Do we need WVRs for geodetic VLBI? Joerg Wresnik (1), Johannes Boehm (1), Harald Schuh (1), Arthur Niell (2) Workshop on Measurement of Atmospheric Water.

Slides:



Advertisements
Similar presentations
03/000 First geodetic results from the AuScope VLBI network Oleg Titov Australian Government Geoscience Australia UTAS, Hobart, 20 June 2012.
Advertisements

Principles of the Global Positioning System Lecture 12 Prof. Thomas Herring Room A;
VieVS User Workshop 7 – 9 September, 2010 Vienna Vie_LSM Kamil Teke and Johannes Böhm.
A quick GPS Primer (assumed knowledge on the course!) Observables Error sources Analysis approaches Ambiguities If only it were this easy…
[1] ICHIKAWA Ryuichi, [2] ISHII Atsutoshi, [3] TAKIGUCHI Hiroshi, KIMURA Moritaka, [1] SEKIDO Mamoru, [1] TAKEFUJI Kazuhiro, [1] UJIHARA Hideki, [1] HOBIGER.
VieVS User Workshop 7 – 9 September, 2010 Vienna VIE_SCHED Jing SUN.
Atmospheric phase correction for ALMA Alison Stirling John Richer Richard Hills University of Cambridge Mark Holdaway NRAO Tucson.
Wettzell WVR Workshop1 October 9-10, 2006 Use of NWM forecasts for converting T B to delay Arthur Niell MIT Haystack Observatory Mark Leidner AER, Inc.
Measurements Calibration EGU06-A-05466/G7-1TH5P-0488 Atmospheric parameter comparisons at the Tsukuba and Kashima VLBI stations during the CONT05 VLBI.
Phase Correction of VLBI with WVRs Alan Roy Ute Teuber Helge Rottmann Reinhard Keller.
VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SIM Jing SUN, Andrea PANY.
VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN.
Dynamical modeling of the DI dust ejecta cloud Tanyu Bonev (Institute of Astronomy and National Astronomical Observatory, Bulgaria) and the ESO DI observing.
VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_LSM Kamil Teke and Johannes Böhm.
15 Sep 2006 IVS VLBI2010 Haystack0 It’s About Time !!!!!
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
IGS Analysis Center Workshop, Miami Beach, June 2008 Comparison of GMF/GPT with VMF1/ECMWF and Implications for Atmospheric Loading Peter Steigenberger.
Estimating Heights and Atmospheric Delays “One-sided” geometry increases vertical uncertainties relative to horizontal and makes the vertical more sensitive.
The XXIV FIG International Congress 2010 Facing the Challenges – Building the Capacity April Sydney, Australia SOME STUDIES ON THE.
NGS GPS ORBIT DETERMINATION Positioning America for the Future NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION National Ocean Service National Geodetic.
VLBI2010 Reference antenna for antenna deformations and site ties East Coast Geodetic VLBI Meeting Feb, 2011, Haystack Observatory Bill Petrachenko.
Space Geodesy (1/3) Geodesy provides a foundation for all Earth observations Space geodesy is the use of precise measurements between space objects (e.g.,
Tropospheric parameters from DORIS in comparison to other techniques during CONT campaigns Johannes Böhm (1), Kamil Teke (1, 2), Pascal Willis (3, 4),
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
IVS GM January 10, 2006 Interaction of Atmosphere Modeling and VLBI Analysis Strategy Arthur Niell MIT Haystack Observatory.
測地 VLBI 技術による 高精度周波数比較 VLBI MEASUREMENTS FOR FREQUENCY TRANSFER 日本測地学会第 112 回講演会 2009 年 11 月 6 日 ( 金 ) 産業技術総合研究所 Ⅴ. 測地測量・地球潮汐・測地 瀧口 博士 1 ,小山 泰弘 1 ,市川 隆一.
The ICRF, ITRF and VLBA Chopo Ma NASA’s Goddard Spaceflight Center.
35th COSPAR Scientific Assembly, Paris, July 18-25, IVS Products for Precise Global Reference Frames Wolfgang Schlüter Bundesamt für Kartographie.
Prospective Improvements of IVS Products and Evolvement of Observing Programs Harald Schuh WG2 Chair Vienna University of Technology
Nov , /24 An Evaluation of the Practicability of Current Mapping Functions using Ray-traced Delays from JMA Mesoscale.
State-of-the-art physical models for calculating atmospheric pressure loading effects 1 Geodätische Woche October, Köln, Germany Dudy D.
