MICE/MuCool Coupling Magnets -1- 2010-07-03 ICST/HIT Progress and Schedule for the MICE/MuCool Coupling Coil Project 2010-07-08 HIT MICE CC Project Group.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Teleconf ACS – FREIA 28th March 2017
Study and Development of Large Cryogenic Systems in China
Cryogenic behavior of the cryogenic system
Overview of the RFCC Module and 201-MHz Cavity Design
Spectrometer Solenoid Update
LARP Vertical Test Facility
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

MICE/MuCool Coupling Magnets ICST/HIT Progress and Schedule for the MICE/MuCool Coupling Coil Project HIT MICE CC Project Group – Fengyu Xu Institute of Cryogenics and Superconductivity Technology Harbin Institute of Technology, Harbin, China Presented by Steve Virostek - LBNL

ICST/HIT MICE/MuCool Coupling Magnets Outline Management Plan Funding Situation Vendor’s Production Plan (schedule) MuCool Coupling Coil Status Production Drawing Status Coil-Packaging Procedure (re. welding cover plate) Reforming Extended Cryogenic System for Magnet Training Test WBS for Reforming Extended Cryogenic System Manpower

ICST/HIT MICE/MuCool Coupling Magnets Management Plan A modified MOU between LBNL and ICST/HIT has been drafted (and approved by MICE Executive Board) based on meetings held during a May ‘10 visit to HIT by M. Zisman, D. Li and S. Virostek LBNL will take responsibility for the completion and final approval of the magnet fabrication drawings Prof. Wang Li (now at SINAP) is continuing to provide technical oversight on the project (through LBNL-SINAP collaboration) Engineering help at SINAP to complete the magnet cryostat design and drawings being led by Dr. Lixin YIN HIT is responsible for interface with the fabrication vendor (QiHuan Company) and for completion of the test system (with LBNL help)

ICST/HIT MICE/MuCool Coupling Magnets Funding Situation A contract for fabrication of the MuCool coil was previously placed The contract for 2 sets of MICE coupling coil magnets has been signed with the QiHuan Company (Beijing), totaling 1.94M RMB There has been another 1.10M RMB secured for: −Modification and completion of the test system (contract placed with a company local to HIT) −Powered testing of large test coil −Training of all three cold masses −Contract for cover plate welding

ICST/HIT MICE/MuCool Coupling Magnets Vendor’s Production Plan HIT provides signed production drawings (after approval by LBNL) Vendor fabricate magnet following drawings The vendor has provided the following milestones MuCool  MICE #1  MICE #2  10/17/11  4/18/12  7/26/12 

ICST/HIT MICE/MuCool Coupling Magnets MuCool Coupling Coil Status Cold mass forgings for 3 sets of coupling coils have arrived at the vendor (except for one cover plate forging ring). Superconducting wire, epoxy, and fiber glass cloth to be used for the MuCool coupling coil have been transported to the vendor. The winding system designed by ICST has been re-built at the vendor, and their personnel were trained on the winding procedure last year. The welding scheme for the cold mass cover plate and attachment of the cooling tubes has been established; a contract will be placed by ICST soon. Based on the winding procedure, the vendor is attaching ground insulation plate to the coil bobbin

ICST/HIT MICE/MuCool Coupling Magnets MuCool Coupling Coil Status A finish machined coil cover plate

ICST/HIT MICE/MuCool Coupling Magnets MuCool Coupling Coil Status Coil bobbin ready to mount on winding machine

ICST/HIT MICE/MuCool Coupling Magnets MuCool Coupling Coil Status Curing of the first layer of bottom ground insulation

ICST/HIT MICE/MuCool Coupling Magnets Production Drawing Status The drawings of the cold mass assembly were signed/approved by Fengyu Xu on behalf of Li Wang and sent to the vendor to start the fabrication process. Cold mass drawings are being verified by LBNL by means of an independent 3D CAD model. The 3 cryocooler design is in the calculation/check stage. Li Wang and her three students are working on completing this process. The remaining drawings (cryostat, etc.) are being generated at SINAP (led by Lixin YIN)

ICST/HIT MICE/MuCool Coupling Magnets LBNL will approve the cold mass related fabrication drawings through verification using an independent 3D model LBNL has verified 90% of the coldmass fabrication drawings Verification of the coldmass support drawings are 80% done Verification of the quench protection drawings is ongoing Production Drawing Status – LBNL Progress

ICST/HIT MICE/MuCool Coupling Magnets Coupling Coil Cold Mass Drawing Example

ICST/HIT MICE/MuCool Coupling Magnets LBNL Coupling Coil Cold Mass 3D Model and studying it for any errors and omissions These drawings from Harbin are being used by the QiHuan Company to fabricate the coldmass components LBNL has verified 90% of the fabrication drawings of the cold mass from ICST by creating a 3D model LBNL 3D model created from the Harbin drawings

ICST/HIT MICE/MuCool Coupling Magnets Quench Protection System Drawings Verification of the quench protection system drawings is ongoing at LBNL LBNL is in constant communication with Harbin to resolve any issues with the drawings

