Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT
Engineering Department EN Cooling and Ventilation issues Objectives Ventilation Cooling Conclusion
Engineering Department EN Objectives Ventilation : Upgrade of the existing HVAC system for the next 25 years Installation of air conditioning system for the primary zones Cooling : Separation of the cooling circuit for the primary zones
Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years HVAC existing system : Main Building : heating system connected to the overheated water network Distribution network 8 Air Handling Units : 560 kW m 3 /h Radiant panels :625 kW Ratio : 0,39 W/m 3 *K (SIA 380 standard : Ratio : 0,06 W/m 3 *K) Barracks and Offices : 9 split system :45 kW
Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years HVAC existing system :
Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years HVAC existing system :
Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years Situation actuelle Augmentation Actuel/Origine Situation d'origine LocalTypeElément Déperd. [W] Déperd. [%] LocalTypeElément Déperd. [W] Déperd. [%] Hall %59% Hall % Transmission %42%61% Transmission % Mur en béton %0% Mur en béton % Vitrage simple fixe %0% Vitrage simple fixe % Durisol %0% Durisol % Durisol pignon %0% Durisol pignon % Eternit %10%347% Eternit % Toiture % 164% Toiture % Pont thermique9 2861%0% Pont thermique9 2861% Renouve llement d'air %17%55% Renouve llement d'air % Renouvellement %0% Renouvellement % Perméabilité %17%150% Perméabilité % Heat deperditions : calculation notes
Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years Proposed solution : keep the existing configuration replace : the 8 AHU the overheated distribution network the electrical installation the instrumentation and PLC the barracks HVAC system upgrade the inslulation and the tightness of the building (GS issues)
Engineering Department EN Ventilation : Upgrade of the existing HVAC system for the next 25 years Proposed solution, Cost estimation : Ventilation : Upgrade of the existing HVAC system Uni t Quantit y Unit Price Ratio/A HU Total Price [CHF] Contengencies 5% AIR HANDLING AIR HANDLING UNITS AHU Hallass AHU Barrackass AHU Officeass Extracteurass AIR DUCTS AHU Hallass AHU Barrackass ELECTRICITY AND REGULATION20% INSTRUMENTATION10% DESIGN DOCUMENTATION TEST OVERHEATED WATER NETWORK PIPING + ACCESSORIES + PUMPS SAFETY 3. RADIANT PANNEL ELECTRICITY AND REGULATION DEMINERALISED WATER NETWORK ACCESSORIES
Engineering Department EN Ventilation : Installation of air conditioning system for the primary zones No existing system Proposed solution : similar to nTOF target zone Primary zone in underpressure HVAC system including safety filtration on air ectraction Cost estimation :260 kCHF Key point : Air tightness of the primary zone (GS improvement)
Engineering Department EN Cooling : Separation of the cooling circuit for the primary zones RP requirement : avoid contamination of external demineralised water network User requirement : maintain the existing inlet temperature head loads : 700 kW
Engineering Department EN Cooling : Separation of the cooling circuit for the primary zones Proposed solution : Installation of a dedicated demineralised water cooling system for the primary zones including 2 cooling towers Cost estimation :1.300 kCHF including civil works
Engineering Department EN Cooling and Ventilation issues Conclusion Cost estimation : Upgrade of the existing HVAC system 985 kCHF Installation of air conditioning system for the primary zones 260 kCHF Separation of the cooling circuit for the primary zones1.300 kCHF Manpower :1,25 FTE over 12 months Related points : Building infrastructure improvement Barracks refurbishment
Engineering Department EN Cooling and Ventilation issues Thank you for your attention