JEMX October 6, 2004INTEGRAL Science Analysis Workshop The X-ray monitor JEM-X Purpose: Precise position determination (< 1 arcmin) Cover low energyspectrum.

Slides:



Advertisements
Similar presentations
Bob MichaelsParity Collab. Mtg. May 17, `07 Integrating Compton DAQ and Analysis Bob Michaels with Reminder about Nov 2006 Results Specification of new.
Advertisements

XMM EPIC MOS Jenny Carter EPIC Background, Operations and Calibration Mallorca, March/April 09 Jenny Carter, University of Leicester.
XMM EPIC MOS Jenny Carter 4 th EPIC BG WG Meeting Mallorca, 25/10/06 BGWG blank sky data analysis Jenny Carter, University of Leicester.
Expected Sensitivity of the NO A  Disappearance Analysis Kirk Bays (Caltech) for the NO A Collaboration April 14, 2013 APS DPF Denver Kirk Bays, APS DPF.
Basic Principles of X-ray Source Detection Or Who Stole All Our Photons?.....
XMM Calibration/Ops Meeting Mallorca October Using 3X3 Binned Mode for MOS Cameras for Fast(er) Imaging Tony Abbey, Leicester University.
S.Mereghetti - Simbol-X: The hard X-ray Universe in focus - Bologna -15/5/20071 Studying the Galactic Ridge Emission with SIMBOL-X Sandro Mereghetti IASF.
2001 Mars Odyssey page 1 W o r k s h o p H E N D Institute for Space Research, June , 2003 Robotic algorithm of HEND detection of GRBs V.
Page 1 18-OCT-2004 RHESSI Data Analysis Workshop RHESSI Reuven Ramaty High Energy Solar Spectroscopic Imager Use or disclosure of data contained on this.
X-ray Data Analysis Workshop Group 2 (NCU). Homework Contents Download Chandra data, extract the lightcurve and spectrum. Identify spectral lines. Make.
The all-sky distribution of 511 keV electron-positron annihilation emission Kn ö dlseder, J., Jean, P., Lonjou, V., et al. 2005, A&A, 441, 513.
MOS 3x3 mode slow slew survey Richard Saxton October 2006.
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
XMM EPIC MOS Andy Read for the BGWG CAL/OPS/BG Meeting Palermo, Sicily 11-13/04/07 EPIC Background Working Group Summary: Meeting.
RHESSI Background Spectra Vs Time. Qlook_bck Spectra have 491 energy channels, 1/3 keV resolution from 3 to 100 keV, 1 keV from 100 to 300 keV. Accumulated.
Jose Manuel Pérez Lobato Eva Martín Lobo OMC - INTEGRAL Memory Management.
A Primer on SZ Surveys Gil Holder Institute for Advanced Study.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
Deterministic Modeling of the MOS Background Steve Snowden NASA/Goddard Space Flight Center EPIC Operations and Calibration Meeting Mallorca 1-3 February.
C&A 10April06 1 Point Source Detection and Localization Using the UW HealPixel database Toby Burnett University of Washington.
Darren Baskill Timing mode spectral correction MOS Timing mode spectra problem.
The XMM slew survey: status and future Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Correct treatment of fast mode ARFs Marcus G. F. Kirsch, G. Schoenherr, E. Kendziorra,
On A Large Array Of Midsized Telescopes Stephen Fegan Vladimir Vassiliev UCLA.
EPIC PN background spectra for low surface brightness sources Michael Bauer (MPE), Wolfgang Pietsch (MPE) & Ginevra Trinchieri (INAF)
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
The X-ray Astronomy Imaging Chain. Pop quiz (1): which of these is the X-ray image?
GLAST Science Support Center June 29, 2005Data Challenge II Software Workshop GRB Analysis David Band GSFC/UMBC.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
Outline: Introduction into the problem Status of the identifications Summary Identification of Very high energy gamma-ray sources.
HIFI Tutorial 3: Getting some basic science out A.P.Marston ESAC 27 June 2013.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Sept 10-14, 2012 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
