Radiation 4-5 December 2005 AB/BDI/BL.

Slides:



Advertisements
Similar presentations
IEEE10/NSS R. Kass N A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State.
Advertisements

ESODAC Study for a new ESO Detector Array Controller.
J.Ye / SMU May 18, 2015 GOL + SoS R & D Work at SMU 1.The Test of the GOL chip. 2.First test on the SoS driver chip and the submission of a dedicated test.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
P07301 Summary Data Acquisition Module. Team Members.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
COMPONENT TEST H4IRRAD 15 TH NOVEMBER 2011 G. Spiezia, P. Peronnard, G. Foucard, S. Danzeca, P. Gander, E. Fadakis (EN/STI/ECE)
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Irradiation Test of the Omegapix2 Digital Tier May 18-22, 2015, CERN Olivier Le Dortz, LPNHE Paris Juin 2015.
FIPDiag PSI Radiation test Presentation Radwg meeting August 2011 Julien Palluel BE/CO/FE 1 1.Devices Under test 2.Description of the test setup 3.Beam.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
P. Denes Page 1 FPPA-Rad1 UHF1x and FPPA Radiation Hardness Radiation studies performed at OPTIS (PSI) with 72 MeV p and at 88” (LBL) with 55 MeV.
CMS Upgrade Workshop – Nov 20, H C A L Upgrade Workshop CMS HCAL Working Group FE Electronics: New QIE Nov 20, 2007 People interested in QIE10 development:
Apr, 2014 TE-EPC-CCE Radiation Tests
CALIBRATION OF TEVATRON IONIZATION PROFILE MONITOR (IPM) FRONT END (FE) MODULES Moronkeji Bandele Physics and Engineering Department Benedict College,
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
External Modulator. When data rates were in the low gigabit range and transmission distances were less than 100 km or so, most fiber optic transmitters.
Station Board Testing EVLA Correlator S/W F2F 3-4 April 2006 D. Fort.
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
TRIUMF and ISIS Test Facilities Radiation 2 Electronics (R2E) LHC Activities TRIUMF and ISIS test facilities Rubén García Alía, Salvatore Danzeca, Adam.
Progress report of new PHENIX pilot chip Hiroyuki Kano (RIKEN) 1. Overview 2. Digital pilot ASIC and test board 3. Functionalities and test result 4. GOL.
DAQMB Status – Onward to Production! S. Durkin, J. Gu, B. Bylsma, J. Gilmore,T.Y. Ling DAQ Motherboard (DMB) Initiates FE digitization and readout Receives.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
Machine Protection WG 28 May 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations of Digital Parts. LHC Machine Protection WG meeting.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
Standard electronics for CLIC module. Sébastien Vilalte CTC
March 14, 2016 Report on SMU R&D work1 Link-On-Chip (LOC) 1st Prototype  Status:  Prototype chip with the clock unit (PLL), serializer, laser driver,
LHC Radiation Day, B. Dehning1 Beam Loss Monitors B. Dehning.
Mircea Bogdan Chicago, Oct. 09, BIT, 500 MHz ADC Module for the KOTO Experiment The University of Chicago.
1 Single event upset test of the voltage limiter for the ATLAS Semiconductor tracker TSL Experiment Number: F151 distance between power supplies and modules.
0808/0809 ADC. Block Diagram ADC ADC0808/ADC Bit μP Compatible A/D Converters with 8-Channel Multiplexer The 8-bit A/D converter uses successive.
Mitglied der Helmholtz-Gemeinschaft Hardware characterization of ADC based DAQ-System for PANDA STT A. Erven, L. Jokhovets, P.Kulessa, H.Ohm,
Actel Antifuse FPGA Information – Radiation Tests Actel Antifuse FPGA – A54SX72A 72K gates 208 pqfp package 2.5v to 5.0v I/O tolerant $62 each for tested.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
12 April 2005 Christos Zamantzas 1 LHC Beam Loss Monitor Realisation LHC Machine Protection System Review.
Radiation hardness of the 1550 nm edge emitting laser for the optical links of the CDF silicon tracker S. Hou 15-Jun-2004.
LHCb Outer Tracker Electronics 40MHz Upgrade
CALICE Readout Board Front End FPGA
2007 IEEE Nuclear Science Symposium (NSS)
Next generation rad-hard links
Irradiation test results for SAMPA MPW1 and plans for MPW2 irradiation tests Sohail Musa Mahmood
Iwaki System Readout Board User’s Guide
CSC EMU Muon Port Card (MPC)
Børge Svane Nielsen/JJG
University of California Los Angeles
PCM (Pulse Code Modulation)
PSI test REPORT MARCH 2011 G. Spiezia, P. Peronnard (EN/STI/ECE)
University of California Los Angeles
LHC BLM system: system overview
Irradiation Test of the Spartan-6 Muon Port Card Mezzanine
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
ATLAS Tile Calorimeter Interface The 8th Workshop on Electronics for LHC Experiments, Colmar, 9-13 September 2002 K. Anderson, A. Gupta, J. Pilcher, H.Sanders,
BEAM LOSS MONITORS DEPENDABILITY
LHC Beam Loss Monitoring System
Optical links in the 25ns test beam
University of California Los Angeles
Components of a Computer System
Motor (rotor in vacuum)
Presentation transcript:

