HIE-ISOLDE Project Status Report 50th ISOLDE & nTOF Technical Committee meeting July 1st 2015 Y. Kadi.

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

Superconducting Spoke Resonator Cavities and Cryomodules
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HIE-ISOLDE Project: Status Report EXTRA COSTS AND ADDITIONAL RESOURCES CERN, 29 January 2013 Yacine Kadi.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team 49th INTC Meeting CERN, 11 February 2015.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
HIE-ISOLDE Project Status Report
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
HIE-ISOLDE Project Status Report
The HIE-ISOLDE Faraday Cup
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team HIE-ISOLDE Physics Coordination WG Meeting CERN, 16 February 2015.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
HIE-ISOLDE Project Status Report 52nd ISOLDE & nTOF Technical Committee meeting February 3rd 2016 Y. Kadi On behalf of the HIE-ISOLDE Project Team.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Installation of the T600 at Fermilab CSN2, September 22,
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
TE-CRG Activities D. Delikaris, TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ELENA installation progress F. Butin / ELENA collaboration.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
S A Griffiths CM42 June 2015 Electrical & Control.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Report Technical Director Storage-Ring-Installation Completed
WP5 Elliptical cavities
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
SPS cryogenic proximity equipment and SM18 validation
Update on HW commissioning
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
RF operation of REX-ISOLDE
HIE-ISOLDE Status Report
HIE-ISOLDE Project Status Report
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-ISOLDE Project: Status Report
Report on HIE-ISOLDE Status
HIE-ISOLDE contribution packages
Prototype cryomodule development
Ideas for REX/HIE-ISOLDE Upgrade
Presentation transcript:

HIE-ISOLDE Project Status Report 50th ISOLDE & nTOF Technical Committee meeting July 1st 2015 Y. Kadi

OUTLINE HIE-ISOLDE Roadmap for 2015 Status of the Technical Systems REX+SC Linac+HEBT Commissioning CM2 Assembly Phase 2 Procurement of CM3 & CM4 3 rd Beam Line + HELIOS integration Conclusions 2

Visit of CERN DG 27/05/2015 Next: Pressure test Transport to ISOLDE Saturday May 2 nd !

Visit of CERN DG 27/05/2015 Many more ! \\cern.ch\dfs\Users\f\formenti\Public\Visit…

HIE ISOLDE roadmap in 2015 physics start 15 Oct. now HW tests starting 19 Feb courtesy W. Venturini, Several mitigation measures to catch up with earlier delays possible (first already adopted: no cold test of CM1 in SM18).

Components to be commissioned 6 XT01 XT02 XT00 CM1 Cryogenics distribution Cryogenics facilities

HW commissioning of XT00 and XT01 3 Steerers still to commission inside tunnel (will be done together with XT02) XT02 campaign starting end of this week courtesy W. Venturini,

HIE ISOLDE Cryomodule 1 8 QP2 (C1.1) QP3 (C1.2) QS4 (C1.3) QS1 (C1.4) QS3 (C1.5) Thermal shield top plate SC solenoid courtesy W. Venturini,

CM 1 main commissioning steps 9 1.Interlock tests 2.Slow pump down 3.RF, Instrumentation, ELQA tests before cool down 4.Low Level RF tests 5.Cool down 6.RF conditioning above Tc 7.RF tests at 4.5 K 8.SC solenoid test 9.Survey and Alignment 10.Heat load measurements 11.Thermal cycles courtesy W. Venturini,

CM1 test planning 10 Ongoing: RF tests at 4.5 K Original planning: 9 weeks + 2 weeks contingency This week: access for installation of LDB1 and SC solenoid test preparation ~ 1 week behind schedule after 5 weeks from start courtesy W. Venturini,

In summary SCRF cavities: all multipacting levels are conditioned All cavities tuned close to Linac frequency: tuning range OK. CAV1-CAV4: no field emission up to 5 MV/m, CAV5 tbc Preliminary measurement of microphonics very encouraging Working out precise calibrations Issue with stability at large (10 Hz) BW: being addressed Delicate steps ahead: solenoid training, unison powering, cold alignment Beam commissioning planning and modus operandi to be worked out in details 11 courtesy W. Venturini,

