schemes Schemes with small or no magnet movement –Bypass beam lines –Scanning synchronization Problem & Synchronization Schemes

MEIC Collaboration Meeting, JLab, October 5-7, Time between collisions: Synchronized Beams Ions Electrons

MEIC Collaboration Meeting, JLab, October 5-7, Suppose ion energy set significantly lower: Desynchronization Ions Electrons

MEIC Collaboration Meeting, JLab, October 5-7, Ion path length change such that Synchronization Option I Ions Electrons

MEIC Collaboration Meeting, JLab, October 5-7, Electron path length change along with ion and electron frequency adjustment such that Synchronization Option II Ions Electrons

MEIC Collaboration Meeting, JLab, October 5-7, Harmonic jump such that Harmonic Jump at “Magic” Energies Ions Electrons

MEIC Collaboration Meeting, JLab, October 5-7, Harmonic jump –Pros: simplifies synchronization, highly beneficial to detection and polarimetry –Cons: potential for a dynamic instability, luminosity loss Moving ion magnets –Pros: does not require changes in RF and CEBAF injection –Con: moving superconducting magnets not trivial Moving electron magnets –Pro: warm magnets simpler to move –Cons: requires adjustment of RF and possibly CEBAF injection Moving (almost) whole arcs (arguments reversed for chicane) –Pros: relatively small change in magnet spacings –Con: have to deal with a large number of magnets Bypass beam lines –Pro: less magnet movement –Cons: additional magnets and beam line complexity Scanning synchronization –Pro: no magnet movement –Cons: technical challenges and potential detection issues Pros & Cons

MEIC Collaboration Meeting, JLab, October 5-7, GeV/c protons: L = m, f = MHz, h = 3422 (bunch spacing = cm) Observations –A path-length chicane probably not practical without harmonic jump for the whole momentum range –When moving whole arcs without harmonic jump Maximum transverse shift  R =  L /  = 24.9 cm where  =  With ~256 gaps between arc dipoles and quadrupoles, max gap change = 8.9 mm –When moving whole arcs with harmonic jump  R = (bunch spacing) /  = 69 mm Max gap change = 2.5 mm Synchronization Parameters p (GeV/c)  Without harmonic jumpWith harmonic jump h  l (m)  f (MHz) h  l (m)  f (MHz)

MEIC Collaboration Meeting, JLab, October 5-7, Synchronization – highly desirable –Smaller magnet movement:  (bunch spacing)/2 –Smaller RF adjustment Detection and polarimetry – highly desirable –Cancellation of systematic effects associated with bunch charge and polarization variation – great reduction of systematic errors, sometimes more important than statistics –Simplified electron polarimetry – only need average polarization, much easier than bunch-by-bunch measurement Dynamics – question –Possibility of an instability – needs to be studied Luminosity reduction by about twice the beam gap size (instead of one) Implications of Harmonic Jump

MEIC Collaboration Meeting, JLab, October 5-7, Framing Dynamic Problem One solution for synchronization is different number of bunches in MEIC collider rings Two different numbers of bunches in collider rings: N 1, N 2 –Beam-beam collisions precess –All bunch combinations cross if N 1, N 2 are incommensurate –Can create linear and nonlinear instabilities (K. Hirata & E. Keil (1990), Y. Hao et al. (2014)) Analysis similar to coupled bunch instabilities driven by impedance –But flat frequency dependence T. Satogata

MEIC Collaboration Meeting, JLab, October 5-7, Linear Simulation Results Raising number of bunches in linear simulation quickly produced instabilities – as low as N=(10,11)! –A verification but of course many details left out T. Satogata

