Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.

Slides:



Advertisements
Similar presentations
ASTM International Officers Training Workshop September 2012 Pat Picariello, Director, Developmental Operations 1 Strategic Planning & New Activity Development.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
GENI Experiment Control Using Gush Jeannie Albrecht and Amin Vahdat Williams College and UC San Diego.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
What’s up at SLAC Linear Collider R&D organization Tom Himel SLAC Linear Collider Consortium Organizational Meeting Cornell April 19, 2002.
Model Building and Collider Phenomenology Maxim Perelstein, Cornell LHC Theory Initiative Meeting, May
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
HEPiX Catania 19 th April 2002 Alan Silverman HEPiX Large Cluster SIG Report Alan Silverman 19 th April 2002 HEPiX 2002, Catania.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
US CMS Collaboration Meeting: April 7-8, LHC Remote Operations Center Erik Gottschalk Fermilab.
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
LHC Accelerator Coordination Meeting: March 28, Remote Operations for CMS Erik Gottschalk.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
LARP Accelerator Systems : “home work” Vladimir Shiltsev bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
CERN Probably one of the most incredible experiments in the world!
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
The Experimental Physics Projects Department - an Overview David Christian September 11, 2006.
Workshop on Computing for Neutrino Experiments - Summary April 24, 2009 Lee Lueking, Heidi Schellman NOvA Collaboration Meeting.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Operations, Test facilities, CF&S Tom Himel SLAC.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
June 15, 2002David Finley to Aspen PAC Slide 1 Report on 132 nsec Operation Report to the Fermilab.
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
1 SPAFOA meeting May 21, 2015 BNL Center Accelerator Stewardship Test Facilities Pilot Program at BNL Ilan Ben-Zvi Head, Accelerator R&D Division, C-AD.
Technology Department WP2 Progress Report Th. Otto
HEPiX 2 nd Nov 2000 Alan Silverman Proposal to form a Large Cluster SIG Alan Silverman 2 nd Nov 2000 HEPiX – Jefferson Lab.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Accelerator Physics Department Meeting July 26, 2006 Jean slaughter1 Status Report APD Meeting July 26, 2007 Jean Slaughter.
Luminosity measurement at LHC (The machine point of view) Enrico Bravin AB/BDI Large part of the material presented here has been produced by the LBNL.
John Womersley LHC Joel Butler, Marcela Carena, Jim Strait, John Womersley No formal meeting of the group yet, but we took the opportunity to sit with.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
Computing Division FY03 Budget and budget outlook for FY04 + CDF International Finance Committee April 4, 2003 Vicky White Head, Computing Division.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
Olivier Callot 5 June 2007 Electronic Logbooks Why moving away from Atlog ? Proposed improved configuration Release schedule.
Elections for USLUO’s Executive Committee John Huth, Harvard Boaz Klima, Fermilab 2 nd US LUO Annual Meeting September 25-26, 2009.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
A successful public- private partnership Alberto Di Meglio CERN openlab Head.
CMS Crosscut Operations and Research, Theory, Computing, University Involvement C. Young and B. Zhou.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
US CMS Meeting U. Virginia May 8, US CMS Constitution Nick Hadley May 8, 2009.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
Remote Operations Committee – May 12, Subgroups and Scenarios Erik Gottschalk May 12, 2005.
UEC Meeting: May 6, Remote Operations Center Erik Gottschalk.
A successful public- private partnership Maria Girone CERN openlab CTO.
Plans towards CC in the LHC a US – centric perspective
LHC Science Goals & Objectives
Remote Operations Erik Gottschalk Fermilab
The European Strategy for Particle Physics
Remote Operations Erik Gottschalk 5 October, 2005
Assessment of Our Status After 183 Days (6 months)
Update Erik Gottschalk.
Remote Operations Erik Gottschalk 7 September, 2005
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
LINAC OPS Budget Review
Prospect of Indo-US Collaboration
Presentation transcript:

Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research Program

7 April 2005Remote Monitoring - E. Harms/FNAL2 Remote Monitoring Outline Why Remote Monitoring? Endorsements The Fermilab Experience Current Status Next Steps Summary Remote Monitoring is defined as read-only access – no settings!

