13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May 23 -25, 2011 GSE Timothy Quinn.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Lab7: Introduction to Arduino
Using an FPGA to Control the Protection of National Security and Sailor Lives at Sea Brenda G. Martinez, Undergraduate Student K.L. Butler-Purry, Ph.D.,
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
1 Electrical and Computer Engineering Cam Proctor Ramsey Khudairi Tom Gilbert Chad Young Project Orion TekBand.
STARLight PDR 3 Oct ‘01I.1 Miller STARLight Control Module Design Ryan Miller STARLight Electrical Engineer (734)
1 Performed By: Khaskin Luba Einhorn Raziel Einhorn Raziel Instructor: Rivkin Ina Spring 2004 Spring 2004 Virtex II-Pro Dynamical Test Application Part.
Characterization Presentation Spring 2006 Implementation of generic interface To electronic components via USB2 Connection Supervisor Daniel Alkalay System.
STARLight PDR 3 Oct ‘01J.1 Miller STARLight Electrical Ground Support Equipment Ryan Miller STARLight Electrical Engineer (734)
PV Watchdog Web-Enabled Photovoltaic System Monitor Art Barnes Austin Fisher Ryan Mann Josh Stone.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
1 FINAL PRESENTATION PART A Implementation of generic interface To electronic components via USB2 Connection Supervisor Daniel Alkalay System architectures.
Wireless Data Acquisition for SAE Car Project by: J.P. Haberkorn & Jon Trainor Advised by: Mr. Steven Gutschlag.
1 Mid-term Presentation Implementation of generic interface To electronic components via USB2 Connection Supervisor Daniel Alkalay System architectures.
5/8/2006 Nicole SAN Protocols 1 Storage Networking Protocols Nicole Opferman CS 526.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
Yongho Kim Aug 2, : My Job TLM_ReceiverRS decoderGSEOS Nothing.. Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame,
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
SCADA and Telemetry Presented By:.
Computerized Train Control System by: Shawn Lord Christian Thompson.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
18-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Package Dave Curtis, PFP Package Manager Mars.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
SPP Spacecraft Emulator (SCE) Introduction
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Application Block Diagram III. SOFTWARE PLATFORM Figure above shows a network protocol stack for a computer that connects to an Ethernet network and.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
Running Piccolo Log on Flightgear Young Mo Kang UIUC.
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
Control & Data Handling, Operator Control, Aircraft Interface to C&DH Steve Musko Space Physics Research Laboratory University of Michigan Ann Arbor, MI.
ICALEPCS 2005 Geneva, Oct. 12 The ALMA Telescope Control SystemA. Farris The ALMA Telescope Control System Allen Farris Ralph Marson Jeff Kern National.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
1 Chapter Overview Modems The Internet and Web Browsers.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
CTG Command, Telemetry, and GSE (CTG) Software Design Will Rachelson
11/3/2000cmd_soh1 SOH and CMD Current Status. 11/3/2000cmd_soh2 ISUAL Flight Software 0.0 SOH Telemetry CMD Input Debug I/O.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
January 2010 – GEO-ISC KickOff meeting Christian Gräf, AEI 10 m Prototype Team State-of-the-art digital control: Introducing LIGO CDS.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
Operational Flight Software
Status of the DSP/ASPOC EM
Simulink Interface Layer (SIL)
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Ground Support Software
ESA GSE.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
♪ Embedded System Design: Synthesizing Music Using Programmable Logic
Presentation transcript:

13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn

13-2 MAVEN PFP ICDR, May 23 – 25, 2011 Agenda Component Overview Data Viewing Development Status Anomaly Reporting and Tracking Test Setups

13-3 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview The main components of the MAVEN GSE are: –MAVEN Instrument Simulator GSE (MISG) PFDPU/Instrument simulator –Ground Support Equipment Operating System (GSEOS) Telemetry and Command Control –Spacecraft Simulator GSE (SSG) –Additional Test Equipment (Power Supplies, Manipulator, Ion Gun, etc.)

13-4 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - MISG MAVEN Instrument Simulator GSE (MISG) –ZestET1 off-the-shelf module High-speed Ethernet (TCP/IP Offload) engine (TOE) Configurable (Xilinx) FPGA – Instrument/PFDPU interfaces, along with the data flow and control are implemented in the FPGA, which interacts with the TOE to transfer data to/from the Host Computer –Base (Interface) Board connects to the Zest-ET1 FPGA Provides buffers and connectors that match the MAVEN-PFDPU flight configuration Houses the Actuator Control circuitry, controlled and monitored by the Zest-ET1 FPGA –Whenever possible, the MISG uses the actual flight design, assuring that the simulated interfaces match the flight hardware (The interface between the PFDPU and Instruments is a clocked serial bit-stream) –Communicates with GSEOS via TCP/IP

