LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D.

Slides:



Advertisements
Similar presentations
Discussion on TE/CRG equipment at H4IRRAD Marco Pezzetti (A. Tovar – B. Ivens / Support CE for cryo LHC) & TE-CRG-OA – TE-CRG-CI 1TECRGCE M.PEZZETTI.
Advertisements

Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
LSC – 16 August M. Pezzetti – Cryogenics 1.
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
LSC - 28 February M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: v.1.
Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
LHC Beam Dumping system
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
CRYOGENICS AND POWERING
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
AB-CO review Support for Cryogenics. Philippe Gayet AB/CO IS CERN, 20/09/05 Outline Scope Hardware Type, Responsibility sharing, Status Basic software.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Overview of the LHC cryogenics control system and available data for RAMS FCC studies Benjamin Bradu, CERN, EN-ICE 1 September 2015.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
60kW Thermosiphon control system
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
1 Radiation worries in the cavern L.Jirdén
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
TE-CRG Activities D. Delikaris, TE-CRG.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
H4IRRAD 2012 M. Calviani (EN/STI) for H4IRRAD team.
LHC Cryogenics From cool-down to 1st beams Serge Claudet (LHC Cryo OP), On behalf of cryo teams involved.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
BA6 – crab cavity activities in EYETS
Innovative He cycle Francois Millet.
Cryo PLC issues [May 2011]: CASES
LV Safe Powering from UPS to Clients
R2E – Experience and Outlook for LS1
Accelerator and Experiment Interface Session: LS2, LS3
CRYOGENICS OPERATIONS 2008 Organized by CERN
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
EN/EL Tests in H4IRRAD October to 7 November
Collimator Control (SEUs & R2E Outlook)
Preliminary Analysis and foreseen actions EN-ICE&EN-STI
Finally.... We had to wait a long time.... We had many problems....
RADIATION induced failures in LHC 28th June 2011
Radiation To Electronics 2x A Brief Look
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
Presentation transcript:

LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D. Willeman, P. Durand, Ph. Gayet (EN/ICE)

Outline 2  Schneider PLCs issues on the LHC CRYO Control system  H4IRRAD test campaign results  Proposed mitigation measures LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department

LHC downtime due to the Cryo Schneider PLC issues  Is radiation the cause ?  Potential SEUs: 7 LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department3 All underground! PLC Schneider Premium LHC Cryo SurfaceCavern P1863 P264 P4114 P6116 P8104 Total

LHC refrigerators control architecture RM SL Sector L (3.3 Km) 4 LHCA QURA LHCCA QURCA QSCCA LHCCB QSCCB LHCB QSRB QSCB QUI QSDN QSAA Comp 4.5K Comp 1.8K Main Dryer Comp 1.8K Comp 4.5K QURCB Cold Box 4.5K LN2 Buffer CB 1.8K Connection Box UCB 4.5K QSRA QSKA QSCA QSAB Main Dryer Local & Central Control Rooms SCADA Data Servers RM SR Alcoves Sector R (3.3 Km) Tunnel Cavern Surface Shaft QSDN RM PA Profibus DP WorldFIP Return Module SL & SR UX85: ✓✓✓ UX45: ✓ US65: ✓ US45 : ✓ US85 : ✓ LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department4

Radiation tests  Objectives  Confirm PLC radiation sensitivity: as shown in the LHC cryogenics control system during 2011 operation  Not for testing PLC radiation hardness  Validate potential solutions  Architectures to test: 1. PLC Premium CRYO-like  LHC Cryogenics like sample but in two different configurations:  P575634M with memory card  P576634M without memory card 2. PLC Premium with remote I/O backplane  PLC CPU in safe area (UL) and a passive bus X connection to the remote I/O backplane located in radiation area. 3. PLC Quantum Redundant architecture  Possible solution to increase availability (should be seen decoupled of the radiation issue) LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department

H4IRRAD SPS beam Production target Internal irrad zone (LHC tunnel) External irrad zone (LHC shielded zones) Access is possible only from the top shielding (removal of 160 cm Fe blocks) LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department6  H4IRRAD can reach 1 year of nominal LHC in ~1 week (underground zones)  LHC RadMon for monitoring – agreement with FLUKA simulations within 20-30%

Radiation sensitivity  The PLCs have been tested during a period of low beam intensity due to their significant radiation sensitivity  Crashes observed after ~5-10 minutes at H4IRRAD nominal beam (~5*10 5 HEH/cm 2 /min)  Clear correlation between PLCs CPU crash and radiation  Cross-section estimated from a period with ~5*10 4 HEH/cm 2 /min (US85 ~ 3.5*10 2 HEH/cm 2 /min) ~5*10 4 HEH/cm 2 /min ~2*10 5 HEH/cm 2 /min ~4.5*10 5 HEH/cm 2 /min LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department7

