Next Steps in Magnet R&D Steve Gourlay LBNL EuCARD Workshop on a High Energy LHC Malta October 14, 2010.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

E. Todesco DIPOLES FOR HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Bordini, L. Bottura, G. De Rijk, L. Evans, P. Fessia, J.
1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Aug 29, 2006S. Kahn T HTS Solenoid1 A Proposal for a 50 T HTS Solenoid Steve Kahn Muons Inc. August 29, 2006.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
USPAS January 2012, Austin, Texas: Superconducting accelerator magnets Unit 7 AC losses in Superconductors Soren Prestemon and Helene Felice Lawrence Berkeley.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
S. Gourlay 7/19/01 T2 Working Group Summary T2 Working Group Summary Magnet Technology: Permanent Magnets, Superconducting Magnets, Power Supplies Conveners:
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
Status and Highlights of the Applied Superconductivity Center ASC established itself as a fully functioning center within the MagLab Raised $9M.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
The Business of Science ® Page 1 © Oxford Instruments 2012 CONFIDENTIAL Bi-2212 Round Wire Performance Continuous Improvement OST, EUcard2 CERN, June 14,
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Conductor Requirements for Magnet Designers DOE- Conductor Development Program Daniel R. Dietderich Superconducting Magnet Program Office of Science ICFA.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
DOE Review, 7/15/2010GianLuca SabbiMagnet Systems - Progress and Plans Magnet Systems Summary Progress and Plans GianLuca Sabbi DOE Review of the LHC Accelerator.
TQS Overview and recent progress
Development of Nb3Sn (and Bi-2212) strands in preparation for the FCC
Superconducting magnet
Nb3Sn IR Quadrupole Program
MQXF Quench Protection and Meeting Goals
To be presented at Nb3Al R&D Review,
New Magnets for the IR How far are we from the HL-LHC Target?
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Muon Collider SR and IR Magnets
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Review of Quench Limits
Presentation transcript:

Next Steps in Magnet R&D Steve Gourlay LBNL EuCARD Workshop on a High Energy LHC Malta October 14, 2010

Current Status Phase 1 of LARP magnet program close to completion –TQ – technology development and reproducibility surpassed LARP target gradient –LQ –handling, fab, protection of long magnets (~ 4m) achieved 220 T/m Excellent progress so far... 2

Next Phase – Two separate regimes Regime 1 –Up to 17 T Nb 3 Sn – optimistically yields a 15 T bore field Regime 2 –Above 17 T Introduce HTS conductors A quantum leap in technology 3

Technological Readiness Ready to go or minor development still required Not yet demonstrated Need completely new idea/technique Major risk 4

Regime 1 – maximizing Nb 3 Sn Conductor –J c Nearly fully optimized –3,400 A/mm 2 has been achieved. Practical limit is 4,000 A/mm 2 Some non-Cu area fraction is still not used for current transport (the Sn source area), but optimizing this would require a presently not available/known conductor fabrication method –Increase density of pinning sites A factor 10 can increase the critical current around 12 T by a factor of 3.5 to 4, as demonstrated theoretically Don’t know how to do this in wires –D eff Still important, but more so for medium field magnets (<10 T) 5

Regime 1 – maximizing Nb 3 Sn Conductor – cont’d –Strain dependence Poorly understood – need continued R&D Not a show-stopper Bottom-line –Nearly ready to go Should we spend much more effort to raise J c ? 6

Regime 1 – maximizing Nb 3 Sn Preparing for high radiation environment –Current filler matrix contains Boron Need to transition to ceramic –CTD-101 not rad hard Outgassing – catastrophic expansion of matrix –Cyanate Ester (or blend) Need to understand required properties Start with ITER work –Polyimide 7

Regime 1 – maximizing Nb 3 Sn Quench Protection –At 4 m, 14 T peak field, LQ is already a limit of stored energy. Now we want to go to 10 m and 20 T! –Heaters now at 400V/2m. May not want to go higher. What happens if we go to 6, 10,...? –Need more detailed quench calculations/tests Include quench back –Mechanical issues Still see some heater 4.2K. Cycling tests are OK. Thermal cycles seem to be a problem. 8

Heater Delamination 04/27/2010 H. Felice - Collaboration Meeting 14 - FNAL 9 Delamination on coil Inner Diameter Different from “TQ-style” bubbles –larger => only underneath the large sections of the heaters – No conductor exposed – Not clear if bubble underneath stainless steel or only glass sheet => impact on heater performance ? Possible causes: –Superfluid helium + quench (only 2 quenches) TQ –Heat from heaters on ID LQ Coil 6 (showing epoxy “peeling” related to double impregnation, already observed before test)

Regime 1 – maximizing Nb 3 Sn 10 Structure –Field quality – know how to do this –Dynamic range? Assuming higher energy injection –2-in-1 configuration Need to see if this is a viable option for tin magnets

Regime 2 – 17 T and above 11 Conductor –Bi-2212 J e is presently in (almost) leak free wires around A/mm 2 at 4.2 K, ~12 T, a factor of 3 less than NbTi and Nb 3 Sn A factor 3-4 increase in 2212 J e is needed to become competitive with Nb 3 Sn. Without increase, 2212 is a dead end Strain dependence –The reduction of Jc with strain is irreversible in 2212 –the intrinsic strain dependence is possibly reversible, brittle web of interconnected filaments needs to be supported in order to reduce stress concentrations –Potential show-stopper Other technical issues: –leakage, materials compatibility, the reaction of larger coils with sufficient T and O 2 homogeneity, etc. need more R&D

Regime 2 – 17 T and above 12 Conductor (con’t) –YBCO Very high current density but only 1% of the cross-section is YBCO, => J e ~ 250 A/mm 2 comparable with 2212 and available tape insulation methods reduce this by another factor of two Expensive and only available in tape form Lack of filament structure –Can we learn how to use this? –Bi-2223 J e ’s comparable to 2212 and YBCO –Still a tape but has filament structure –Perhaps it deserves a look –Development of HTS conductors in industry is orthogonal to needs of HEP. How do we encourage/fund development?

Regime 2 – 17 T and above High Radiation environment –Is HTS less or more rad hard than Nb 3 Sn? –Same issues as for Regime 1 Quench Protection –Stored energy goes even higher –Hybrid designs - Can we operate in series (and protect) or do we need separate power supplies? Structure –Integration of coils with different materials (maintain small tolerance) Completely different processing for each conductor type –Bring together in low stress configuration (especially 2212) –Size – accept large stray field? Active shielding? 13

Summary 14 Accelerator magnets with peak fields less than 17 T are challenging but clearly feasible –It will require a coordinated community development program Above 17 T requires significant conductor development and engineering –Much R&D to do

Acknowledgements Thanks to... –Paolo Ferracin –Helene Felice –Arno Godeke –Dan Dietderich –Shlomo Caspi... for information and valuable discussions 15