7 April 2005Remote Monitoring - E. Harms/FNAL3 Remote Monitoring Why? Full-time U.S presence during LHC commissioning – prepare for visit Commission and train CERN personnel on U.S.- provided Instrumentation Remote troubleshooting of Instrumentation Share expertise of commissioning and operating superconducting accelerators Enhance U.S. accelerator expertise

7 April 2005Remote Monitoring - E. Harms/FNAL4 Remote Monitoring Why? Alvin Tollestrup proposal to access data from CMS detector and LHC –CMS It has always been planned to have remote access to the detector. It provides convenient access for the experts that are here to monitor the various components of the detector. Students and post docs can take shifts. The time shift makes it convenient to have wide awake people monitoring the operation. It is easy to involve students and even undergraduates in the excitement of commissioning and running a big experiment. It allows training of new students and postdocs here before they actually spend time at CERN. –Accelerator There has always been a plan to have people from the AD involved in the commissioning phase of the LHC. A remote access of the type that we are contemplating would our involvement much easier and more productive. It is assumed that there will always be a few physicists from the AD present at CERN during commissioning. However, if it is possible to set up a realistic connection with the machine, it would be easy for a person here to actively participate in machine experiments. Two uses: training people before they go to CERN and their continued involvement when they return. Not proposing that any control functions be implemented…. –public Fermilab must become a center for LHC activity if we are to reap the rewards of our investment. A highly visible and functional connection to LHC and CMS located near the cafeteria makes a public statement that can’t be missed. Summer students will be exposed to the activity as well as the visiting public.

7 April 2005Remote Monitoring - E. Harms/FNAL5 Remote Monitoring Endorsements Support expressed by –Fermilab Director –Fermilab Accelerator Division Head –LHC Project Leader –LHC Ops principals –Fermilab Machine/Operations people –LARP

7 April 2005Remote Monitoring - E. Harms/FNAL6 Remote Monitoring the Fermilab Experience Fermilab Accelerator Division –Endorsement of Director –Remote Access Committee formed by AD Head, Roger Dixon Members: Valeri Lebedev; Stephen Pordes; Elvin Harms; Alvin Tollestrup; Mike Syphers; Tanaji Sen The purpose of this committee is to outline the requirements for a remote data access center. The goal is to construct a center that will allow convenient participation of the FNAL Accelerator Division personnel in the commissioning of the LHC. Short report that summarizes such things as the space required, the communication bandwidth required, and the bandwidth required for the data connection. This first stage would be followed later by collaborating with the CMS detector group that is also planning remote access to the detector. It is hoped that the integrating the requirement of the two groups will be mutually beneficial. –First Meeting held on 14 September –Meeting with the Director –Plan/implement rudimentary proof of principle link to CERN

7 April 2005Remote Monitoring - E. Harms/FNAL7 Remote Monitoring Status Ongoing low level efforts between CERN and Fermilab accelerator Division Discussion between CMS and Accelerator Division at Fermilab Fermilab visits to CERN –Computer privileges obtained at CERN –Demonstration of orbit correction application from desktop –Remote access to elogs accomplished CERN visits to Fermilab –Elog access refined (sped up) –Access to LHC applications in progress –More follow-on work in progress and to continue during visits from CERN people Interest in CERN – US interchange –Standards –Schedules –etc.

7 April 2005Remote Monitoring - E. Harms/FNAL8 Remote Monitoring Next Steps Complete ‘proof-of-principle’ Identify hardware and space needs Locate ‘public’ area Refine network links Identify additional needs/capabilities

7 April 2005Remote Monitoring - E. Harms/FNAL9 Remote Monitoring Summary Interest and rationale for remote (read-only) Monitoring expressed Fermilab idea for public RADAC Idea supported at various levels of food chain on both sides of Atlantic Proof of Principle demonstration in process Plans for dedicated ‘Center’ developing Demonstration!