GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept. 15-18 2003 1 GLAST-LAT International Collaboration Meeting Roma,

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
GLAST LAT Project Gamma-ray Large Area Space Telescope Status of the EM Thermal Tests GLAST Large Area Telescope: GLAST Large Area Telescope: Tracker Subsystem.
The Gamma-ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE The GLAST LAT Silicon Strip Tracker-Converter.
GLAST LAT ProjectGSFC, October 2003 LAT-PR-0XXXX 1 Gamma-ray Large Area Space Telescope Status of the EM Vib Tests GLAST Large Area Telescope: GLAST Large.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
Gamma-ray Large Area Space Telescope IEEE Nuclear Science Symposium Wyndham El Conquistador Resort, Puerto Rico October , 2005 The Gamma Ray Large.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectPeer Review, March 24-25, E2 1 Gamma-ray Large Area Space Telescope 7E2: EM test plans GLAST Large Area Telescope: GLAST Large Area.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST Large Area Telescope:
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
The Gamma-ray Large Area Space Telescope: The GLAST LAT Silicon Strip Tracker-Converter Robert P. Johnson, U.C. Santa Cruz and the Santa Cruz Institute.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
GLAST:Gamma Ray Large Area Telescope
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLASTGLAST Vertex 2003 September 15-19, 2003 Alessandro Brez – INFN Pisa 1 GLAST - an Astro-Particle Mission to Explore the High Energy Gamma Ray Sky Alessandro.
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
Update on Pavia MM mechanical prototype
Mini-Tower test results
GLAST LAT tracker signal simulation and trigger timing study
Investigation on tray MID 063 Back
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4
Presentation transcript:

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma, Sept Overview of the Italian Activities Ronaldo Bellazzini INFN Pisa Italian Project Manager

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-Italia Collaboration Observers and theorists: 35 astrophysicists belonging to various Institutions (IAS, ASI, Arcetri, Brera, Bologna, Torino, and several Universities) Technical collaboration with: Dipartimento di Ingegneria Aerospaziale (Univ. Pisa) Dipartimento di Ingegneria dei Materiali (Univ. Perugia) Sezioni INFN F.T.ETot. Bari Perugia78 Pisa8.213 Roma24.48 Trieste5.312 Padova2.96 Totale INFN contribution:

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept ASI-INFN contribution to the LAT “The funding of the Italian contributions to the LAT instrument project will be equally shared by INFN and ASI. The scientific and technical responsibility of the Italian effort in the construction of the LAT will be of INFN...” From DRAFT MoA SLAC-INFN-ASI ASI has definitively approved GLAST and its financial budget for construction: 4.5 M€ for M€ for 2004 On going discussions between ASI and INFN to find the most effective way to spend this money.

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept INFN Financial budget (in Mliras) YearsEquipmentConstructionConsumables Ext. travels Int. travels Tot

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept TKR Flight-Tower Design & Assembly Cable Plant UCSC Tower Structure (walls, fasteners) Engineering: SLAC, Hytec Procurement: SLAC. Italy SSD Procurement, Testing Japan, Italy, SLAC Electronics Design, Fabrication & Test UCSC, SLAC Tower Assembly and Test Italy (18) Tray Assembly and Test Italy SSD Ladder Assembly Italy Composite Panel & Converters Engineering: SLAC, Hytec, and Italy Procurement: Italy ,

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept On-going activities on hardware side  Acceptance and tests of sensors  Ladders production and tests  Ladders assembly onto trays  Tests of stacked trays with cosmics  EM construction and tests

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept SSD Electrical Test Rate SSD in Italy9452 enough for 16 towers SSD tested7373 SSD to review201 SSD rejected44 Cumulative test rate

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept SSD Electrical Properties Specification: leakage current <500 nA at 25  C and 150 V

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Ladders Production Manual fast AND precise method 24 ladder assembly tools used in parallel Very good ladder alignment obtained Ladder assembly tool 50 ladders EM 470 flight ladders: 370 produced in G&A 100 produced in MIPOT G&A

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Ladders Electrical Tests Electrical test results: 1.Ladder tested513 2.Accepted501(98%) 3.Broken edge 6 4.High current 6 (>2  The cause of problem 3 has been corrected.

