ATLAS Inner Detector MO_B 2013 to-date status 2014 approve budget H. Pernegger / Pixel PL & ID Resource Coordinator D. Robinson / SCT PL and ID PL A. Romaniouk.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
TRT Detector Status Report Konstantin Zhukov (Lebedev Physics Institute) for the ATLAS TRT group ID week, 19 May
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Pixel Upgrade Plans ROD/BOC PRR July 17, 2013 T. Flick University of Wuppertal.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
ATLAS Pixel Upgrade Phase 0 (IBL) ACES Workshop , CERN T. Flick University Wuppertal for the IBL collaboration.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Design and Performance of a PCI Interface with four 2 Gbit/s Serial Optical Links Stefan Haas, Markus Joos CERN Wieslaw Iwanski Henryk Niewodnicznski Institute.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
CERN, Main challenges for the ATLAS upgrade project in the coming year.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS Inner Detector MO_B 2012 closure 2013 mid-year status 2014 request H. Pernegger / Pixel PL & ID Resource Coordinator D. Robinson / SCT PL and ID.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
July 17, 2013 CERN T. Flick University of Wuppertal.
Overview and Status of the ATLAS Pixel Detector Claudia Gemme, CERN/INFN-Genova on behalf of the ATLAS Pixel Community 10th ICATPP Conference, Como, Oct.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Problems and solutions during the integration. Unconformities in the detector Claudia Gemme, CERN - INFN Genova.
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
60kW Thermosiphon control system
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
Detector Control for the Insertable B-Layer Susanne Kersten Wuppertal University ATLAS Upgrade Workshop, February
LKr status R. Fantechi.
CERN R&D plans and Infrastructures
4th FRC meeting, Antti Onnela, CERN-PH-DT
Status of ATLAS Resources
Radiation Laboratory Meeting
Presentation transcript:

ATLAS Inner Detector MO_B 2013 to-date status 2014 approve budget H. Pernegger / Pixel PL & ID Resource Coordinator D. Robinson / SCT PL and ID PL A. Romaniouk / TRT PL 31/10/20131

2013 Budget 2231/10/2013 H. Pernegger / CERNID IB Oct 2013

Mid-year spending So-far spent about xx% of the budget Pixel L2 and SCT TX still to come Expenses to-date include much of 2013 manpower commitments 3331/10/2013 H. Pernegger / CERNID IB Oct 2013 Balance 2013 IDPixelSCTTRTTotal Budget (kCHF) Budget carry- over from Budget Spent (31Oct 2013) Open Remaining

Main Cost Drivers and LS1 activities LS1 scheduled work: Pixel : Integration of IBL and Pixel detector new Service Quarter Panel replacement and nSQP off-detector items (cables, power) ID: Installation of the new thermo-siphon C3F8 cooling system TRT: Address leak issue and consolidate gas system Consolidation of SCT readout: Order of new TX plug-ins and production of new BOC card. This consolidation of SCT readout is carried out with the current budget during the shutdown. The overall budget of the SCT is maintained at 637 kCHF 4431/10/2013 H. Pernegger / CERNID IB Oct 2013

Pixel nSQP and Connection All nSQPs are installed Sequence is –each nSQP is tested before and after installation –Connection of pipes and type 0 cables at PP0 –Testing of the full supply and readout chain  row by row verification of the functionality of the Pixel Package before it will be brought to the Pit From pit operation we had 92 /1744 modules that had issues Failures cleared by nSQP or type-0 cable repairs 531/10/2013 H. Pernegger / CERNID IB Oct 2013

Pixel nSQP mounting 631/10/2013 H. Pernegger / CERNID IB Oct 2013

Pixel today 731/10/2013 H. Pernegger / CERNID IB Oct 2013

Pixel status on surface after refurbishment as of 2013/10/ of 1744 modules are working, i.e. 99% B-layer impressive recovery 8 31/10/2013 H. Pernegger / CERNID IB Oct 2013

IBL Status IBL Module production is completed –Produced mainly from beginning of this year to September since the move to Panasonic flip chip –Total number 412 DC and 263 SC modules built in 12 batches IBL staves: 12 staves built so far –9 staves are in SR1 –3 staves in Geneva –Have material to built up to 18 staves (incl. reworked modules) –Produced staves essentially from ~May to now at rate of 50 DC fully accepted and 30 SC fully accepted modules/month –Test results in general good –However recently identified a problem with wire bonds (see later slide) 931/10/2013 H. Pernegger / CERNID IB Oct 2013

