Thortek - Economics of Launch Vehicles - 18 Slides 1 Economics of Launch Vehicles & Two Configurations for Tremendous Cost Reductions AIAA 2009-5399 45.

Slides:



Advertisements
Similar presentations
Simulating Ground Support Capability for NASAs Reusable Launch Vehicle Program Kathryn E. Caggiano Peter L. Jackson John A. Muckstadt Cornell University.
Advertisements

Halil SATIK Industrial Engineering Department, Dokuz Eylul University, Turkey.
1 16TH ECSL SUMMER COURSE ON SPACE LAW AND POLICY September 3rd-14th, 2007 Noordwijk, Wednesday 12th, 15 :30-16 :45 Lecture on : Risk management and insurance.
AKA: The Hybrid Suborbital-Supersonic Aircraft 50 th AIAA-JPC Conference, July 29, 2014 Cleveland, OH All members: Space Propulsion Synergy Team –
GSFC/Wallops Flight Facility 1 Small Satellite Opportunities at Wallops Flight Facility Dr. John Campbell Director, Wallops Flight Facility.
Solid Rocket Boosters Overview Two solid rocket boosters provide the main thrust to lift the Space Shuttle off the pad. They are the largest solid- propellant.
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
Architecture Team Industry Day Briefing 17 January, 2002.
Launch Vehicle International Standards and Best Practices A Report on ISO Standards Proposals offered by China Frederick A. Slane ISO TC20/SC14 US Head.
Welcome to the Aerospace Educator Workshop Saturday, March 8,
How to Fund Manned Lunar Missions with Current NASA Budget 50 th AIAA-JPC Conference, July 29, 2014 Cleveland, OH Douglas G. Thorpe, Co-Founder:
Delta Clipper To Boldly Go…. A presentation by: Jason Moore & Ashraf Shaikh.
Launch & Space Liability Insurance Overview Presentation to COMSTAC
Propulsion Engineering Research Center NASA Technology Roadmap: Launch Propulsion Systems Robert J. Santoro The Propulsion Engineering Research Center.
Aerospace Engineering BY JOE SOMERVILLE. Description  Primary branch of engineering concerned with research, design, development, construction, testing,
A Proposal for Creation of a Reusable Launch Vehicle Fleet for Lockheed Martin Corwin Olson Turner Wright Tim Honker Clint Henry ASE 333T April 29 th,
Commercial Spaceflight Companies Could this be your ticket to space? 200, Amt: Courtesy of Spaceport America Image credit Virgin Galactic.
The Return to Space Exploration Constellation. NASA Authorization Act of 2005 The Administrator shall establish a program to develop a sustained human.
Comprehend why the shuttle was developed Comprehend the space shuttle’s main features Comprehend the shuttle’s legacy The Space Shuttle Program.
International Civil Aviation Organization Colloquium on Environmental Aspects of Aviation Aircraft Noise - The Way Forward Willard Dodds, Chairman ICCAIA.
A3 Altitude Test Facility
Thortek Expander Cycle Engine Presentation - 15 Slides 1 Design of an Expander Cycle Engine with J-2 Equivalent Thrust AIAA th AIAA/ASME/SAE/ASEE.
Business Plan Presentation. Mission “To deliver a revolutionary new energy system by producing a unique pump that makes the most efficient use possible.
Dynamic Design: Launch and Propulsion Genesis Launch Vehicle: The Delta Rocket Student Text Supplement.
The Economic Impact of Commercial Space Transportation on the U.S. Economy May 20, 2004 Paula Trimble Federal Aviation Administration Associate Administrator.
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
The Space Island Project Copyright 2003 The Space Island Group Inc. Developed By: Space Island Group.
Current Need Aging space shuttle fleet’s retirement is imminent If the ISS is going to continue operation there needs to be a replacement to get humans.
2008 Non-Geosynchronous Orbits Commercial Space Transportation Forecast John Sloan Federal Aviation Administration Office of Commercial Space Transportation.
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
Team PM8 Eventus Slide 1. Commercial spaceflight has seen increased activity as more privately owned companies invest in the venture. To avoid a catastrophic.
AST Research and Development Activities COMSTAC Launch Operations and Support Working Group Chuck Larsen October 24, 2006 Federal Aviation Administration.