Sensitivity results TypeHEH to failureStatus PLC Premium (low memory user application occupancy: ~ 7% exec code ) 5*10 6 HEH/cm 2 /failureNot responding + restarted PLC Premium (P8 QURCB-like application: ~ 18% exec code) 2*10 6 HEH/cm 2 /failureNot responding + restarted Remote I/O backplane (cabled I/Os) ≥5*10 9 HEH/cm 2 /failure OK! PLC Quantum redundant3*10 6 HEH/cm 2 /failure (increased availability) PLC malfunction  PLC Premium cross-section in agreement with LHC operation data  Radiation sensitivity appears to be dependent to the user application memory occupancy (~ 2.5 times)  Crash with no remote access possible with PLC Premium!  No failure observed or induced by the remote I/O backplane LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department

LHC radiation levels in P4/P6/P8  P8: LHCb luminosity  Values ≤4*10 7 HEH/cm 2 /2011 (in US85)  Evolution will directly depend on the cumulated LHCb lumi (1-2 fb /2) – same value expected for 2012  P4/P6: beam-gas due to pressure spikes in the cavities (P4) and in the extraction septa (P6)  Values ~10 6 HEH/cm 2 /2011 in UX  2012 levels should be similar as this year  After LS1 values will depend on the vacuum behaviour with 25ns operation (situation not yet clarified)  P2: ALICE luminosity  levels insignificant in US25 LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department9

Conclusions of the test campaign  What we confirmed:  High sensitivity to radiation (SEUs) of Schneider Premium PLCs  SEU induced failure cross-section in agreement with LHC operation data during 2011  What we observed:  Radiation sensitivity dependent on the user application memory occupancy (to be confirmed with Schneider)  Radiation robustness of the remote I/O backplane and I/O cards (including CPU reliability with that architecture) – no failure observed  Equal sensitivity with or without flash memory card  Redundancy solution offers limited radiation sensitivity robustness LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department10

Mitigation actions (winter shutdown) 1. Improve availability : The radiation campaign in H4IRRAD showed remote I/O low radiation sensitivity and, therefore, the PLC CPU relocation to a safe area (UL) is the solution retained.  Feasibility discussed already within the R2E activities (EN/ICE, EN/EL, TE/CRG)  Action prepared for the winter shutdown (including ordering, cabling, electricity)  Affecting P4, P6 and P8 (in that precise order). P2 not needed 2. Other improvements (once the PLCs are in a safe area) 1. Remote accessibility - Additional Ethernet card to be installed in the relocated PLCs. (21) - Allows remote access via IP reducing time and resources during interventions 2. Robustness - Eliminate flash memory cards in some PLCs (9, awaiting Schneider validation) - Already done in 2011 for the P8 QURA PLC 3. Diagnostics - Enrich the onboard PLC diagnostics (collaboration with Schneider Electric) LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department

Mitigation actions (Long Term)  Long-term actions (LS1)  Awaiting 2012 LHC operation to decide the next move (reliability of Schneider PLCs)  But in parallel: 1. Continue radiation testing on H4IRRAD facility on equipments like the ones remaining in radiation areas (PLC Quantum, Siemens on turbines,…) and also in other architectures (redundancy) 2. Study a possible full relocation of all active electronics in P4 and P6 as done in P8 3. Validate PLC redundant architectures for a possible migration of some equipments during LS1 This is independent of radiation issues and will increase the availability of the cryogenics control system in view of the large downtime induced by an issue in the control system (only if the new situation does not satisfy the required availability!) LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department12

Acknowledgments  Many thanks to:  EN/MEF for the precious support during construction and during each installation phase  The H4IRRAD team and EN/STI for the follow-up of the test area operation (radiation and beam monitoring)  EN/ICE for availability and reactivity  Thanks a lot for your attention LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department13

LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department14

H4IRRAD external zone p+ beam EN/EL EN/ICE PLCs LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department15

H4IRRAD configuration SPS beam Production target Internal irrad zone (LHC tunnel) External irrad zone (LHC shielded zones) Access is possible only from the top (removal of 160 cm Fe blocks) LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department16

Passive vs. active bus X solutions 17  The active bus X includes two electronic pieces in both ends of the cable that can be a source of problems under radiation environment. LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department

H4IRRAD test area overview  What is it?  Test area to test equipment in LHC-like particle spectra  H4IRRAD can reach 1 year of nominal LHC in ~1 week (tunnel and alcoves)  Radiation monitoring  Radiation monitoring based on the LHC RadMon system  FLUKA simulations employed to cross-check and understand the radiation field (agreement within 20-30%) LMC, 9/Nov/2011M. Calviani, E. Blanco - EN Department18