IBL Module test results Performance very good Noise ~120e- for planar and e- for 3D Dead channels 0.23% (3D-CNM), 0.47% (3D- FBK) and 0.32% (Planar CiS) 10 Noise distribution Breakdown voltage distribution Bad pixels/chip (batch 4-12) 1031/10/2013 H. Pernegger / CERNID IB Oct 2013

Module loading to staves Bare staves prepared with stave flex and tested Staves assembled with 12 DC and 8 SC modules per stave 117/10/2013 H. PerneggerAtlas week 1129/10/213 H. PerneggerPixel week

Observations Observe clear signs of corrosions on Wire bonds wing area and FE- bonds caused by water+catalyst (halogene) –White remanants, which are likely Al(OH)3 –Detected corroded Al bond wires directly on stave – confirmed through high-resolution images Detailed analysis of remnants and wires was carried out to understand cause of corrosion together with detailed dedicated tests on many samples IBL Stave task force investigates causes and remedies 12 31/10/2013 H. Pernegger / CERNID IB Oct 2013

Corrosion Based on the current understanding we deal with –Corrosion on bond wires (~1%-level distributed over ¼ to ½ of all chips) –Corrosion caused by condensation on stave with accelerating component somewhere on module (find significant amounts Cl, F, of yet unknown origin) Recovery plan –Build 8 more staves using existing, repaired or class-2 type components on the last staves –Clean and repair the existing affected staves (priority on less affected ones) –Consider to buy more components as backup (to be ordered now so that we can get them in-time) 1331/10/2013 H. Pernegger / CERNID IB Oct 2013

SCT DAQ Expansion 100kHz at  ~87 Maximum sustainable L1 rate as a function of pileup, 14TeV, 25ns FE  ROD 8176 data links ROD  ROS Existing 90 Slinks ROD  ROS With 128 Slinks and data compression ✗ 100kHz at  ~33 100kHz at  ~87 SCT adapt the existing DAQ system to cope with the high pileup conditions in Run2 90  128 RODs and BOCs Improved data compression on ROD Both FE and ROD bandwidth compatible with pileup close to 90 at 100kHz 1431/10/2013 H. Pernegger / CERNID IB Oct 2013

SCT New Optical Transmitters (TX) Currently installed VCSELs were operationally robust during 2012, but two significant issues developed which impact on future operation: 1.10% drop in optical power 2. Small but significant death rate Optical power (IPIN data) vs Date Number of deaths vs channel number SCT will move to commercially packaged optical array assemblies, back engineered to match the mechanical and connectivity constraints of the existing BOC hardware and fibres Installation scheduled for Spring/Summer /10/2013 H. Pernegger / CERNID IB Oct 2013

Consolidation of Pixel readout Pixel readout: During next run LHC will reach “beyond-design luminosity” which will lead to data rates for which the Pixel readout was not built. The beyond-design peak luminosity leads to saturation on backend electronics This caused pixel detector inefficiency already in Layer 2 and will later cause inefficiency on Layer 1 The saturation and resulting inefficiency is a function of Luminosity, L1A rate, hit rate per double column, error rate and number of FE- chip with hits 16 31/10/2013 H. Pernegger / CERNID IB Oct 2013

Pixel Readout The bandwidth between module and ROD depends on the layer: 160 Mb/s (2x80Mb/s) on two optical fibers for the B-layer 80 Mb/s on one fiber for layer 1 and disks 40 Mb/s on one fiber for layer FE.. 16 x 40 Mb/s FE/MCC links Col pairs EOC buffer and logic..9.. MCC ROD 40, 80 or 160 Mb/s MCC/ROD links MCC buffers ROD buffers 1731/10/2013 H. Pernegger / CERNID IB Oct 2013

Link occupancy at future luminosities Pixel readout link Link Occupancy for different luminosities : 7x10 33 at 50ns 1x10 34, 2x10 34 and 3x10 34 at 25ns MCC  ROD link occupancy at 75 and 100 KHz LVL1 rate: At and above 2x10 34 first Layer 2 will saturate, then followed by Layer 1 –Run 1 limitations at start of fill and due to ROD computing power limits when  >> design Priority for consolidation: Fix now Layer 2, followed later by Layer /10/2013 H. Pernegger / CERNID IB Oct 2013