Radiation 4-5 December 2005 AB/BDI/BL

Irradiation setup for the CFC board at PSI Front view Rear view

Measurements goals 1. Digital to analog converter Check the functionality of the DAC after 500 Gray irradiation. 2. Gigabit Optical Link Check the optical margin and the eye diagram of the GOH (GOL + Laser) during irradiation until 500 Gray. 3. FPGA Check the SEU and functionality of the FPGA during irradiation until 500 Gray.

DAC measurements FPGA DAC Beam position ANALOG ADC Measure DAC 1 Energy : [MeV] Run time : 4576 [sec] Fluence : 9.711e+11 [p/cm2] Dose : 4.913e+04 [rad] Flux : 2.122e+08 [p/cm2/sec] Doserate : 1.074e+01 [rad/sec] Measure DAC 2 Energy : [MeV] Run time : 4376 [sec] Fluence : 9.713e+11 [p/cm2] Dose : 4.914e+04 [rad] Flux : 2.220e+08 [p/cm2/sec] Doserate : 1.123e+01 [rad/sec]

DAC measurements

Measure 1 Beam on the Digital to Analog (DAC) converter of the Board 2 CH1-4 : Work only when beam is off CH5 : Work correctly Display of the ADC slope for the CH1 & CH5. Indirect way of looking at the DAC output. The DAC give additional current to the inputs. The DAC was not working after the 500 Gray irradiation. Try to estimate the time when the component died. Slow shift of the input current (the slope increase, what the sign of the current)

Measure 3 Beam on the Digital to Analog (DAC) converter of the Board 3 Display of the ADC slope for the CH7 & CH8. Indirect way of looking at the DAC output. The DAC give additional current to the inputs. The DAC was working after the 500 Gray irradiation. Slow shift of the input current due to irradiation?

Comparison DAC Measure1 & Measure 3

Measure 2 Beam on the optical transmitter module (GOH) on the Board 3 FPGA DAC ANALOG ADC GOH FibreA GOH FibreA Beam position Energy : [MeV] Run time : 4341 [sec] Fluence : 9.712e+11 [p/cm2] Dose : 4.914e+04 [rad] Flux : 2.237e+08 [p/cm2/sec] Doserate : 1.132e+01 [rad/sec]

Measure 2 Beam on the optical transmitter module (GOH) on the Board 3

The fiber B has been attenuated in order to check the optical margin. The fiber A gave some CRC when the fiber B was loosing signal. Link between ERRA and ERRB but not between LostFrameB and ERRA

Measure 2 Beam on the optical transmitter module (GOH) on the Board 3 Eye diagram before and after radiation

Measure 4 Beam on the FPGA of the Board 3 FPGA DAC ANALOG ADC GOH FibreA GOH FibreA Beam position Energy : [MeV] Run time : 4488 [sec] Fluence : 9.712e+11 [p/cm2] Dose : 4.914e+04 [rad] Flux : 2.164e+08 [p/cm2/sec] Doserate : 1.095e+01 [rad/sec]

Measure 4 Beam on the FPGA of the Board 3 Histogram of the 8 outputs of the “maximum of the running sums”, 40  s. In case of SEU, the results would show a dispersion in the whole range (0 to 200 counts).

Measure 4 Beam on the FPGA of the Board 3 The card didn’t send any corrupted frame until the end of the irradiation (491 Gray)