Bud Amorfini – R6SLT Paul Keiran – R1 Compliance Inspection Reports and Data Reporting Course Overview Introduction and Inspector Qualifications Pre-Inspection.

Slides:



Advertisements
Similar presentations
Andy Alderson – Head of RINA UK Chairman IACS EG/Coatings
Advertisements

Project Overview Statewide Storm Water Management Plan (SSWMP) A collection of program recommendations, procedures and new guidance material. Purpose.
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
NJDEP Maintenance Guidance for Stormwater Management
Applying for the VT Multi-Sector General Permit
Administrative Reviews Determining Compliance. Administrative Review Basics Formal “full” reviews – At least once every 3 years – Announced or unannounced.
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Module 7: Construction Phase
After the Sanitary Survey
Authorization and Inspection of Cyclotron Facilities Inspections.
Introduction to Construction General Permit Inspections.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Career Services Center Employer Training. This is the main login page. The link can be found at Employers.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
HOW TO DO Pollution Prevention & Good Housekeeping NC STATE UNIVERSITY.
2014 Construction Conference N.C. Region Stormwater Erosion Control Engineer KEVIN GARRIGAN, P.E. (715) (715) (CELL)
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Non-Storm Water Discharge (NSD) (Dry Condition) Observation Inspection and Reporting.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
Stormwater Control & Design
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Test Your Storm Water Knowledge!
Laura Prickett, AICP, CPESC EOA, Inc. April 11, 2013
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Overview by: Patrick Otsuji - SWRCB Michelle Beckwith - RWQCB.
San Rafael, California November 12, 2015
Case Study 1: Thirty Seven Acre Reservoir Project Paul Keiran – R1 Course Overview Introduction and Inspector Qualifications Pre-Inspection Preparation.
Prevention not Intervention Developing a Sound Response to Erosion and Sediment Control Problems through the Planning Process.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Introduction to BearQuest 1- 1 Getting the training you need1-2 Logging on and Getting Access1-3 Starting your Request1-6 Basic Screen Navigation1-8 Course.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Pollution Control: For Field Office Construction Sites.
Application, plans, etc. and fee received EHS reviews application/ plans Submission complete? Notify applicant that application is incomplete & track for.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Level 1 timeline of activities Links to helpful documents
Ohio Department of Transportation
Applying to SRJC as a High School Student Instructions
Storm Water Pollution Prevention Plan Development
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
Background First ERP written in 1991 Revised in 1998
Planning and BMPs for Capital Improvement Projects
Planning and BMPs for Capital Improvement Projects
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Overview: ICS Evaluation Procedures
Steps towards Certification
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
ECM SERVICES Group Stormwater Monitoring Program
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Software Reviews.
Diversity management system (DMS)
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Bud Amorfini – R6SLT Paul Keiran – R1 Compliance Inspection Reports and Data Reporting Course Overview Introduction and Inspector Qualifications Pre-Inspection Preparation Construction Site Compliance Evaluation Field Monitoring at Construction Sites Compliance Inspection Reports Compliance Inspection Data Management Compliance Enforcement Activities Case Study

Components of Inspection Reports Site Inspection Checklist Photo Log SMARTS Inspection Tab SMARTS Violation Tab SMARTS Enforcement Tab Other Supporting Documentation – May include written enforcement order, corrective actions verification, sampling results, etc. Compliance Inspection Reports and Data Reporting

Site Inspection Checklist – SMARTS Review

Site Inspection Checklist (cont.) – SWPPP Review

Site Inspection Field Form General Form - intended to be flexible depending on the nature of the site and the inspection process

Site Inspection Photo Log Number photos to coincide with the deficiencies in the Site Inspection Field Form Verify the camera was set with correct time and date.

Site Inspection Photo Log (cont.)

Compliance Inspection Reports and Data Reporting SMARTS Inspection Tab

SMARTS Violation Tab (SWPPP)

SMARTS Violation Tab (Site Management) Site management BMPs not implemented or maintained in violation of Attachment D, section B. of Order No DWQ

SMARTS Violation Tab (Sediment Control) Sediment Control BMPs not implemented or maintained in violation of Attachment D, section E. of Order No DWQ

SMARTS Violation Tab (Erosion Control) Erosion Control BMPs not implemented or maintained in violation of Attachment D, section D. of Order No DWQ

SMARTS Violation Tab (Unauthorized Non-Storm Water Discharge (NSWD)) Unauthorized discharge from vault dewatering to surface waters in violation of Attachment D, section C.

Closing the Loop Provide Sufficient Documentation in SMARTS to: – Identify the deficiencies found during inspection – Describe the enforcement action taken – Describe the specific corrective actions required – Determine when corrections must be completed – Document who, when, and how corrective actions were completed Compliance Inspection Reports and Data Reporting

SMARTS Enforcement Tab Sel requiring corrective actions for deficient BMPs. See attached enforcement documentation Discharger completed all corrective actions by June 5, 2012

Compliance Inspection Reports and Data Reporting Example Staff Enforcement Letter (SEL) Completed via Please see the attached list of corrective actions required as a result of our 5/30/2012 inspection at the Donner 3 site. You are required to complete the corrective actions by close of business on 6/5/2012. Once the corrective actions have been completed, verify the actions were implemented by completing the attached form, sign the verification, and send it to me. You may add photos that are deemed necessary.

Example Corrective Action Form Compliance Inspection Reports and Data Reporting

Example Field Sampling and Analysis Form

Example Completed Corrective Action Form

Training Course Overview Introduction and Qualifications Pre-Inspection Preparation Construction Site Compliance Evaluation Field Monitoring at Construction Sites Compliance Inspection Reports Compliance Inspection Data Management Compliance Enforcement Activities Case Study Compliance Inspection Reports and Data Reporting