SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – 96.81 % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.

Slides:



Advertisements
Similar presentations
Line Efficiency     Percentage Month Today’s Date
Advertisements

Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
POWER GRID CORPORATION OF INDIA LTD
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
Jan 2016 Solar Lunar Data.

Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
ABT & Frequency.


2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


Wireless Local Number Portability Timeline - Phase 2
Step 3 Step 2 Step 1 Put your text here Put your text here
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat

©G Dear 2008 – Not to be sold/Free to use
Electricity Cost and Use – FY 2016 and FY 2017

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Wireless Local Number Portability Timeline - Phase 2

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Change Management E2E Roadmap
Presentation transcript:

SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA POLE-II –GAZUWAKA-VIJAYAWADA CKT-II AND III –HYDERABAD-KURNOOL-GOOTY-NELAMANGALA –MADURAI – TRIVENDRUM D/C LINE –KAIGA – NARENDRA LINE –NELAMANGALA – MYSORE D/C LINE –NELAMANGALA – BANGALORE D/C LINE (NEXT MONTH) SPECIAL PROTECTION SCHEME FOR TALCHER-KOLAR –SYSTEM CONTINGENCY AVERTED ON 26 JAN BIPOLE TRIP 28 APRIL 2005 – BIPOLE TRIP 9 TH MAY 2005 – ONLY POLE IN SERVICE TRIPPED SPECIAL PROTECTION SCHEME FOR KUDANKULAM LOSSES IN GRID REDUCED CONSIDERABLY IMPROVEMENT IN SYSTEM SECURITY AND RELIABILITY PROFILE

SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREE GOVERNOR MODE OF OPERATION KADAMPARAI PUMP MODE OPERATION STEPPED-UP IR TRANSACTIONS MERIT-ORDER DESPATCH :- IMPACT OF REAL TIME DATAMERIT-ORDER DESPATCH :- IMPACT OF REAL TIME DATA REMOTE CONTROL INTERFACE:- CONTROL OF TALCHER- KOLAR DC POWER FROM RLDCREMOTE CONTROL INTERFACE TRAINING ON ULDC FOR SR CONSTITUENTS

FREQUENCY DURATION CURVE , , & < & < & Above MaxMin

FREQUENCY SPECTRUM OF SOUTHERN REGION FOR PAST SIX YEARS

FREQUENCY DISTRIBUTION HISTOGRAM OF SR DURING LAST 4 YEARS

TYPICAL VOLTAGE PROFILE IN SR (BANGALORE) DURING LAST 5 YEARS JAN-02JAN-06

VOLTAGE PROFILE OF SOUTHERN REGION FOR PAST SIX YEARS

IN SR MW OF THERMALS OUT OF MW (93%) HAS VARIABLE COST THAT FALLS IN THE RANGE OF 60PAISE TO 400 PAISE DETAILS>400 Ps/u CAP N D ESC TO EXIT

49.72 HZ

Growth Of Inter Regional Energy Exchanges Inter regional Power exchanges have increased manifold

Grid performance

KOLAR SPECIAL PROTECTION SCHEME

KUDANKULAM SPECIAL PROTECTION SCHEME

KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU)

KADAMPARAI GENERATION/PUMP ENERGY FROM JAN GENERATOR MODE PUMP MODE GENERATOR MODE PUMP MODE GENERATOR MODE PUMP MODE GENERATOR MODE PUMP MODE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL

TRAINING ON ULDC SYSTEM SLNAME OF THE TRAININGFROMTOParticipantsMan Days 1CISCO ROUTER & NETWORKING XA-21 USER LEVEL RTNA WORKSHOP AIX OPERATING SYSTEM XA-21 USER LEVEL SYBASE DATABASE ADMIN XA-21 USER LEVEL NMS TRAINING RTU TRAINING JAVA FOR SCADA ENVIRONMENT

KOLAR RCI CONTROL