XMM data reduction: part II SAS command-line analysis and scripting Andy Read.
CODED MASK IMAGING WITH ASTROSAT SCANNING SKY MONITOR (SSM) Mask Design Camera Simulation Image Reconstruction 1-d 2-d, single camera 2-d, multiple camera.
A multi-colour survey of NGC253 with XMM-Newton Robin Barnard, Lindsey Shaw Greening & Ulrich Kolb The Open University.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
Gamma-Ray Bursts observed with INTEGRAL and XMM- Newton Sinead McGlynn School of Physics University College Dublin.
A look at XMM slew data Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri, Puri Munuera.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 SPIRE AOTs, Products and Quick Look Tools Bernhard Schulz NHSC/IPAC on behalf of the.
PET/SPECT Phantom. Side View of Phantom Image Resolution Intrinsic resolution FWHM Intrinsic resolution FWHM Field of view Field of view Measurement:
1 Report on analysis of PoGO Beam Test at Spring-8 Tsunefumi Mizuno July 15, 2003 July 21, 2003 revised August 1, 2003 updated.
Mar 1-3 – DC2 Kickoff Meeting - 1 Tom Stephens GSSC Database Programmer Retrieving, Filtering and Previewing Data.
X-ray powder diffractometer X-ray powder diffractometer.
PSF in-flight calibration - PN IFC/CNRRingberg, April 2-4, 2002 PSF in-flight calibration for PN camera Simona Ghizzardi Silvano Molendi.
SPI Data Analysis A. Strong MPE Moriond, Les Arcs 2002.
JEM-X Status S. Brandt on behalf of the JEM-X team Partly based on a presentation at ESOC, Feb 2005 at review marking the end of the nominal INTEGRAL mission.
JEM-X and INTEGRAL Niels Lund Danish National Space Center.
25s detection of the Sy1 galaxy NGC3516 The Palermo BAT survey project Application to a sample of SDSS LINERs V. La Parola, A.Segreto, G. Cusumano, V.
A bin-free Extended Maximum Likelihood Fit + Feldman-Cousins error analysis Peter Litchfield  A bin free Extended Maximum Likelihood method of fitting.
Gamma-Ray Bursts with the ANTARES neutrino telescope S. Escoffier CNRS/CPPM, Marseille.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Aug 26-30, 2013 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
Peterson xBSM Optics, Beam Size Calibration1 xBSM Beam Size Calibration Dan Peterson CesrTA general meeting introduction to the optics.
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
Results of Searches for Muon Neutrinos from Gamma-Ray Bursts with IC-22 Madison Collaboration Meeting 2009 Erik Strahler UW-Madison 28/4/2009.
XBSM Analysis - Dan Peterson Review of the optics elements: Pinhole (“GAP”), FZP, Coded Aperture Extracting information from the GAP what is the GAP width?
JEM-X SDAST meeting #31 j_ima_iros formal status j_ima_mosaic status JEM-X shared library: JEMXLIB Niels J. Westergaard, DNSC.
Extended sources with JEM-X, ESTEC| 21. januar 2005 | Ref | side 1 Studying extended sources with JEM-X Niels Lund Danish National Space Center.
Fermi Gamma-ray Burst Monitor
The X-ray Universe 2008 Granada, 29 May 2008
Onboard Instruments of ASTROSAT
CALET-CALによる ガンマ線観測初期解析
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
Summary Single Object & Time Series Spectroscopy Jeff Valenti JWST Mission Scientist Space Telescope Science Institute.
Erik Strahler UW-Madison 28/4/2009
Erik Strahler UW-Madison 4/27/2008
EPIC Calibration & Operations Meeting
Dorothee Coppens.
SSM onboard ASTROSAT Calibration and First Results
1st INTEGRAL Data Analysis Workshop ISDC, October 5-8, 2004 Imaging extended sources with JEM-X
Filtering Removing components from an image is know as “image filtering”. If we remove the high frequency components, we tend to remove the noise. This.
Presentation transcript:

