Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent.

Slides:



Advertisements
Similar presentations
MERIT Pump/Probe Data Analysis Outline  The pump/probe program  Particle detector response correction  Pump/probe analysis results NFMCC Collaboration.
Advertisements

Beam Secondary Shower Acquisition System: Front-End RF Design (2) Student Meeting Jose Luis Sirvent PhD. Student 26/08/2013.
Beam Secondary Shower Acquisition System: Analogue FE installation schedule and Digital FE Status BE-BI-BL Jose Luis Sirvent Blasco
PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
Laser Testing of Silicon Detectors Rhorry Gauld University of Saint Andrews IPM program – PPD Mentor: Ronald Lipton 30/07/08 1.
Beam Secondary Shower Acquisition System: ICECAL_V3 Board and QIE10 Mezzanine Test preparations BE-BI-BL Jose Luis Sirvent Blasco 2.
M. Palm, CERN1 Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Beam Condition Monitor for the CMS BCM Group Luis Fernández Hernando (EST/LEA), Christoph Ilgner (EST/LEA), Alick Macpherson (CMS/CMM), Alexander Oh (CMS/CMD),
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Beam Secondary Shower Acquisition System: Cables Measurements Student Meeting Jose Luis Sirvent PhD. Student 22/07/2013.
Senior Design 4006C Group G7 Design Presentation 1394b – Receiver The new generation of FireWire. Luke Starnes (gte874d) Aparna Trimurty (gt9794a) Jeff.
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
Beam Secondary Shower Acquisition System: Cable Conclusions & Possibilities Student Meeting Jose Luis Sirvent PhD. Student 27/05/2013.
Beam Secondary Shower Acquisition System: QIE10 Front-End, Remote Initialization BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
CLIC and ILC Power Distribution and Power Pulsing Workshop Summary Document 10/5/2011G. Blanchot1.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
Shan Liu, Philip Bambade, Sha Bai, Dou Wang, Illia Khvastunov ECFA, Hamburg, 29 May, 2013.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
Abort Gap Monitoring Randy Thurman-Keup 6 / 8 / 2004 LARP Meeting.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Beam Secondary Shower Acquisition System: Front End: QIE10+GBTx+VTRx Student Meeting Jose Luis Sirvent PhD. Student 25/11/2013.
Beam Secondary Shower Acquisition System: 2014_11_24_GBT_On_Igloo2 Release BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent Blasco.
STORM Beam Instrumentation First ideas Lars Søby on behalf of the CERN Beam Instrumentation Group.
Beam Secondary Shower Acquisition System: Igloo2_UMd_Mezzanine and QIE10 preliminary testing PART II BE-BI-BL Jose Luis Sirvent Blasco
SEM SIC SEM SIC 2 SEMs & 2 SICs closed to the Dumps 1 SIC, 1 Faraday cup & 1 SEM SEM SIC F. cup 4 similar set-ups : Girder 6,7,11 and 13 4 th – 8 th October.
Optical position sensor for the BWS Upgrade: Disk Samples measurements at different roughness (Stainless Steel and Aluminium) BE-BI-BL Jose Luis Sirvent.
Beam Secondary Shower Acquisition System: RF Front-End Design (3) Student Meeting Jose Luis Sirvent PhD. Student 2/09/2013.
THE NEW FAST WIRE SCANNER DESIGN FOR THE PSB
Laser Measurements (as comparison to test beam data) Florian Lütticke University of Bonn 9 th VXD Belle 2 Workshop Valencia,
Beam Secondary Shower Acquisition System for Wire Scanners using Diamond Detectors BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Beam Secondary Shower Acquisition System: RF design techniques for 40MHz ADC Student Meeting Jose Luis Sirvent PhD. Student 30/09/2013.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Beam Secondary Shower Acquisition System: ICECAL_V3 Mezzanine Board, initial developments BE-BI-BL Jose Luis Sirvent Blasco 2 Jose.
BWS Design meeting Jose Luis Sirvent PhD. Student XX/03/2014
Plans for this meeting Analysis of DNA setup data + improvements of setup Look into charge readout options of gas detectors (AGET/DREAM chips) Test new.
Beam Secondary Shower Acquisition System: Front-End RF Design
Fabio, Francesco, Francesco and Nicola INFN and University Bari
LIU Wire Scanner Project
Plans for this week MWPC: wire stretching today
Student Meeting Jose Luis Sirvent PhD. Student 12/08/2013
Mariagrazia, Givi, Chiara, Alessia
Student Meeting Jose Luis Sirvent PhD. Student 27/01/2014
New LED driver Preliminary tests
Injectors BLM system: PS Ring installation at EYETS
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
大強度
Jose Luis Sirvent Blasco BE-BI-BL
Summary: Workshop on CMS Beam Conditions, Radiation Monitoring and Luminosity Systems Oliver Stein, May 2013, CERN.
The New Readout Electronics for the SLAC Focusing DIRC Prototype (SLAC experiment T-492 ) L. L. Ruckman, G. S. Varner Instrumentation Development Laboratory.
BESIII EMC electronics
Status of muon monitor R&D and construction
e+ Vertical Beam Size during CESR-c Collisions
Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA M. Palm, CERN.
e+ Vertical Beam Size during CESR-c Collisions
Bunch Profiling with a Rotating Mask
LIU BWS Firmware status
Pulsed electron beam cooling experiments: data & preliminary results
Presentation transcript:

Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent Blasco PhD. Student Student Meeting 22/06/2015

1. Preparing the pCVD Amplifier 1.1 Transimpedance amplifier configuration Something extremely simple (J. Koopman 08/10/2007 EDA-01716) 1x THS3001 1x Resistor 1 K ohm 2x Resistor 51 ohm BE-BI-BL Jose Luis Sirvent Blasco 3 2 x Decoupling Caps 100nF 2 x Decoupling Caps 6.8uF 2 x SMA Connectors (IN/OUT) 2 x LEMO Connectors (Power +/- 12V) I in V out Vout = Rf * Iin V out (50 ohms Load) = (1K * I in) / 2

BE-BI-BL Jose Luis Sirvent Blasco 4 1. Preparing the pCVD Amplifier 1.2 Testing before installation 20 ns 350 mV Using a Photodiode to emulate the Diamond Detector: Aim: Testing the timing behaviour Same electric model (but different values) Similar response (light   charged particles) Laser driver circuit built Modulation with pulse source (3ns pulses) Laser direct modulation SMF 9/125 um connection

BE-BI-BL Jose Luis Sirvent Blasco 5 1. Preparing the pCVD Amplifier 1.2 Testing before installation 20 ns 350 mV Using a Photodiode to emulate the Diamond Detector: Aim: Testing the timing behaviour Same electric model (but different values) Similar response (light   charged particles) Laser driver circuit built Modulation with pulse source (3ns pulses) Laser direct modulation SMF 9/125 um connection

BE-BI-BL Jose Luis Sirvent Blasco 6 1. Preparing the pCVD Amplifier 1.3 Same Set-up but with CIVIDEC 20dB amplifier (just for curiosity) Faster (obviously) Ringing observed

BE-BI-BL Jose Luis Sirvent Blasco 7 1. Preparing the pCVD Amplifier 1.4 Testing before installation (now with radiation, Alpha) CIVIDEC 40dB AmplifierTransimpedance EDA mV ~ 13ns 4 mV ~ 13ns 40 mV ~ 7ns pCVD HV = 700V pCVD HV = -700V Thanks to Marcin collaboration!

Connections: A  HV A  +12V A  -12V A  Signal Cable Distance: 80m up to measurement point BE-BI-BL Jose Luis Sirvent Blasco 8 2. Measurements on SPS BA5 2.1 Testing profiles on BWS51730 (Set-up) BWS51730 H&V pCVD + Amplif Scintillator + PMT + Amplif ~ 1.6m On Surface… Synch (Turn + Bunch Clk)

BE-BI-BL Jose Luis Sirvent Blasco 9 2. Measurements on SPS BA5 2.1 Testing profiles on BWS51730 (Single Loss, no Scan done)

BE-BI-BL Jose Luis Sirvent Blasco Measurements on SPS BA5 2.1 Testing profiles on BWS51730 (Speed: 1 ms-1, Beam : 1e10 ppb, pCVD HV= - 700V) Just showing RAW DATA analysis needed!!

BE-BI-BL Jose Luis Sirvent Blasco Measurements on SPS BA5 2.1 Testing profiles on BWS51730 (Speed: 1 ms-1, Beam : 1e10 ppb, pCVD HV= + 700V) Just showing RAW DATA analysis needed!! Wider??

BE-BI-BL Jose Luis Sirvent Blasco Measurements on SPS BA5 2.1 Testing profiles on BWS51730 (Speed: 1 ms-1, Beam : 1e10 ppb, pCVD HV= + 500V) Just showing RAW DATA analysis needed!! Wider??

BE-BI-BL Jose Luis Sirvent Blasco Measurements on SPS BA5 2.1 Testing profiles on BWS51730 (Speed: 1 ms-1, Beam : 1e10 ppb, pCVD HV= + 300V) Just showing RAW DATA analysis needed!! Wider??

3. Issues and To-do list 1. Scans data from BWS51730 not stored on DB Need to repeat measurements for comparison 2. Noise studies (FFT, distribution, stdev…) Check correlation with Cable measurement campaign (all systems were off) 3. Profile analysis and processing (To-do) Base-Line removal Integrals by software every 25ns (using Bunch CLK) Voltage on 50ohm  Charge value Select only one bunch Gaussian fit on profiles considering 1ms-1 (Beam sigma comparison) Study non-uniformity of Gaussian profile (Scint + PMT looks “more Gaussian”) Betatron oscillations?? Effect of random particle shower?? Wire vibration?? Noise on HV?? Longer pulse?? … Theories are welcome!! BE-BI-BL Jose Luis Sirvent Blasco 14 Thanks to Emiliano’s help!