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Ladders Electrical Tests Depletion voltage Leakage current at 150 V

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Reference wall Upper plate Tray Skin Lower plate Tray assembly tool Tungsten assembly tool Kapton assembly tool Trimming tool Tray assembly tools toolIn houseUnder constructio n total assembly tool 347 Tungsten tool 213 Kapton tool 112 Trimming tool 101 Tray assembly rate capability: 3 trays/day

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept The tools Jig of ladders alignment Ladders vacuum kept on the bridges Jig of tray alignment Reference dowels Alignment micrometers C.M.M. with touch head and optical head All the assembly operations under C.M.M. Glue spots deposition with automatic dispenser Microbonding with automatic wedge bonder

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Assembly phases Tray positioning Ladder positioning Microbonding 1 assembly chain ready 5 assembly chains in construction Max assembly rate : 15 trays/week Foreseen assembly rate: 10 trays/week

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Tray assembly results  =14  m Planarity Requirements: Alignment error < 50  m Planarity 100  m The tray assembly has been successfully tested: the alignment and planarity of the ladders are in specification with possible improvements. The number of tools in production will allow an assembly rate of 40 trays/month (2 towers/month) that well matches with the test rate of the trays and towers.

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Mini-Tower Assembly & Test (Aluminum grid fixture is removed)

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Cosmic Rays – Online DATA The trigger occurs when particles traverse the 6 consecutive layers of the MiniTower.

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Detection Efficiency

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Integration of MiniTKR and CAL at SLAC Courtesy of I&T team

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Assembly of EM Tower in G&A Trays alignment on assembly jig Geometrical tolerances well within limits (0.3 mm). Cabling

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Tray vib set up Centrotecnica set up: - 1 LDS V864LT shake table - 2 fixtures - 9 read out channels - 4 trays/day test rate capability W side on the top FEM prediction=610Hz Normal modes search results 1 = 626 Hz Q  34 Random vibration spectrum response (acceptance level)

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Bare Panel: N.D.I. Test Honeycomb – Skin debonding ESPI: Thermal Loads very effective to detect bare panel defects Honeycomb crash Skin-closeout debonding

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept TG07: Bare Panel + W + Bias Plane ESPI: Vibration TEST 817Hz first resonance mode 1860Hz second resonance mode

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Qualification-like test: temperature range: -30°C  +50°C T 0 = 24°C number of cycles: °C, +50 °C (dT/dt) = 0.5 °C/min Temperature (°C)  L/L (m  )  T=25 °C:  L/L  100   T=-55 °C:  L/L   Trays Thermal qualification cycles Thermal test lot ≥ 4 trays/cycle in 4 climatic chambers (2 ready by Pg in Terni, 1 foreseen in Pi, 1 foreseen in Ba) Test rate/climatic chamber ∼ 1 tower/month

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept SEE test at Legnaro Ion beam Irradiation facility set-up Chip lay-out

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept SEE test results

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept I – Tracking (reconstruction and vertexing) IV - GLAST simulation V - Construction and test software II - Detector description VI – Science analysis III - Event display and graphics Detector software - main areas of collaborations: Software activity of the Italian Collaboration

GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept Conclusions The GLAST italian Collaboration is actively preparing itself to start construction of flight units and to exploit the GLAST science. 82% of SSDs already procured (Italy+SLAC+Japan) 64% of SSDs already tested and accepted 500 flight ladders already produced, tested and accepted 1350 flight ladders in production (2/3 total) 200 flight trays in production (50% of total) 21 EM trays already produced, mechanically and vib tested 5 live trays produced and electrically tested EM live tracker MiniTower assembled and tested EM mechanical tracker Tower assembled and ready to be tested Large software and science preparation effort on going (see A. DeAngelis presentation) this presentation at (conference reports & talks)