MEIC Collaboration Meeting, JLab, October 5-7, Things Missing… Linear model doesn’t look good BUT –MEIC is strong focusing (transverse and longitudinal, e and p) –Landau damping may damp instabilities faster than even the pessimistic growth rates Typical damping times are o(1/  Q ) (chromatic dominates nonlinear) Hadron rebunching should be performed without e - beam Nonlinear beam-beam tune spread may help Many dynamical effects were not included in H/L/P paper –Nonlinear beam transport –6D effects (e.g. chromatic tune spread, tune modulation) –Higher order moment instabilities –Assumed only round beams T. Satogata

MEIC Collaboration Meeting, JLab, October 5-7, More realistic simulation needed by challenging –In case of MEIC, 1 turn = ~3000 beam-beam interactions + non-linear dynamics –Non of the existing codes seem adequate Developing a new code GHOST in collaboration with ODU –Accuracy: high-order transfer map, symplecticity, bunch slicing –Speed: Bassetti-Erskine solution for each pair of slices, single-term map, GPU Simulating Non-Pair-Wise Collisions B. Terzic et al. GHOST & BeamBeam3D, 10 cm bunch 40k particles

MEIC Collaboration Meeting, JLab, October 5-7, Ion Arc Chicane Using current 22.8 m FODO cell design (8 m 3 T dipoles with 3.4 m separation) One chicane per arc (also helps with synchronization of the 2 nd IP), one extra FODO cell per arc Takes up cells, which could otherwise be used for chromaticity compensation # of FODO cells # of magnet movedPath length change Radial movement range Maximum change in magnet spacing 34 dipoles, 5 quads  10 cm +52 / -69 cm20 mm 46 dipoles, 7 quads  10 cm +36 / -39 cm14 mm 58 dipoles, 9 quads  10 cm +28 / -29 cm11 mm  x = 52 cm  x = -69 cm Total bending angle and z length are fixed

MEIC Collaboration Meeting, JLab, October 5-7, Electron Arc Chicane Using current 15.2 m FODO cell design (5.4 m dipoles with 2.2 m separation) One chicane per arc (also helps with synchronization of the 2 nd IP), one extra FODO cell per arc Takes up cells, which could otherwise be used for chromaticity compensation  x = 44 cm  x = -50 cm Total bending angle and z length are fixed

MEIC Collaboration Meeting, JLab, October 5-7, Total bending angle and start and end points fixed Keep field in edge magnets maximum and adjust it in middle magnets with energy Extreme case with a factor of 5 energy swing shown (intermediate cases possible) Probably most efficient way to adjust the path length Provides almost complete path length adjustment over the whole range without HJ Sagitta in edge dipoles is an issue: grows ~linearly with bending angle Chicane Option II  L = 1.97 m  x = 8.26 m  d = 11 cm A. Hutton

MEIC Collaboration Meeting, JLab, October 5-7, Bypass Electron Beam Lines Two (or more) beam lines at one location: “path length jump”. Electron beam passes through one of them. Several “jumps” distributed around the ring. “Jumps” can be combined with each other and small adjustable chicanes to produce the necessary path length adjustment Switch merger Building blocksPath length (cm) Chicanes0 to 4.5 Chicanes + Jump 14.5 to 9 Chicanes + Jump 29 to 13.5 Chicanes + Jump 318 to 22.5 Chicanes + Jump 2&322.5 to 27 Chicanes + ump 1&2&327 to 31.5 UnitsPath length adjustment Sum of Chicanes cm(+/-1)x2 ==> Jump 1cm Jump 2cm8910 Jump 3cm Jump 4cm8 Totalcm Y. Zhang

MEIC Collaboration Meeting, JLab, October 5-7, Path Length Jump Illustration Present CEBAF path length chicane:  1 cm e-e- R=155m RF Spin rotator CCB Arc,  81.7  IP Tune trombone & Straight FODOs Future 2 nd IP Spin rotator Electron collider ring w/ major machine components 20 fixed +4 cm fixed +8 cm “Path length jump” variable +/-1 cm chicane Y. Zhang

MEIC Collaboration Meeting, JLab, October 5-7, Bypass Electron Line Option II Can be used for synchronization without harmonic jump Line # B4 bending angle (deg) Change in path length (m) B1-3 bending angle (deg) x max (m) Long straight length (m) * * * *17.35 Bending magnet 4, 3, 2, 1, 1, 2, 3, 4 J. Guo

MEIC Collaboration Meeting, JLab, October 5-7, Scanning Synchronization Position of the orbit crossing point adjusted for every incident bunch pair making the IP move periodically in time No magnet movement Requires kicker technology development and detector design compatible with moving IP Ya.S. Derbenev et al.