Infrastructure for Reusable Vehicles The next generation of Space Travel Eric Jensen ASTE 527 Infrastructure for Reusable Vehicles The next generation.
Space Exploration Technologies Corporation Spacex.com Space Exploration Technologies Corporation Spacex.com.
2004 Commercial Space Transportation Forecast for Non-Geosynchronous Orbits (NGSO) John Sloan Federal Aviation Administration Associate Administrator for.
Copyright © 2008 United Launch Alliance, LLC. All rights reserved. Images Courtesy of Lockheed Martin and The Boeing Company O22P1-478 SPACE Transportation.
National Aeronautics and Space Administration Transitioning Toward the Future of Commercial Human Spaceflight COMMERCIAL CREW PROGRAM AIAA Spring Dinner.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
LRO/LCROSS Launch Preview How Where When Presentation for NASA Solar System Ambassadors and Museum Alliance March 20, 2009 Brooke Hsu, LRO E/PO Lead Brian.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
SPACE TECHNOLOGY & APPLICATIONS INTERNATIONAL FORUM (STAIF -98) Conference on Next Generation Launch Vehicles E5 - Cost & Operations A NOVEL METHODOLOGY.
1 AAE 450 Spring 2008 Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site.
Federal Aviation Administration 1 COE CST Overview May 11, 2011 Introduction to the FAA Center of Excellence for Commercial Space Transportation May 11,
Kiyoshi Higuchi Executive Director Japan Aerospace Exploration Agency (JAXA) JAXA Space transportation systems.
Commercial Space Transportation Research and Development Program COMSTAC RLV Working Group Chuck Larsen October 10, 2007 Federal Aviation Administration.
Federal Aviation Administration 1 COE CST Overview Presentation Federal Aviation Administration Introduction to the FAA Center of Excellence for Commercial.
11 Space Transportation Policy and Market Risks Panel 5 – International Customers, Competitors and Partners The George Washington University Elliot School.
THE NEW XS-1 SPACE PLANE CAN INNOVATION GET ANY BETTER?
1 Stan Graves Vice President, Science & Engineering ATK Propulsion Systems March 23 – 24, 2011 NASA Technology Roadmaps.
Roadmap for Long Term Sustainable Space Exploration and Habitation Defining the Functional Requirements for Early Phase of Space Habitation AIAA 2015-????
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
Colorado Center for Astrodynamics Research The University of Colorado 1 Commercial Space in Context Presentation to: ESIL-01.
Hello! I am Ahamath Jalaludeen I am here because I love to give presentations. You can find me at
2005 Commercial Space Transportation Forecast for Non-Geosynchronous Orbits John Sloan Federal Aviation Administration Office of Commercial Space Transportation.
2015 in Spaceflight: A year in review Tal Inbar Head, Space Research Center The Fisher Institute for Air & Space Strategic Studies, Israel.
Preliminary Cost Analysis Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Preliminary Cost Analysis Cost Sources Vehicle-level Costing.
Launch Structure Challenge - Background Humans landed on the moon in 1969 – Apollo 11 space flight. In 2003, NASA started a new program (Ares) to send.
PitchTECH Rocket Pitch Template The following slides are a guide to help you with the presentation of your innovative technology idea. Feel free to incorporate.
Propulsion Economic Considerations for Next Generation Space Launch by Chris Y. Taylor 40th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit.
Know how NASA plans and implements space missions Comprehend the essential components of a space mission Comprehend the selection and training of astronauts.
In Defense of External Tanks
Federal Reserve Bank of Cleveland
Spaceports – Emerging Business Models
Propellant Depot Bernard Kutter United Launch Alliance
Derivation of the FSOA in Ariane 6 Specifications
NASA Technology Roadmaps ATK Commentary
Vice President, Business Development
Terrestrial and Cislunar exploration technologies
GOLD-2 – Anticipating Customer Needs
Presentation transcript:

Thortek - Economics of Launch Vehicles - 18 Slides 1 Economics of Launch Vehicles & Two Configurations for Tremendous Cost Reductions AIAA th AIAA/ASME/SAE/ASEE Joint Propulsion Conference Denver, Colorado Douglas G. Thorpe, Thortek Labs, Inc., Irvine, Kentucky Morehead State University, Space Science Center August 2-5, 2009

Thortek - Economics of Launch Vehicles - 18 Slides 2 Market Forecast For the next 10 years, there will be an average annual demand of 26.7 commercial space launches worldwide for GSO and non-GSO. –According to Federal Aviation Administration’s Office of Commercial Space Transportation (FAA/AST) & Commercial Space Transportation Advisory Committee (COMSTAC) for the period 2009 to Revenues from the 28 commercial launch events in 2008 amounted to an estimated US$1.97 billion or $70.4M each. Many US factories have annual gross sales of >$1B and more than 1,000 employees This may explain why it is so difficult to find investors and government funding in the aerospace community As a result: Future rocket designs must go to extreme measures to reduce development & re-occurring costs.

Thortek - Economics of Launch Vehicles - 18 Slides 3 Mid 1980’s Quote for LRB Project

Thortek - Economics of Launch Vehicles - 18 Slides 4 Liquid Rocket Booster Quote Analysis Mid 1980’s quote 12 Shuttle flights per year for 10 years 24 LRB expended per year 96 engines expended per year Total LRB DDT&E = $3,224M Engine development estimated at $1,483M Engine development cost amortized over 10 years with 7.5% cost of money = $2.2M per engine. Total engine unit cost estimated at $5.4M for each of the LOX/LH2 gas- generator cycle engines Hydraulic TVC unit cost estimated at $700k for each of the 8 TVC’s per booster CONCLUSION: Since little has changed in 20 years, using conventional business practices, engine and steering system costs will always amount to many $Millions regardless of the production rate.

Thortek - Economics of Launch Vehicles - 18 Slides 5 Cost of Access to Space

Thortek - Economics of Launch Vehicles - 18 Slides 6 Space Tourism Reality Much publicity and excitement about space tourism increasing launch demand. Using SpaceX dragon and Falcon 9 as an example: –17,600 lb dragon can carry seven passengers to LEO aboard the Falcon 9. –Falcon 9 launch service alone is $36.75M or $5.25M per passenger or $2,088 per pound. –Even if launch service cost is reduced to 10%, it would be unclear if more than 10 times as many passengers would be able to afford $525,000 just for the launch service plus the cost of riding in the dragon plus the cost of the orbital hotel

Thortek - Economics of Launch Vehicles - 18 Slides 7 OEPSS – Operationally Efficient Propulsion System Study What is OEPSS? OEPSS was a late 80’s study based on lessons learned on operational processing of launch vehicles and their ground support equipment. The goal of the study was to identify vehicle design features that caused the most impact to vehicle processing. OEPSS was conducted by senior technical personnel from NASA, Boeing, and Lockheed –And one new hire/recent college graduate

Thortek - Economics of Launch Vehicles - 18 Slides 8 OEPSS – Operationally Efficient Propulsion System Study 1.Enclosed Compartments 2.LOX tank forward 3.Side Mounted Boosters 4.Hypergolic Systems 5.Hydraulic Systems 6.Pneumatic Systems 7.Pressurization Systems 8.Multiple Propellants The 15 top design concerns delineated in OEPSS 9. Pre-Conditioning 10. Excessive Subcomponent Interfaces 11. High Maintenance Turbopumps 12. Ordnance Systems 13. Retractable Umbilical Carrier Plates 14. Engine Gimbal Systems 15. Ocean Recovery & Refurbishment OEPSS determined that size doesn’t matter in launch vehicle processing costs 3 rd stage Saturn V requires ~ same level of effort as much larger 1 st stage 2-stage launch vehicle requires ~ twice ground processing as single stage

Thortek - Economics of Launch Vehicles - 18 Slides 9 Table #2: Examples of 5 Launch Vehicles

Thortek - Economics of Launch Vehicles - 18 Slides 10 Economic Truths about the Launch Service Industry 1.Minimize development costs by utilizing existing engines and infrastructure. 2.Minimize launch vehicle preparation 3.Minimize re-occurring costs by utilizing existing infrastructure. 4.Utilize LOX/LH2 propellants in order to obtain a larger useful payload to orbit; thereby, spreading the re- occurring costs around a larger customer base. Careful observation of Table #2 and strict adherence to OEPSS will reveal the following economic truths about how to obtain maximum profit in the launch service industry

Thortek - Economics of Launch Vehicles - 18 Slides 11 Proposed Launch Vehicles As of result of the economic truths about the launch service industry, two launch vehicle configurations are proposed. For payloads <30,000 lbs to LEO –Proposed: An air-launched, Single-Rocket-Stage LOX/LH2 vehicle. Heavier payloads require more expensive (per pound) configuration, –Proposed: A vertical launch, single-stage-to-orbit LOX/LH2 vehicle that stages one or more engines.

