20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

K-12 Obesity Prevention Grants Quarter 2 Grantee Webinar December 12, – 3:30 pm Lauren Kelsey School Grants Manager Alaska Obesity Prevention &
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
for a neutrinos factory
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
The Camp Audit “Keep your friends close and your auditor closer”
Progress report of TFG 7 “Fire resistance test” Mar 18, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
CONSIDERATION OF STREAMLINED PROCESS FOR STIPULATED WASTE TIRE HAULER AND WASTE TIRE FACILTY ADMINISTRATIVE PENALTY CASES CIWMB Board Meeting Agenda Item.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
26/3/03J.E Campagne LAL Horn R&D J.E Campagne, A. Caze (Ph. D), CNGS Horn: G. Macé, S. Wallon New persons: J. Bonis, M. Omesh,… Other IN2P3 members: J.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
U.S./Europe International Aviation Safety Conference By:T Fazio (FAA)/ C Probst (EASA) Date: 7 June 2006 “Global Aviation Safety Processes: Refining, Reinforcing,
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
PS Days, January 2001 The “Plan” B.W.Allardyce The Medium Term Plan is presented at the June FC meeting by the Management and covers 4 years (I.e. in June.
Legal Status Data Legal status project and relating developments in CWS Patentscope Users Forum June 18, 2013 Angel López Solanas.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
NUMI Transmission Line (TL) Review WBS Power Supply System Transmission Line (TL) Review Nancy Grossman FNAL April 23, 2003.
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
CNGS PROJECT STATUS D.Autiero 21/5/2003 General status 2003 Project review CNGS upgrade.
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Progress report of TFG 7 “Fire resistance test” (rev.1) Nov 19, 2014 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
In-depth Assessment Martyn Gorton WDH. WDH Joint Venture.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 3. CERN proposal -> in order to minimize the CERN overhead in the work.
Behavioral Health Initiatives $17,000,000 seems like a large amount, however due to a lack of Medicaid funding, this money will be spent quickly. In order.
July 2014 – March 2019 Emotional Wellbeing and Mental Health: Everybody’s Business OUTCOME OF CONSULTATION.
© JABEE 2015 Fundamental Concept of JABEE Evaluation and Accreditation JABEE evaluation and accreditation is to confirm the engineering educational program.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Introductory Remarks and Meeting Goals
News and brief overview of Beamline plans for the next few months
4th FRC meeting, Antti Onnela, CERN-PH-DT
Target and Horn status report
352MHz Klystron Control for the 3MeV Linac test stand
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
RPC HV&LV status Introduction HV power supply tender
DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
September 8, 2016 Request Approval of the Determinations to be Submitted to Rules Review Commission for Subchapter 15A NCAC 02E (Periodic Review of Existing.
2018 Leadership Meeting, New Orleans
2018 Leadership Meeting, New Orleans
How did we do it? Case examples from AIC
CNGS Project Overview Konrad Elsener.
Discussion of OBD2 by “Correspondence Group” Japan’s proposal
CNGS horn / reflector in 2005: The story of the glass ring insulator
LNG Workshop Bilbao, March 13th 2009 GLE.
NDIA Intent Guide Update for EVMIG.
Alignment of Part 4B with ISAE 3000
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30 June 2004) -- Discussion CERN Proposal Present situation – seen by CERN

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 2 1. Status – as seen from CERN - 25 Nov. 2003: Memo by S. Rangod to CNGS project management “alarm bell number one” - 12 Dec. 2003: phone call + K.E. to B. D’Almagne, expressing worries on progress of the horns at LAL and in particular on the lack of engineering resources - 2 Feb. 2004: B. D’Almagne visits CERN, explains the manpower evolution at LAL - 7 April 2004: first horn delivered to CERN (65k double pulses at 150 kA) - visits to CERN by members of LAL team, discussions with S. Rangod

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener May 2004: Internal note by S. Rangod to CNGS project management “alarm bell number two” - 18 May 2004: Letter by J.E. Campagne informing of lack of money, requesting the C.S.P. meeting - 22 June 2004: List of 16 compulsory and 4 desirable modifications to be made on the horn (by S. Rangod) N.B. Not sure whether all problems have been identified – must wait for horn disassembly 1. Status – as seen from CERN

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener June 2004: visit to LAL by S. Rangod and K. Elsener agreement on the principle that from now on proposals by S. Rangod must be followed; request from LAL for specifications and drawings -> tremendous amount of work for CERN staff - 12 July 2004: cost estimate for the compulsary modifications on horns:  60 kCHF per horn (by S. Rangod,) -> a lot of money (in addition to what is already missing...) 1. Status – as seen from CERN

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 5 1. Status – as seen from CERN today: - have no news concerning the reflector inner conductor -> new delivery schedule ? - have continued worries about the engineering manpower working on the horn project at LAL (worries first expressed to B. D’Almagne on 12 Dec. 2003) - have a tremendous lack of documentation and of up-to-date drawings: -> “what is inside” (the horn) ?

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 6 2. Preliminary conclusions – Review Board 2004 CNGS Review draft report Horn / target hall systems Finding: The main problem is that the LAL group is too small to deal with the remaining horn system items in a timely fashion, and the new team is still on the learning curve as far as understanding the target hall environment goes. Recommendation: The committee has no easy solution to this, and can only recommend that management urgently address this issue as a top priority. [J. Hylen, Fermilab]

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 7 Note that several systems have to be further developed: The stripline fast connection The stripline to the transformer The radioactive water system The remote water connection The horn foot support system The “Stefane” list of horn modifications The hot handling procedures Air flow cooling issues 2. Preliminary conclusions – Review Board [J. Hylen, Fermilab]

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 8 Comments: A second horn power supply needs to be commissioned so that horn testing can continue as the main supply is moved to the “target hall” LAL should be provided with the thermal environs, and the specifications to them should reflect the ultimate intensity rather than the nominal intensity. [J. Hylen, Fermilab] “DONE” 2. Preliminary conclusions – Review Board mis-understanding ?

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 9 Further iteration of the hot handling equipment/procedures and radiation dose calculations are urgently needed Stefane will retire soon; must provide continuity (others to work with him) and also make sure document control for horn systems is rigorously enforced. Agree with the CERN list of horn system modifications we were provided,... [J. Hylen, Fermilab] 2. Preliminary conclusions – Review Board

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener Preliminary conclusions – Review Board Summary: - More manpower needed at LAL - More manpower needed at CERN (outside the scope of review: more money needed for LAL horn project )

20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener DISCUSSION --