1 1/20/2011 PHENIX WEEKLY PLANNING 1/20/2011 Don Lynch.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
1 12/3/2009 PHENIX WEEKLY PLANNING 12/3/2009 Don Lynch.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
1 2/3/2011 PHENIX WEEKLY PLANNING 2/3/2011 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 4/7/2011 PHENIX WEEKLY PLANNING 4/7/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/3/20111 PHENIX WEEKLY PLANNING 11/3/2011 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
5/5/11 1 PHENIX WEEKLY PLANNING 5/5/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 12/09/2010 PHENIX WEEKLY PLANNING 12/09/2010 Don Lynch.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
1 3/24/2011 PHENIX WEEKLY PLANNING 3/24/2011 Don Lynch.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/1/20121 PHENIX WEEKLY PLANNING 3/1/2012 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 12/02/2010 PHENIX WEEKLY PLANNING 12/02/2010 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
1 3/31/2011 PHENIX WEEKLY PLANNING 3/31/2011 Don Lynch.
10/20/20111 PHENIX WEEKLY PLANNING 10/20/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
1 1/28/2010 PHENIX WEEKLY PLANNING 1/28/2010 Don Lynch.
8/11/20111 PHENIX WEEKLY PLANNING 8/11/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
12/15/20111 PHENIX WEEKLY PLANNING 12/15/2011 Don Lynch.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

1 1/20/2011 PHENIX WEEKLY PLANNING 1/20/2011 Don Lynch

2 1/20/2011 This Week: Monday - Laboratory Holiday – Martin Luther King Day First Maintenance Accesss Day VTX strippixel ladder repair – successful VTX flows balanced, VTX flowmeter failure RPC work Aerogel checked PbGl FEM repaired LPOL cables partially recovered Continue support for new detector commissioning Continuing mechanical, electrical and gas system support for Run 11 New stairs to VTX chiller platform 2010 Shutdown Post Mortem – Friday at 10:00 AM: engineers and techs: Review 2010 Shutdown: How did we do? What can we do better in the future? Plan for shutdown 2011 Future upgrades support

3 1/20/2011 Next Week Continue support for new detector commissioning Continuing mechanical, electrical and gas system support for Run 11 Continue planning for shutdown 2011 Future upgrades support

4 1/20/2011 Remaining Tasks from Shutdown carried over to Post Run 11 Start ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXClose out all 2010 shutdown WP'sDone PHENIXEnd of shutdown partyDone PHENIX Chiller platform fire detection and suppression 1/31/2011In Progress

5 1/20/2011 Looking Ahead to the 2011 Shutdown Run 11 Ends6/30/2010 Shutdown Standard Tasks (Open wall, disassemble wall, Remove MuID Collars, Move EC to AH, etc.7/21/2010 Disassemble VTX services8/1/2010 Remove VTX and transport to Chemistry Lab8/15/2010 BBC North maintenance8/31/2010 MuTr North Station 1 work9/15/2010 VTX maintenance and integration of FVTX onto VTX support structure9/15/2010 Install VTX&FVTX 9/30/2010 Undefined detector subsystem maintenance and repairs10/7/2010 RPC1 and Absorber upgrades10/7/2010 Roll in EC10/7/2010 VTX and FVTX Services and commissioning10/30/2010 Prep for run 1210/31/2010 Run 12 cooldown11/1/2010

6 1/20/2011 Roof leaks in utility bathroom at northwest corner behind tech offices, over door between rack room and assembly hall, over door between control room and elect. ass’y room, southeast corner of IR and laser room. General maintenance for Trailer Offices (in progress) -Repair replace floor tiling as Flooding in AH/ Driveway heaving [Lake PHENIX] New HVAC in Control Room and Conference Room - Done New projector for conference room – Add USB Repeater & network connection 2010 Building Maintenance Issues

7 1/20/2011 Trailer Office Space Allocation Space Allocation for run Elec. Engr P. Giannotti (P.Giannotti) 2. Run Coordinator/Chief Engr (D.Lynch) 3. Documents (P. Giannotti) 4. Electrician: (M. Rau) 5. Mu Tr (M. Leitch) 6. PbSc (E. Kistenev) 7. PHENIX Engineering (D.Lynch) 8. Engineering Documents (P.Giannotti) 9. Trailer Conference Area (P.Giannotti) 10. Computer Network Cage (P.Giannotti) 11. Printing & Fax (P.Giannotti) 12. PC (A. Oskarsson) 13. VTX (J. Koster) 14. TOF Aerogel (M. Shimomura) 15. RICH (A. Takahara ) 16. BBC (T. Sugitate) 17. FEM Electronics Lab (J. Haggerty) 18. DAQ /Trigger (C. Chi) 19. DAQ (C. Chi) 20. DC (V. Riabov) 21. PbGl (J. Frantz) 22. Storage (C. Biggs) 23. Analysis Center (RC/PC) 24. MPC/RPC (M. Chiu) 25. Storage (C. Biggs) 26. Ladies’ Bathroom (C-A) 27. Men’s Bathroom (C-A) 28. Storage (C. Biggs) Note: Space is assigned by subsystem/support function not by individual or institution. Name/Group in parentheses is responsible for maintaining the assigned subsystem/ support function space. Changes to allocation must be approved by PHENIX Operations management

8 1/20/2011 PHENIX Procedure Review Current Status: 148 Procedures Identified 85 Made Inactive (not currently in use, will require revision to re- activate if and when necessary, available for reference purposes) 9 CAD procedures relevant to PHENIX, all are up to date and available on the CAD web site 42 PHENIX approved procedures. all are current and up-to-date 11 Proposed/Draft Procedures (never previously formalized) (3 are ready for review) These will be addressed during next few months. Web retrieval of latest procedures now available from PHENIX Internal:

9 1/20/2011 Safety, Security, Etc. 1.A new document has been made available on the HSS Web Site: Safety Advisory Revised Counterfeit Integrated Circuits Indictment. Please go to : to view this new posting. 2.OSHA will continue requiring independent safety testing for electrical devices 3. BNL Recent Injuries 1/10/11 First Aid An employee reported a neck injury that occurred while mopping the floor. At the OMC, first aid was given. 1/10/11 First Aid A contractor employee was injured when a grill cover fell onto their hand, causing a small puncture wound. At the OMC, first aid was given. 1/10/11 Pending An employee was finished taking a CBT web course, stood up from the chair and his left knee popped. He went to the OMC who advised him to follow up with an orthopedic doctor. The OMC is evaluating if this is work related. 1/7/11 Recordable An employee slipped and fell on ice in the parking lot just after arriving for work. At the OMC, first aid was given and the employee was sent off ‐ site for x-rays. The outside MD prescribed medication making this recordable. 4.Snow tonight- Latest forecast is for snow, mainly after midnight with accumulations of 2-5 inches likely by Friday Afternoon. Check INFO before coming to the lab Friday morning and drive carefully coming to and driving around the lab.

10 1/20/2011 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: AFC & NFC Championship Games start Sunday at 3:00PM (NFC) with the Bears and Packers Jets/Steelers in the AFC game starting at 6:30 PM