13-5 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - MISG MAVEN Instrument Simulator GSE (MISG) –PFDPU test interface for instrument bench level testing Sends commands to and receives telemetry from the Instrument under test Provides an independent but synchronous “high-speed” (8.34 or MHz) clock for those instruments that require it and a power- supply synch signal –Instrument test interface for PFDPU testing MISG receives commands from and sends telemetry to the PFDPU under test Simulated instruments include SEP, SWEA, SWIA, STATIC, MAG (1 and 2), and LPW instruments MISG telemetry production is impartial with respect to the instruments; each of the nine units simulated is personalized via its loaded pattern and operates synchronously to its own dedicated clock supplied by the PFDPU. (In practice, these clocks are 1.048MHz, derived from the PFDPU Master clock.)

13-6 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - MISG Block Diagram

13-7 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - MISG Front/Back Views

13-8 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - MISG Physical Layout Diagram

13-9 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - MISG

13-10 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - GSEOS Off-the-Shelf software for Telemetry and Command (T&C) control Operation is managed through the use of configuration files and the Python scripting language Ingest the Command and Telemetry Definition Document (CTM), an excel spreadsheet, and convert it into all of the necessary GSEOS command and telemetry definition files, telemetry limit files, conversion formula definition files, and other GSEOS configuration files Supplies a scripting interface for closed loop instrument control

13-11 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview – GSEOS Block Diagram

13-12 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview – GSEOS Development Process: Review FPGA Specification

13-13 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview – GSEOS Development Process: Generate Instrument CTM

13-14 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview – GSEOS Development Process: Generate GSEOS Config Files from CTM

13-15 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - GSEOS Development Process: Generate Common GSEOS Displays

13-16 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - GSEOS Development Process: Generate GSEOS Instrument Specific Desktop and Displays

13-17 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - GSEOS Development Process: Generate GSEOS Instrument Specific Desktop and Displays

13-18 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - GSEOS Development Process: Generate Instrument Scripts

13-19 MAVEN PFP ICDR, May 23 – 25, 2011 Component Overview - SSG Spacecraft Simulator GSE (SSG) –Hardware interface controlled by LabWindows (C) program –LabWindows program communicates with GSEOS over TCP/IP

13-20 MAVEN PFP ICDR, May 23 – 25, 2011 Data Viewing GSEOS Real-Time Digital and Analog Housekeeping Displays –Single value raw/converted –Plots: Stripchart, bar graph, bitmap

13-21 MAVEN PFP ICDR, May 23 – 25, 2011 Data Viewing Near Real-Time Displays –Matplotlib – Python plotting library called from GSEOS

13-22 MAVEN PFP ICDR, May 23 – 25, 2011 Data Viewing Near Real-Time Displays –IDL GSEOS continuously saves data to files during test Data files accessed on shared disk by scientists/engineers

13-23 MAVEN PFP ICDR, May 23 – 25, 2011 Development Status - MISG 9 of 12 systems delivered (some development areas sharing), remaining systems under development/troubleshooting Current FPGA version: 4.0 FPGA upgrades pending for LPW/MAG

13-24 MAVEN PFP ICDR, May 23 – 25, 2011 Development Status - GSEOS Shared component set developed and tested Basic MISG T&C communications Basic SSG T&C communications Basic instrument specific component set developed and tested FPGA specifications used to create CTM CTM converted to GSEOS configuration files Basic displays/scripts built Active instrument testing since 12/2010 (LPW) Instrument script development underway Continued display development Telemetry limits and conversions GPIB test equipment control Power supplies complete Manipulator, ion gun, high voltage under development

13-25 MAVEN PFP ICDR, May 23 – 25, 2011 Development Status - SSG Current software version 3.0 Implements: Time Update Commands PFDPU Command and Telemetry Processing Zone Alerts Timing Test Minimum command delay of 30ms still to be implemented

13-26 MAVEN PFP ICDR, May 23 – 25, 2011 Anomaly Reporting and Tracking Currently reports ed to developer Future: JIRA – Commercial Issue and Project Tracking Software Browser based bug reporting system Currently being installed on MAVEN server Current Anomalies GSEOS-MISG TCP connection dropout 3/2011 GSEOS-SSG telemetry sync error 5/2011

13-27 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups The MAVEN GSE will support 3 types of test setups for the PFP before it’s shipped off to the spacecraft manufacturer for mission level I&T –Instrument Bench –PFDPU (DCB/FSW) Bench –PFP I&T

13-28 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups SWEA Bench

13-29 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups SWIA Bench

13-30 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups SEPBench

13-31 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups SEP Actuator Bench

13-32 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups STATICBench

13-33 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups DCBBench

13-34 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups FSWBench

13-35 MAVEN PFP ICDR, May 23 – 25, 2011 Test Setups PFP I&T (STATIC Engineering Model)