Layer 2 limitations already in 2012 Observed already limitations during Run 1 at start of fill –Observe high number of desynchronized modules in Layer at start of fill. Decrease follows luminosity decrease 1931/10/2013 H. Pernegger / CERNID IB Oct 2013

Consolidation of Pixel readout Consolidation of Pixel Layer 2 readout system by using IBL ROD/BOC for Layer 2/1. –Bandwidth increase : –L2: from 40 Mb/s to 80 Mb/s on a single fibre –L1: from 80 Mb/s to 160 (2x 80) Mb/s on two fibres Usage of IBL boards for Pixel readout consolidation –Boards provide bandwidth and computing power safety margin also at high pileup –Adoption to Pixel can be done in firmware B-Layer and disks shall remain with present ROD/BOC –opto packages will need replacements Cost estimate based on IBL production number is 315 kCHF for Layer 2 consolidation 120kCHF included in 2013 MO_B budget Requested additional 70kCHF for 2014 and 100kCHF for 2015 which was approved in Oct RRB 20 31/10/2013 H. Pernegger / CERNID IB Oct 2013

This pipe should be repaired. Access outside is blocked. The only way to repair is from inside of the pipe. Pictures from inside of the PEEK pipes taken with Endoscope. A special tool was developed and All active pipes at the exit of the TRT ECs were replaced (including not leaking ones). However some leaks were in inaccessible areas. and only way to keep leaks under control is a modification of the TRT Active Gas System. TRT Gas system 2131/10/2013 H. Pernegger / CERNID IB Oct 2013

Modification of TRT Active Gas system Modification or replacement of different parts of the gas system to allow parallel operation with Argon Distribution racks in UX area which includes a remote control of the gas flows through individual gas supply lines (80 channels). Fully controlled Ar-mixer rack and analysis system to supply some parts of the TRT with Ar-mixture Distribution module for Ar mixture (UX area) direct supply (without circulation) of some parts of the TRT with Xe-mixture with detailed monitoring of the gas consumption Pressure control system in the gas return lines (USA area) Improvements for better stability 2231/10/2013 H. Pernegger / CERNID IB Oct 2013

Projection to end 2013 XX% of the budget spent to date; –Spending in 2014: Pixel consolidation of readout for Layer 2 component order –SCT order placed for Lightable VCSEL arrays for TX plug-ins and BOC cards and will be able to compensate negative carry-over of -94kCHF Integration of IBL and new Pixel services integration, the change of the ID C3F8 cooling system and the TRT leak fixes are the core activities of the LS1 shutdown. Those activities dominate the manpower expenses 2331/10/2013 H. Pernegger / CERNID IB Oct 2013

Budget for 2014 Budget numbers in kChF 24 EXPERIMENT: ATLAS request 2014 Subsystem: ID PixelSCTTRTIDGENTotal Mechanics00000 Gas-system Cryo-system00000 Cooling system00000 FE electronics (spares)00000 Standard electronics, PS (LV, HV) Standard electronics, Crates Standard electronics, RO Modules Controls, (DCS, DSS) Sub-Detector Spares00000 Areas SR-maintenance facility (buildup) SR-maintenance facility (operation) Testbeam and irradiation Systemtests Communications Store Items Hired CERN (CHF)00000 Standard tasks Special interventions TOTALS [kCHF] (excl. FTEs) Technical Manpower [FTE], OTP /10/2013 H. Pernegger / CERNID IB Oct 2013

2015 and beyond For 2015 and beyond preserve a flat MO budget –Add IBL core electronics maintenance into 5% model of pixel. The readout of Layer 2/1 with IBL ROD/BOC will still contribute to 2015 expenses 2531/10/2013 H. Pernegger / CERNID IB Oct 2013

Summary Present spending to date is Approved 100 kCHF IDGEN manpower increase for 2014 as the shutdown is now the full two years Request of additional kCHF in 2014 and 2015 for electronics for Pixel readout consolidation was approved –This is consolidate the Layer 2 readout ready for Run /10/2013 H. Pernegger / CERNID IB Oct 2013 Balance 2013 IDPixelSCTTRTTotal Budget (kCHF) Budget carry- over from Budget Spent (31Oct 2013) Open Remaining