MEIC Collaboration Meeting, JLab, October 5-7, Impact on Ring Design Space for and locations of chicanes and/or bypass lines Linear and non-linear optics Synchrotron radiation and its effect on electron emittance and spin Magnet strengths Cost of additional elements

MEIC Collaboration Meeting, JLab, October 5-7, PEP-II Cavity Tuning Range PEP-II cavities have one fixed and one movable tuner Each tuner has ~  500 kHz range Adequate for retuning to MHz plus beam loading May be OK to tune over whole energy range without HJ Moving plunger tuner Fixed tuner Moving tuner R. Rimmer and J. Guo

MEIC Collaboration Meeting, JLab, October 5-7, SRF Cavity Tuning Range Typical JLab SRF cavity tuner  200 kHz at 1497 MHz, limited by switches. Could be  400 kHz? (T. Powers) –Where is the warm/cold elastic limit? –Analysis needed. Scales to ~  250 kHz at MHz. –  140 kHz required for harmonic change of 1,  280kHz for even harmonics –Probably OK for tuning over even harmonics –Not sufficient for full energy range without HJ Need to change the design to allow larger tuning range –Decrease stiffness of cavity (in a controlled way) –Longer stroke tuners –Use plungers or external reactive tuners? Have some ideas… R. Rimmer and J. Guo

MEIC Collaboration Meeting, JLab, October 5-7, Moving radially inward and outward is feasible –Use slides and measurement scheme to make repeatable Rotation of magnets will be required as well Considerations for interfaces between magnets and to outside world –Beamline Vacuum – bellows between adjacent beam pipe vacuum chambers –Insulating Vacuum – bellows between adjacent Arc Half-Cells (?) –Power – “service loop” for conductors –Cryogens – may require flex hoses between adjacent Arc Half-Cells and assessment of U-Tubes Repositioning Superferric Magnets T.J. Michalski

MEIC Collaboration Meeting, JLab, October 5-7, Moving radially inward and outward is feasible –Use slides and measurement scheme to make repeatable Rotation of magnets will be required as well – if doing a short string Considerations for interfaces between magnets and to outside world – no major issues –Vacuum – assess capacity to expand/contract RF shielded bellows between rafts –Potential to use different bellows for different energies Repositioning PEP-II Magnets T.J. Michalski Location of Bellows With a single bellows in a Arc Half-Cell, Raft and Dipole must be moved as a pair. Corrector Length of Bellows is.125m or 4.92” PEP-II HER Bellows

MEIC Collaboration Meeting, JLab, October 5-7, It is preferable to –Have magnets that are being repositioned at the bottom of the stack in the arcs –Move electron magnets –Move a shorter section by a larger amount, i.e. use a chicane Approximate effort: shifts for a 3-person crew Preliminary Engineering Conclusions T.J. Michalski

MEIC Collaboration Meeting, JLab, October 5-7, There are a number of synchronization solutions for both equal and different numbers of bunches in the electron and ion rings. Synchronization adjustments are expected to happen on a half a year to a year time scale and can be made in a few days during a shutdown. Running with different bunch numbers simplifies synchronization and provides a significant physics benefit Based on the physics and engineering considerations, our preliminary baseline choice is –Harmonic jump (to be demonstrated in simulations) –Adjusting electron path length using a movable chicane RF tuning range meets the synchronization requirements Conclusions