Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.

Slides:



Advertisements
Similar presentations
Heating, Ventilating, and Air-Conditioning
Advertisements

Make the most of your energy Head Office – Case Study.
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Lecture Objectives: Final discussion about HW3 Introduce more final project topics Continue with HVAC Systems.
Grundfos FLOW THINKING Air conditioning the Grundfos Way.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
N O R T H A M E R I C A C O M M E R C I A L TDP
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
IMPROVING COOLING SYSTEM EFFICIENCY WITH PRE-COOLING AJ Schutte 15 August 2012.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
Cooling System Solutions
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Energy Savings in CERN’s Main Data Centre
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
N-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Update on the PSB Cooling and Ventilation Systems
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Demineralised water cooling system
EN-CV activities for LHC during LS2
The Data Center Challenge
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Lecture Objectives: Discuss Final Project
CERN Data Centre ‘Building 513 on the Meyrin Site’
BUILDING HEATING AND COOLING
Budget specification EHN1 Extension: Infrastructure (WG2)
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Cooling systems for HL-LHC (WP17.3)
CEDAR Detector Ventilation System Review
EN-CV interventions during EYETS for PS and PSB
COOLING & VENTILATION INFRASTRUCTURE
Lecture Objectives: Answer questions related to HW 4
ATLAS Thermosiphon Electrical Distribution and Run Modes
East Area Cooling & Ventilation Status
EN-CV: P8 systems and Detector Cooling
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Biobehavioral Health Building, University Park, PA
Lecture Objectives: Discuss HW4 parts
Maintenance at ALBA facility: Strategy for the conventional services
Objectives Finalize AHU processes
Aziz AMAMOU EACM – 21th May 2019
East Area Renovation Supply of control rooms b.157
Objectives Processes in Cooling towers and AHUs.
n_TOF Target #3 Baseline Design
Jerzy KWIATKOWSKI, Jerzy SOWA, Andrzej WISZNIEWSKI
Presentation transcript:

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT

Engineering Department EN Cooling and Ventilation issues  Objectives  Ventilation  Cooling  Conclusion

Engineering Department EN Objectives Ventilation :  Upgrade of the existing HVAC system for the next 25 years  Installation of air conditioning system for the primary zones Cooling :  Separation of the cooling circuit for the primary zones

Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years HVAC existing system : Main Building : heating system connected to the overheated water network  Distribution network  8 Air Handling Units : 560 kW m 3 /h  Radiant panels :625 kW Ratio : 0,39 W/m 3 *K (SIA 380 standard : Ratio : 0,06 W/m 3 *K) Barracks and Offices :  9 split system :45 kW

Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years HVAC existing system :

Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years HVAC existing system :

Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years Situation actuelle Augmentation Actuel/Origine Situation d'origine LocalTypeElément Déperd. [W] Déperd. [%] LocalTypeElément Déperd. [W] Déperd. [%] Hall %59% Hall % Transmission %42%61% Transmission % Mur en béton %0% Mur en béton % Vitrage simple fixe %0% Vitrage simple fixe % Durisol %0% Durisol % Durisol pignon %0% Durisol pignon % Eternit %10%347% Eternit % Toiture % 164% Toiture % Pont thermique9 2861%0% Pont thermique9 2861% Renouve llement d'air %17%55% Renouve llement d'air % Renouvellement %0% Renouvellement % Perméabilité %17%150% Perméabilité % Heat deperditions : calculation notes

Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years Proposed solution :  keep the existing configuration  replace :  the 8 AHU  the overheated distribution network  the electrical installation  the instrumentation and PLC  the barracks HVAC system  upgrade the inslulation and the tightness of the building (GS issues)

Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years Proposed solution, Cost estimation : Ventilation : Upgrade of the existing HVAC system Uni t Quantit y Unit Price Ratio/A HU Total Price [CHF] Contengencies 5% AIR HANDLING AIR HANDLING UNITS AHU Hallass AHU Barrackass AHU Officeass Extracteurass AIR DUCTS AHU Hallass AHU Barrackass ELECTRICITY AND REGULATION20% INSTRUMENTATION10% DESIGN DOCUMENTATION TEST OVERHEATED WATER NETWORK PIPING + ACCESSORIES + PUMPS SAFETY 3. RADIANT PANNEL ELECTRICITY AND REGULATION DEMINERALISED WATER NETWORK ACCESSORIES

Engineering Department EN Ventilation : Installation of air conditioning system for the primary zones No existing system Proposed solution : similar to nTOF target zone Primary zone in underpressure HVAC system including safety filtration on air ectraction Cost estimation :260 kCHF Key point : Air tightness of the primary zone (GS improvement)

Engineering Department EN Cooling : Separation of the cooling circuit for the primary zones RP requirement : avoid contamination of external demineralised water network User requirement : maintain the existing inlet temperature head loads : 700 kW

Engineering Department EN Cooling : Separation of the cooling circuit for the primary zones Proposed solution : Installation of a dedicated demineralised water cooling system for the primary zones including 2 cooling towers Cost estimation :1.300 kCHF including civil works

Engineering Department EN Cooling and Ventilation issues Conclusion Cost estimation : Upgrade of the existing HVAC system 985 kCHF Installation of air conditioning system for the primary zones 260 kCHF Separation of the cooling circuit for the primary zones1.300 kCHF Manpower :1,25 FTE over 12 months Related points : Building infrastructure improvement Barracks refurbishment

Engineering Department EN Cooling and Ventilation issues Thank you for your attention