Commissioning of REX 12 RFQ: RFQ recalibrated Stable at 10 Hz, 1 ms / 40 kW pulses IH structure:  First RF in the structure delayed to wk 27  Recalibration and long RF tests delayed to wk 28 9 GAP structure: Temporary 9gap amplifier stable at 1Hz, 300 us, 45 kW  Final 9gap amplifier scheduled to arrive in week 31. Commissioning will be completed by week 35 7 GAP structures: RF power in 7 gap structures for a short period of time  Recalibration and long RF tests delayed to wk 28 Buncher: Stable at 10 Hz, 1 ms / 1.4 kW pulses Maintenance and refurbishment of amplifiers for RFQ, buncher, IH structure and 7 gap structures completed Remote controls functional Connections to the new HIE-ISOLDE RF reference line completed Courtesy J.A. Rodriguez,

Hardware commissioning: Other systems 13 Courtesy J.A. Rodriguez, Power converters and magnets: New power converters for quads (19 units) fully functional New cooling water circuits for all the quads operational Electrical short in last triplet repaired and triplet refurbished Additional tests and measurements in other quadrupoles completed (thermal switches characterized, temperature rise measured…) Diagnostics: FC, MCP and collimator wheel in REX diagnostics box commissioned  FC and Si detector in first HIE-ISOLDE diagnostics box will be installed and commissioned this week Vacuum: Scheduled maintenance completed. Faulty turbo pumps, controllers and gauges replaced Fast Penning gauges for fast acting valve to protect cryomodule installed  Update/upgrade of the control software scheduled for the winter shutdown Controls: New low level controls functional (new power converters, RF amplifiers…)  High level applications currently being updated (working sets and equipment arrays ready)

Commissioning with beam 14 Commissioning with beam started on week 25 Beam with an A/Q=4.0 has been accelerated to 0.3 MeV/u (RFQ output energy) We have reached the first diagnostic box and commissioned the FC, MCP and collimator wheel Beam transmission through RFQ for different power levels Evaluating the possibility of using quad scans to measure beam properties Beam in FC after RFQ for different collimator aperture sizes (15, 5, 3 and 1 mm) MCP image of the beam after the RFQ Beam transmission thru the RFQ vs RF power for A/Q=4.0 Diagnostics boxes Next steps:  Commissioning of first HIE-ISOLDE diagnostics box once installation is completed (week 27/28)  Phasing of the NC cavities (weeks 28 to 31) Courtesy J.A. Rodriguez,

