Cerrillos Hills Cell Tower Team Three: Sabrina Flores, Angela Wetz, Jane Sanderford, Bridget Clayton, Brenda Warner, and Jon Jasper Field Manager: Steve.

Slides:



Advertisements
Similar presentations
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
Advertisements

Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
Cottonwood Wash Abandoned Mine Reclamation Project: A Partnership in Watershed Reclamation.
June 5, 2007 BCC Called Public Hearing on BZA #SE , April 5, 2007 APPLICANT: Genesis Communications, Inc.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Simulation of Deerfield Wind Project, Vermont (4 miles) Simulation by Northeast Wind.
Regional View Ballona Creek Watershed December 19, 2003 Area A & part of Area B (192 acres total) purchased for $139 million (Prop 50 funds) Area B.
Goodsprings Field Office October 30 th  250 “Small” (250ft tall) wind towers  Total height including blades approx. 350ft  Associated Facilities.
Proposed Amendment to the Yuma Field Office Resource Management Plan Public Scoping Meetings Monday, April 18, 2011, 6 – 8 p.m. Yuma BLM Field Office 2555.
Floyd County Public Meeting Amendment to the County Comprehensive Plan and Zoning Ordinance for New Albany Township Area.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
June 19, 2015 (Photo: Whistle Creek LWC). Meeting Agenda  10:00 Welcome; County Commissioners and Conservation District Supervisors and Staff, Ecosystem.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management May 2006.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
Master Development Plans (MDPs) Oil and Gas Projects.
January 29, 2008 BCC Called Public Hearing on BZA # SE , 12/6/07 APPLICANT: Ganesh Bansrupan.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Joe Vieira Project Manager BLM Colorado Renewable Energy Team 6/28/2011.
Visual Resource Management May 2015 Lander, Wyoming.
Table Mountain Wind Proposal Jean Field Office. Project Information Proponent: Table Mountain Wind Co., LLC Project Specifics: ROW grant to use BLM administered.
2012 Alton, Texas.  CENTENNIAL PLAZA is a Mixed Use development located on 5 Mile line / Trenton, in the west area of McAllen Area within the City of.
Unit 15B Class Project Class Project. Objective Using the tools, techniques, and practices covered so far, work in an ID team setting to evaluate a project.
Roan Plateau Proposed Plan Garfield County Energy Advisory Board Oct. 5, 2006.
Visual Resource Management May 2015 Lander, Wyoming.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006.
The Lower San Pedro Valley and Aravaipa: Worthy of Protection.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Course Wrap Up UNIT 16. Overall Course Objective Having participated in the course, you should be able to: Describe the basic principles and concepts.
1 Project Analysis and Evaluation UNIT 10 – Project Analysis and Evaluation.
Real Estate is Great at Judge Fite. FOR SALE 281 Acres on Highway 380 Greenville, TX Perfect for almost any development – commercial, warehousing or residential.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Goleta Against Drilling (GAD-NO): A group of concerned citizens in Goleta working to protect the environment from the adverse effects of the Southern California.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Introduction Part 1 U.S. Department of the Interior Bureau of Land Management May 2006.
Tortilla Flats Substation and Power Line September 28, 2007.
Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
The Crummer Bluff Mansions
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
The NRC’s Generic Environmental Impact Statement & What We Can Do About It.
OKA+ Schools Partnership with Southern Nazarene University and Santa Fe South High School.
Bureau of Land Management: Identifying Land with Wilderness Characteristics By: Heather Evans.
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
R E N O V U S. S O L A R Town of Catlin Community Solar Farm May 12, 2016 Jon McNamara.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
CITY OF STOCKTON CITY COUNCIL AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: a) FEIR/IS Final Environmental.
Environmental Protection Division January 29, 2013 BCC Public Hearing Solid Waste Management Facility Permit Renewal Request Hubbard Construction Company.
Works of Art: Redeveloping Properties for Cultural Reuse Harvester Artspace Lofts Council Bluffs, Iowa Tina Hochwender – City of Council Bluffs.
Public Works Infrastructure Update Public Works Department April 5, 2016.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
Washoe County Board of Adjustment
South Fork American River Cohesive Strategy Project
The I-465 West Leg Reconstruction Project
Jefferson County Planning Commission Hearing April 10, 2013
An Alternative to Skyline Blight
WVAR Sierra RV S. Virginia Street (old 395 S)
Mountain Avenue West Recharge Basin Project
Municipal Services Feasibility Study Millcreek City, Utah
Council Rock High School South
Fort Worth Alliance Airport Runway Extension/
Annette M. Wells Associate Business Administrator January 29, 2015
Washoe County Board of Adjustment June 6, 2019
EAST MESABI JOINT WATER SYSTEM A JOINT VENTURE BETWEEN THE east range communities REQUEST A $6 million request for State Funding in 2019 to build a comprehensive.
Presentation transcript:

Cerrillos Hills Cell Tower Team Three: Sabrina Flores, Angela Wetz, Jane Sanderford, Bridget Clayton, Brenda Warner, and Jon Jasper Field Manager: Steve Fostberg Applicant: “Digital” Dave Grand from Grand Central Cell (GCC)

GCC Proposed Project 130’ self supporting lattice tower w/non glaring metallic finish supported on concrete pad 130’ self supporting lattice tower w/non glaring metallic finish supported on concrete pad 75 x 75 foot fenced compound on 5 acres of Bureau of Land Management leased area 75 x 75 foot fenced compound on 5 acres of Bureau of Land Management leased area 1.5 miles x 25’ new access road 1.5 miles x 25’ new access road

Proposed Project Area 20 miles southwest of Santa Fe, NM 20 miles southwest of Santa Fe, NM

Background VRM Class III VRM Class III Cerrillos Historic Mining District Cerrillos Historic Mining District Nominated as a scenic vista by Santa Fe County Nominated as a scenic vista by Santa Fe County Endangered bat roosts in old mine adits Endangered bat roosts in old mine adits Company has history of controversy Company has history of controversy

Analysis of Visual Impacts KOP1- looking west from residential area and county road KOP1- looking west from residential area and county road

Analysis of Visual Impacts KOP2- looking south from heavily traveled county road KOP2- looking south from heavily traveled county road

Analysis of Visual Impacts Visual Contrast Rating Worksheet Visual Contrast Rating Worksheet

Landscape Contrast?

Visual Simulation KOP1

Visual Simulation KOP1 w/Tower

Visual Simulation KOP2

Visual Simulation KOP2 w/Tower

Project Mitigation Required relocation Required relocation Reduction in footprint to 100 x 100 feet Reduction in footprint to 100 x 100 feet No new road construction authorized No new road construction authorized Required to paint 130’ lattice tower yuma green Required to paint 130’ lattice tower yuma green

Final Project Area

Project w/Mitigation

Project w/Mitigation KOP1

Project w/Mitigation KOP2

Benefits Power located in close proximity Power located in close proximity Avoidance of historic mining district Avoidance of historic mining district Visual sensitivity to residents and county roads Visual sensitivity to residents and county roads Minimize possible impacts to other resources Minimize possible impacts to other resources Provides necessary coverage desired by applicant Provides necessary coverage desired by applicant Applicant and BLM saved time, money, and public image Applicant and BLM saved time, money, and public image With mitigation project now meets VRM III With mitigation project now meets VRM III