ICST/HIT MICE/MuCool Coupling Magnets Coil-Packaging Procedure (related to welding cover plate) The coil-packaging procedure will be submitted to LBNL The key technical point is that a gap will occur between the banding and cover plate ID. First weld the cover plate, then vacuum impregnate epoxy into the gap. Another key technical point is that the deformations after welding aluminum tubes onto the cover plate will affect installation of the cold mass support seats and the positioning accuracy. Cover Plate Banding Coil End Plate Bobbin G10 (3.2mm) G10 (0.8mm) Kapton film The gap will occur after installing cover plate on to the bobbin The cover plate will be installed in this direction

MICE/MuCool Coupling Magnets ICST/HIT Reforming Extended Cryogenic System for Magnet Training Test

ICST/HIT MICE/MuCool Coupling Magnets 1.Simplified flowchart and facilities of extended cryogenic system: replaced thermo-siphon cooling principle from original design with forced two-phase flow. The transfer lines for supply LHe and return GHe will shorten to 5m from about 15m. Cryostat Dewar Cold box

ICST/HIT MICE/MuCool Coupling Magnets 2.There is a disadvantage for the new layout design: the coil is closer to a wall made of reinforced concrete and with a steel support. So, the magnetic forces on the coil, wall and support need to be calculated and the cold mass support system appropriately designed. The magnetic force calculation model

ICST/HIT MICE/MuCool Coupling Magnets 3.Increase minimum inner diameter of the LHe supply tube to DN10mm from the original DN4mm to reduce pressure drop in pipes. 4.Improve power lead design to maintain the temperature of the cold end at 4.2K; moreover, improve its operational stability. 5.The cryogenic insulators will operate at LHe temperature instead of the original large temperature difference at both ends; this will prevent a helium leak due to differential thermal shrinkage. 6.Add a storage tank of 30m 3 to recycle the quench helium gas to reduce magnet training costs. Cryogenic insulators (4) Power leads (2) Air heat exchangers (3) Cryogenic shutoff valve to protect refrigerator system when quenching Recycle valve opened when quenching

ICST/HIT MICE/MuCool Coupling Magnets 7.Add an 80K radiation shield inside the vacuum vessel to reduce the radiation heat leak. 8.Instead of an O-ring seal, fully weld the top flange to increase the seal quality of vacuum vessel; the disadvantage is that the top plate must be removed by cutting when changing coils.

ICST/HIT MICE/MuCool Coupling Magnets 9. System heat loads (at 4.2K) for the MuCool coupling coil training test ComponentsHeat loads (W) current leads0.94 mechanical supports2.77 cryogenic valve1.00 access ports1.59 radiation8.35 transfer line5.24 Total19.88

ICST/HIT MICE/MuCool Coupling Magnets 10. Liquid helium volume for MuCool coupling coil training test ComponentsLHe volume (liter) Cooling tubes and tanks27 Gas-liquid separator16 Transfer lines0.4 Total43.4

ICST/HIT MICE/MuCool Coupling Magnets 11. Budget for reforming the extended cryogenic system No.ItemsQuotation (10 4 RMB)Comments 1Vacuum Chamber (include 3 service tower) Cryogenic valves (include 1 check valve, 1 pneumatic shutoff valve),2 relief valves,3 manual shutoff valves 1.0 3Lhe Tanks (20L,totally 1 entity)0.2 4Power leads(300A,1 pair)2.22 for use 2 for backup 5 Lhe Bayonet ( 2 sets ) 2.2WEKA 6 LN2 Dewar ( 500L,1 set ) 4.0 7Thermal shield (with cooling pipes)1.8 8Cold mass support system (6 sets)1.5 9Thermal shield support system 10 Cryogenic insulator ( 4 pairs ) pairs for use 1 pair for backup 11Lhe transfer line (with vacuum jacket, 10m, 2 lines)1.0 12Air heat exchanger (2 entities)1.0 13MLI material(provided by LBNL) 14Ghe recovery storage tank (30m3,1 entity)6.0 15Final installation and commissioning charges (include labor costs) Total36.3

ICST/HIT MICE/MuCool Coupling Magnets 12. WBS for reforming the extended cryogenic system

ICST/HIT MICE/MuCool Coupling Magnets Manpower Note: A local collaborating vendor can provide other technicians when needed. DescriptionQty.Name Local manager1Fengyu Xu Advanced technical advisor2Haoshu Chen, Canglian Yi Associate professor (cryogenic test system construction and test) 1Anbin Chen Lecturer (mechanical engineer, designer and technician supervisor) 1Xiaokun Liu Mechanical engineer1Kai Song Mechanical technician2Xiyun Yang, Xinhai Yuan Electrical/Winding technician1Deli Wang

ICST/HIT MICE/MuCool Coupling Magnets Summary A modified management plan is being put in place The funding to complete the project is available at HIT Early milestones will be closely monitored by LBNL The design and associated drawings will be completed soon Preparations for winding the MuCool coil are under way ICST has developed a plan to modify the test system