Chair’s Report 4 th IVS General Meeting Concepción/Chile, January 9-12, 2004 Wolfgang Schlüter Bundesamt für Kartographie und Geodäsie, Fundamentalstation.
Thoughts on the Design of a WVR for Alan Roy (MPIfR) the Twin Telescope at Wettzell.
January 14, 2003GPS Meteorology Workshop1 Information from a Numerical Weather Model for Improving Atmosphere Delay Estimation in Geodesy Arthur Niell.
Harald Schuh (Chair of the IVS Directing Board) Dirk Behrend (Director of the IVS Coordinating Center) The International VLBI Service for Geodesy and Astrometry.
Combination of long time series of tropospheric parameters observed by VLBI R. Heinkelmann, J. Boehm, H. Schuh Institute of Geodesy and Geophysics, TU.
Principles of the Global Positioning System Lecture 12 Prof. Thomas Herring Room ;
Global VLBI Solution IGG05R01 1 Institute of Geodesy and Geophysics (IGG), Vienna, Austria 2 German Geodetic Research Institute (DGFI), Munich, Germany.
VLBI2010: A Vision for Future Geodetic VLBI This poster summarizes the results of IVS Working Group 3 ‘VLBI2010’, which was charged with creating a vision.
VLBI Oct Development Status of Broadband VLBI System (Gala-V) -(II) M.Sekido (1), K.Takefuji (1), H.Ujihara (1), M.Tsutsumi.
Canada’s Natural Resources – Now and for the Future Broadband Delay Tutorial Bill Petrachenko, NRCan, FRFF workshop, Wettzell, Germany, March 18, 2009.
VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra.
Modeling Errors in GPS Vertical Estimates Signal propagation effects –Signal scattering ( antenna phase center/multipath ) –Atmospheric delay ( parameterization,
IVS High Accuracy Products for the Maintenance of the Global Reference Frames as a Contribution to GGOS VLBI provides high accuracy and unique products.
Institute of Geodesy and Geophysics, Vienna University of Technology Vienna, February 2004 Harald Schuh Subgroup "Data Analysis" of Working Group 3 VLBI2010.
Comparison of Wet Path Delays, observed with Water Vapour Radiometers, Sun Spectrometer, Radiosondes, GPS and VLBI at the Fundamental Station Wettzell.
IGARSS 2011, Vancuver, Canada July 28, of 14 Chalmers University of Technology Monitoring Long Term Variability in the Atmospheric Water Vapor Content.
Reprocessing CEGRN campaigns M. Becker(1), A. Caporali(2), R. Drescher(1), L. Gerhatova(5), G. Grenerczy(3), C. Haslinger(4), J. Hefty(5), S.
IVS Coordinating Center Report Dirk Behrend 4 th IVS General Meeting and 15 th Directing Board Meeting January 9-13, 2006.
EVN 2015: Astrometry Parallaxes of Galactic sources.
IERS Combination WG and CPP Meeting, April 27, 2005, TU of Vienna, Austria Status and Future of the IERS Combination Efforts Markus Rothacher GeoForschungsZentrum.
IERS Combination WG and CPP Meeting, April 27, 2005, TU of Vienna, Austria Strategies for Weekly Routine Generation of Combined IERS Products Markus Rothacher.
Homework | Reprojection Error
Proper motion accuracy of WFPDB stars
Space Geodesy Branch Highlights, August 2002 CONT02 VLBI Campaign
Haystack Geodesy Program and Technical Development
Modeling tropospheric delays in space geodetic techniques
EMS Annual Meeting 2017 September 4-8, 2017 Dublin, Ireland
Assessing the Compatibility of Microwave Geodetic Systems
Kamil Teke and Johannes Böhm
Multi-technique comparison of troposphere zenith delays and gradients during CONT08 Kamil Teke (1,2), Johannes Böhm(1), Tobias Nilsson(1), Harald Schuh(1),
Troposphere and Clock Parameterization During Continuous VLBI Campaigns Kamil Teke1, 2, Johannes Boehm1, Hana Spicakova1, Andrea Pany1, Harald Schuh1 1.
IDS workshop, Venice, Italy, September 2012
WHY DOES THE IGS CARE ABOUT EOPs?
VLBI Estimates of Vertical Crustal Motion in Europe
T. Hobiger R. Ichikawa Y. Koyama T. Gotoh T. Otsubo T. Kubooka
Technical Considerations on VLBI Astrometry with FAST Zhihan Qian(钱志瀚) and Bo Zhang(张波) Shanghai Astronomical Observatory, CAS Outline Existing VLBI.
測地VLBI技術による 高精度周波数比較 VLBI MEASUREMENTS FOR FREQUENCY TRANSFER
Correlation coefficients
27th IUGG General Assembly July 8-18, 2019 Montreal, Canada
Presentation transcript:

Do we need WVRs for geodetic VLBI? Joerg Wresnik (1), Johannes Boehm (1), Harald Schuh (1), Arthur Niell (2) Workshop on Measurement of Atmospheric Water Vapour: Theory, Techniques, Astronomical and Geodetic Applications Wettzell / Hoellenstein (Germany), October 9-11, 2006 (1) Institute of Geodesy and Geophysics (IGG), TU Vienna, Austria (2) MIT Haystack Observatory, MA, USA

VLBI 2010 Working Group 3 of IVS ( ) Tasks: Current and Future Requirements for Geodetic VLBI Systems Design a new VLBI observing system based on small antennas with 1mm accuracy - number, location and configuration of antennas System studies and simulations accuracy of 1mm site position & of 1mm/year velocity continuous measurements for EOP rapid generation & distribution of IVS products Goals:

Monte Carlo simulation τ atmosphere clocks wzd & clocks are stochastic processes simulate for station 1 and 2 90-e 2 1

Simulation of wzd and clock parameters random walk variances of: 0.1 psec²/s 0.7 psec²/s Simulate the wet zenith delay

Simulation of wzd and clock parameters Simulate the clocks random walk Allan standard deviation of: 2∙10 1∙10

Simulation of wzd and clock parameters Simulate observation errors white noise: 4 psec 8 psec 16 psec

Simulation of wzd and clock parameters simulation of 25 identical 24 hour sessions What are the effects of wzd and clocks? Does a “4psec antenna” improve the results? simulate wzd 25 times for each station generate white noise 25 times for each station simulate clocks 25 times for each station 0.1 psec**2/sec 0.7 psec**2/sec 4 psec 8 psec 16 psec

Obs. Schedule: fast antennas The schedule was created by Anthony Searle and Bill Petrachenko

Obs. Schedule: high observation density 5760 scans observations 16 stations 120 baselines 100 scans/hour/station Antenna specification using 16 antennas with the same size as Algonquin but with faster slewing rates azimuth max slewing rate of 18 deg/s azimuth max acceleration of 3.6 deg/s² elevation max slewing rate of 4.5 deg/s elevation max acceleration of 0.9 deg/s² data rate of 48 Gb/s. Scan length 5 sec every 30 sec Source catalogue 50 sources

Baseline lengths repeatability 4 psec wet zenith delay (ASD) psec**2/sec (PSD) 0.1 psec**2/sec clocks 16 psec white noise if the PSD of wet zenith delay is 0.7 psec**2/sec, 4 psec antennas give the same result as 16 psec antennas by PSD of wet zenithdelay of 0.1 psec**2/s 0.7 psec**2/sec the wet zenith delay is the limiting factor

Largest PSD values for wet zenith delay – lowest PSD values for clocks: Conclusions and outlook PSD of wet zenith delays dominates the baseline length repeatability hardly any difference between ‘4, 8 and 16 psec antennas' WVR could improve geodetic VLBI Simulation for wzd station dependence elevation and azimuth dependence Next steps

Thanks for your attention