Thortek - Economics of Launch Vehicles - 18 Slides 12 Response to the 1st Economic Truth Minimize development costs by utilizing existing engines and infrastructure NOTE: Every $100M in development costs (engines, stages, or launch towers) will require payback >$700K per mission if amortized over 10 relatively high rate of 20 missions per year. Use existing engines, hardware, & pads –J-2(x), RL-10, RS-68, Centaur… Launch from factory, if possible –Air Launch Recommendation: US govt. should develop LOX/LH2 engine that costs <$1M each

Thortek - Economics of Launch Vehicles - 18 Slides 13 Response to the 2 nd Economic Truth Minimize Launch Vehicle Preparation According to the processing timeline on one American launch vehicle –25 shifts (19.5% of effort) are required for spacecraft encapsulation; –20 shifts (15.6% of effort) are required to horizontally prep and mate the first two stages; & –83 shifts (65% of effort, 7.5 weeks) are required at the pad on an 18 week processing timeline while utilizing more than 100 touch-laborers In comparison, Ariane V requires 50 total employees (including management) to encapsulate & mate the payload to the vehicle, transport the stack to the pad, and to launch the vehicle all within two weeks! NOTE: A single rocket stage eliminates T-O’s, swing arms, pad access platforms, and pad processing for the second or more stages

Thortek - Economics of Launch Vehicles - 18 Slides 14 Response to the 3 rd Economic Truth Minimize re-occurring costs by utilizing existing infrastructure For an air launch system – the commercial air freighter can placed back in service during times when it is not needed for launch operations. Compare to Sea Launch System - two dedicated ships can not be utilized for any other money generating ventures between missions. Recommendation: US govt. should –develop heavy-lift aircraft modified for air launch operations and –develop other facilities to be used by commercial ventures that would pay tolls for their use.

Thortek - Economics of Launch Vehicles - 18 Slides 15 Air Transporters Comparison List of world’s largest air transporters is shown in Table #4 below. Although the F doesn’t have the largest payload capacity, more have been built (and nearing retirement). Therefore, used F may be cheaper than AN-124.

Thortek - Economics of Launch Vehicles - 18 Slides 16 Table #3: Comparisons between Launch Configurations Response to the 4th Economic Truth Utilize LOX/LH2 propellants in order to obtain a larger useful payload to orbit

Thortek - Economics of Launch Vehicles - 18 Slides 17 The Space Tug Payload capacity to GTO is only ~52% of LEO. Going from GTO to GSO further reduces launch vehicle capacity by 76%. Also, three GN&C (Guidance, Navigation, & Control) systems are utilized to place a payload into its precise orbit. –Price of GN&C systems vary with precision from $250K to $2.5M each What is needed: A space tug that could autonomously rendezvous with payloads in LEO and transport same to higher orbits Benefit #1: Launch vehicle would increase payload capacity to GSO by 2.5 times Benefit #2: Price of GN&C for launch vehicle would reduce by ~$6.75M Recommendation: US govt. should develop a non-chemical, in-orbit transportation system Candidates include: : electro-static, electro-magnetic, and electro- dynamic tethers with plasma contactors

Thortek - Economics of Launch Vehicles - 18 Slides 18 Conclusion We compared economic vitality of 5 launch systems We presented 5 methods of reducing launch service costs –Most important for launch provider is minimize development costs We proposed two launch systems that should address the 4 economic truths –A LOX/LH2 Single-Rocket-Stage air-launch system –A LOX/LH2 single-stage-to-orbit system US Government should support the entire US aerospace industry, not mission specific tech (I.e., SSME, J-2X). This can be accomplished by the following 4 recommendations: –Develop LOX/LH2 engine that costs <$1M each. –Develop heavy-lift aircraft modified for air launch operations –Develop common launch facilities to be used by commercial ventures that would pay tolls for their use –Develop a non-chemical, in-orbit transportation system