CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Report about the ATF operations training Hector Garcia.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

4.1/9.1m L* Optics & Performance Glen White, SLAC SiD Meeting, SLAC Jan 13, 2015.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
Working group report T500 and E203 Armin Reichold 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 1.
Networking Theory (Part 1). Introduction Overview of the basic concepts of networking Also discusses essential topics of networking theory.
Luminosity Stability and Stabilisation Hardware D. Schulte for the CLIC team Special thanks to J. Pfingstner and J. Snuverink 1CLIC-ACE, February 2nd,
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Personal Comment for Flight Simulator for ATF2 Basically the concept of the flight simulator(FS) is very fine for us. It makes easy for many people to.
Lucretia - Floodland Flight Simulator for ATF2 Glen White SLAC ATF2 Project Meeting Dec 2007.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Glen White SLAC Nov  I think my ideas on what the “flight simulator” concept should be is not compatible with the current plans for the ATF2.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Orbit feedback design for the CLIC ML and BDS Orbit feedback design for the CLIC ML.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
T. Okugi and M. WoodleyDecember 21, th ATF2 Project Meeting Summary of Session on Hardware/Devices for Commissioning.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner, Hector Garcia Morales 15 th of.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
ATF2 Mover Software 19 June 2008 Janice Nelson, Doug McCormick (SLAC) Glen White (LAL/SLAC) Justin May (no longer at SLAC)
Wakefield Calculations for the ATF2 Beamline A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Instrumentation Summary: Instrumentation QBPMs, Magnet Movers and Remote Shift Participation Justin May SLAC.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
J. Pfingstner, LCWS13 Jitter and ground motion studies November 13, 2013 Beam jitter at ATF2: A. Source localisation and B. Ground motion correlation Jürgen.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner, Hector Garcia Morales 12 th of.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Adaptive control scheme for the main linac of CLIC Jürgen Pfingstner 21 th of October.
2/20/2016J-PARC1 Virtual Accelerator An Accelerator Simulator.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Introduction D. Schulte for K. Kubo and P. Tenenbaum.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Ground motion studies at ATF2 June 11, 2014 Orbit jitter source identification via ground motion studies at ATF2 (Results of the June run) Marcin Patecki,
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
For discussion of ATF2 beam time requests SLAC team October 1, 2008.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
J. Snuverink and J. Pfingstner LinSim LinSim Linear Accelerator Simulation Framework with PLACET an GUINEA-PIG Jochem Snuverink Jürgen Pfingstner 16 th.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Special ATF Session - ATF/ATF2 day on 28th September -
Flight Simulator for ATF2
Expected hardware status and Priority of the commissioning task
Beam jitter experiment of exchanging power supplies
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
ATF/ATF2 Control System
ATF2 review R. Tomas ATF2 review web:
Head-Tail monitor Benoit, with the help of Christian Boccard and Ralph Steinhagen (BE/BI-QP)
Towards a ground motion orbit feed-forward at ATF2
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Report about the ATF operations training Hector Garcia Morales Jürgen Pfingstner Yves Renier 20 th of June 2012

CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Content 1.Report about the ATF operations training (Juergen) 2.ATF2 tuning status (Yves) 3.Jitter reconstruction measurements (Hector)

CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training ATF complex and control room

CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Training activities Received lectures: Damping ring tuning, Kijoshi Kubo, 1h FFS design and tuning, Glen White, 3h Mover systems, Janice Nelson, ½ h Cavity BPM system, ½ h, Steward Boogert Tuning knobs, S. Kuroda, 1h IP beam size measurement with Wire scanner and Shintake monitor, 1h, T. Okugi Participation in 2x8h shifts Rest of the time: autodidactic learning (Flight Simulator)

CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Flight Simulator Software to control the ATF hardware and low-level control software Parallel to VSYSTEM Matlab-based Flight Simulator can run on Real machine Lucretia model of the accelerator

CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Flight Simulator Advantages: Code can be tested on the model off-line before it is used on the real accelerator. Reduces necessary beam time and prevents on-line bugs. Students can train themselves without using the real machine Two interfaces available: Control panel Matlab terminal

CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Planned experiment

CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Ground motion experiment Collecting of information from mainly Glen White and Yves Time stamp synchronisation of BPM and NI system via Network Time Protocol (NTP) Beam arrival system available at many location in TTL an NIM standard. Signals are clear (low noise) and triggering should be no problem Cabling will be difficult to do by ourselves. Probably has to be done by Japanese technicians.