JEMX October 6, 2004INTEGRAL Science Analysis Workshop The X-ray monitor JEM-X Purpose: Precise position determination (< 1 arcmin) Cover low energyspectrum 3 – 30 keV Properties: Field-of-view12 deg diameter 5 deg FCFOV Energy 7 keV 20 keV Imaging: Niels J. Westergaard, Niels Lund, Carl Budtz-Jørgensen Danish Space Research Institute Spectra: Stefan Larsson Stockholm University

JEMX October 6, 2004INTEGRAL Science Analysis Workshop INTEGRAL with JEM-X

JEMX October 6, 2004INTEGRAL Science Analysis Workshop JEM-X HARDWARE

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Modes of operation Full imagingFULL Restricted imagingREST Rudimentary energy binning, limited time res. Non-imaging formats (all detector): Spectral formatSPEC Timing formatTIME Spectral timingSPTI

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Grey filter event rejection When the event buffer is filled above certain level a random rejection of events will be initiated autonomously Level G will reject a fraction (31 - G)/32 0 <= G <= 31 When buffer filling is low again the grey filter level will increase again.

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Image production Steps in the process: LevelFunctionExecutable BIN_IShadowgram buildingj_ima_shadowgram BKGBackground subtraction(included) IMAImage reconstructionj_ima_basic_recon IMAFlatfielding(included) IMASource findingj_ima_src_find IMAVignetting correctionj_ima_cor_intensity IMA2Mosaickingj_ima_mosaic (OSA5)

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Shadowgram building Event selection based on STATUS flag (rowSelect) Correction for deadtime Correction for grey filter TELAPSE = Tstart – Tstop ONTIME = GTI 1 + GTI 2 + … EXPOSURE = ONTIME * corfactor shdType = 0’skew’ shadowgram shdType = 1standard shadowgram

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Mask pattern 25% HURA – but almost not cyclic, hence ghosts almost eliminated

JEMX October 6, 2004INTEGRAL Science Analysis Workshop The soon to disappear skew shadowgram

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Mask and shadowgram Mask array from IMOD GRP Shadowgram from OSA4 shdType=0

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Algorithm Balanced correlation

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Shadowgram Crab Nebula on axis Rev – 6 keV Leaking calibration sources

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Shadowgram low, medium energy 3-6 keV, leak removed keV, leak removed

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Shadowgram, high energy Smoothed version12-25 keV

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Background spectrum

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Background (1) 3 – 7 keV 30,000 s 7 – 13 keV

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Background (2) 13 – 40 keV 30,000 s radiusLimit = 105

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Basic reconstruction example OSA4 result Rev 53, PID keV Galactic Center region

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Fine resolution example Rev 53 PID 66 Galactic center 6-10 keV

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Vignetting function Vignetting array from IMOD-GRP This is the average vignetting BUT complicated geometry between mask and collimator and detector Contours: 20, 40, 60, and 80%

JEMX October 6, 2004INTEGRAL Science Analysis Workshop New member of ISSW family Midisky – to become j_ima_iros with OSA5 -Backprojection for source finding -Iterative removal of sources -As complete modelling of detector as possible including collimator imperfections -The spectrum and lightcurve extraction based on this modelling will be included in the ISSW as well Now: ftp.dsri.dk/pub/jemx/midisky/midi/midi_distribution_2.tar.gz

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Midisky example GRB Full science window 20 s during burst

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Midisky manipulated mosaic In IROS each source gets a position and a strength. Here they are taken out, the remainder smoothed; then the sources have been put back in.

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Fin After running jemx_science_analysis up to and including level IMA you’ll find in the …/res directory: jmx1_evts_shd.fits shadowgrams jmx1_rsti_ima.fits ’skew’ images jmx1_sky_ima.fits WCS images jmx1_find_res.fits individual find results jmx1_srcl_res.fits source list summary and the stage is set for the spectral/timing analysis …

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Rev 102 Log scale 3-6 keV Crab on axis in log scale

JEMX October 6, 2004INTEGRAL Science Analysis Workshop Noter: hvad skal findes Billeder at skaffe: Synsfelter Standardbillede Fine resolution midisky = j_ima_iros