CM2 15 Next thermal shield assembly Insertion test and vacuum leak test

Phase 2 - Procurement 16 Phase 1Phase 2 Items CM1CM2Order/Job #Supplier/In chargeRemarks Status of the Negotiations CM3CM4 Actual costs (CHF) Actualised costs (CHF)* Cavity/solenoid Frame33,121 CA Kinkele (DE)/TE-MSCOption for CM3 Ordered: DAI# => 13% decrease. Delivery in week 38 28,895 Frame suspension system 29,103 J Rodofil (IT)/EN-MME new offer request week 22 Omega alignment plates Frame adjustment mechanisms101,82644,126NAKirkolm (DK)/TE-MSC Purchased for 3 CM through CATE – KE2021 offer of June 15 => no cost increase25,10950,218 Solenoid adjustment system00NA Optional, to purchase for 4 CM, retrofit on CM1, CM2 pending CM1 tests Helium vessel36,950 CA Cadinox (ES)/TE-MSCOption for CM3 Ordered: DAI# => 14% increase. Delivery in weeks 41 & 44 45,598 Vacuum vessel48,543 CA , CA Cadinox (ES)/TE-MSCOption for CM3 Ordered: DAI# => 33.5% increase, Delivery in weeks 43 & 46 66,792 Vacuum vessel raw material71,500 TE-MSCSupplied to Cadinox for 2 units Ordered EDH EDH (use for CM3 unused material from Phase1) 45,97774,977 Vacuum vessel windows4,824 CA VAQTEC(IT)/TE-VSCPurchased for 3 CMin progress0 Thermal Shield138,722 J , +…Various/EN-MME in progress, new drgs being finalised by TE/MSC (raw material ordered 10 kCHF each). Delivery in week 44 12,200 Thermal shield ancillaries7,443 EN-MME in progress5,151 Vacuum instrumentation cabling/feedthroughs38,874 CA Allectra (GB)/TE-MSC in progress, design changes being implemented. Request for new offer in week 24 Cryogenic and insulation vacuum sensors40,691 CA , CA AMI, TECO (US)/TE-CRG Ordered (DAI# ) => missing LHe gauges 35,968 Flexible elements (bellows+flexibles)11,686 CA Witzenmann (FR)/TE-MSC ordered (CA )6,191 Rigid cryogenic piping35,663 variousEN-MME in progress Cryogenic bayonets5,813 F636/TE/HIECriotec (IT)/TE-CRGpurchased for 6 CM–00 Top plate chimney12,500 variousEN-MME in progress Current leads1,013 CA TECO(USA)/TE-MSCincludes assembly sparesin progress Vacuum burst disks4,249 CA , CA Witzenmann (FR)/TE-VSC purchased for 6 CM, includes 4 spares –00 Cryogenic safety devices1,576 CA CONTEL CONTROL EQUIPMENT (CH)/TE-CRG Purchased for 3 CM, 2 spares to be added in progress Helicoflex seals19,429 CA TE-MSCsupplied for 2 CM, add sparesOrdered (DAI# )4,681 Chimney sub-assembly14,146 variousEN-MME in progress Jacks10,610 EN-MMEsupplied for 6 CM–00 CM Supporting Table4,610 EN-MMEsupplied for 2 CMin progress Miscellaneous (EN-MME produced components, flanges, screws&rivets, Kolsterizing, thermalisation straps, etc.) 91,086 various jobs and orders EN-MME, TE-MSC in progress25,369 TOTALS763,975706,275 Totals301,930356,039 Procurement level40%49%

Phase 2 - Schedule 17 Planning: CM3 assembly in principle starting right after CM2 (provided parts have arrived by then). CM3 + CM4 to be finished towards end 2016 and installed in SD 2016/2017 (Ext. SD). *** If delayed start of CM3 assembly CM4 commissioning will last until mid-April 2017 (just in time for beam to HIE-ISOLDE, with zero margin) *** I I

Phases 1 & 2 + XT03 HEBT: XT01: Miniball XT02: Movable setup + Tilted Foil setup XT03: could be installed by Apr together with CM3 and CM4

Proposal#1: HELIOS on XT02 => cost optimised solution Beam parameters unchanged HELIOS footprint includes magnetic shielding + access to the rear Layout remains TSR compatible 10 M 7 M Phase 2 with HELIOS on XT02 (2017/2018) 2 T 2T

compatible with on XT01 and Miniball in open position 10 M 7 M Phase 2 with HELIOS + TRIuP

Phase 2 with HELIOS on U-Bend Proposal#2: HELIOS on U-Bend Beam parameters unchanged HELIOS footprint includes magnetic shielding + access to the rear => too close to EPC racks Layout remains TSR compatible 10 M

Phase 2 with HELIOS on U-Bend + TRImuP Proposal#2: HELIOS on U-Bend Difficult to fit on XT01 with Miniball in open position and HELIOS in parking position

3D view of HELIOS on XT02

Overall Summary All the project members have been commended by the CERN-DG, ATS Management, HIE-IAP and HIE-SC for the progress achieved so far Machine commissioning is well on track Proposal for 3 rd beam line with HELIOS on XT02 has been endorsed by ISCC. Budget for phase II (CM3 + 4) has been consolidated in MTP FSU for cryomodule assembly; cost increase of components; Included as well in MTP : machine spare parts; consolidation of cryogenic system; Spares for Phase 2 3 rd beam line New EVM Baseline to be launched very soon in order to keep track of Phase 1 + Phase 2 Risk Assessment for Phase 2 has been re-evaluated

Thank you for your attention