A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 1 The BX Alignment in The Muon System Summary System peculiarities concerning timing issues System.

Slides:



Advertisements
Similar presentations
Do we need fine time in NA62? Fine time means greater accuracy than the system clock of 25 ns. YES Here are some reasons we need to match identified kaons.
Advertisements

J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Walls crates cables gas chambers electronics CERN adb.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
CARIOCA (Cern and RIO Current Amplifier). The CARIOCA chip has 8 binary output, therefore DIALOG has 16 PCH as input channels and has up to 8 LCH as output.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
PicoTDC Features of the picoTDC (operating at 1280 MHz with 64 delay cells) Focus of the unit on very small time bins, 12ps basic, 3ps interpolation Interpolation.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Enrico Fois - LHCb Muon ECS Meeting - Roma Synchronization and alignment requirements.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
LHCb front-end electronics and its interface to the DAQ.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
NSYNC and Data Format S. Cadeddu – INFN Cagliari P. Ciambrone – INFN LNF.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Integration and commissioning of the Pile-Up VETO.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Could we abandon the HW LLT option and save money (and allow possible further improvements to the upgraded muon system)? Alessandro Cardini of behalf of.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
IB PRR PRR – IB System.
18/05/2000Richard Jacobsson1 - Readout Supervisor - Outline Readout Supervisor role and design philosophy Trigger distribution Throttling and buffer control.
NA 62 TTC partition timing T.Blažek, V.Černý, R.Lietava, M.Kovaľ, M.Krivda Bratislava, Birmingham We are developing procedures for timing parameter adjustment.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Paolo Ciambrone INFN- LNF ODE ECS ODE ECS Off Detector Electronics for the muon system INFN - LNF Servizio Elettronica Laboratori Frascati A. Balla, M.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
SuperB DAQ U. Marconi Padova 23/01/09. Bunch crossing: 450 MHz L1 Output rate: 150 kHz L1 Triggering Detectors: EC, DC The Level 1 trigger has the task.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Some thoughs about trigger/DAQ … Dominique Breton (C.Beigbeder, G.Dubois-Felsmann, S.Luitz) SuperB meeting – La Biodola – June 2008.
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
TELL1 A common data acquisition board for LHCb
CMS EMU TRIGGER ELECTRONICS
FPGA-based Time to Digital Converter and Data Acquisition system for High Energy Tagger of KLOE-2 experiment L. Iafolla1,4, A. Balla1, M. Beretta1, P.
SVT detector electronics
Test of Link and Control Boards with LHC like beam, CERN, May 2003
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
ETD parallel session March 18th 2010
The LHCb Front-end Electronics System Status and Future Development
TELL1 A common data acquisition board for LHCb
Presentation transcript:

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 1 The BX Alignment in The Muon System Summary System peculiarities concerning timing issues System peculiarities concerning timing issues System features System features The test beam experience The test beam experience Alignment strategies: Alignment strategies: Without beam Without beam With beam With beam Alignment based on the beam structureAlignment based on the beam structure Interaction triggersInteraction triggers Muon haloMuon halo Muon reconstructionMuon reconstruction Commissioning and “pilot” run issues After discussions and re-discussions with Bepo, Richard, Sandro et al.

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 2 Muon System (MS) timing-related peculiarities The MS can be perfectly subdevided in 4 “equal” parts The MS can be perfectly subdevided in 4 “equal” parts We have 120,000 FE channels We have 120,000 FE channels Around 50,000 signal cables (LVDS) of different lengths Around 50,000 signal cables (LVDS) of different lengths 20 different types of detectors, with different time responses 20 different types of detectors, with different time responses Time spectra from detectors are relatively wide Time spectra from detectors are relatively wide We have to tag and send data to the L0  trigger before the L0 buffer We have to tag and send data to the L0  trigger before the L0 buffer

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 3 Time alignment system features: front-end side Knobs Coarse pitch (SYNC, ODE) TTCrx settings (per board = 192 channels) BX offset (per SYNC = 8 channels) BX preload (at BCR) (per SYNC = 8 channels) L0 buffer latency (per SYNC = 8 channels) Input pipeline (per channel) Trigger output pipeline (per channel) Fine pitch (DIALOG, on FEE) 1.6 ns x 31 steps (per single channel) Monitoring Two types of histograms: Fine time histograms Coarse time histograms (starting of the orbit). They are visible on the ODE (selecting each single channel by ECS). FTH can be built either on input hits or on L0- passed hits Pulsing system Each FE channel can be pulsed at a programmable BX (“primitive” ECS)

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 4 System Time Alignment Step 0, without external triggers:  Align BC counters (SYNC chip, ODE controller, TTCrx). On a given L0yes, the BX counter on the ODE controller, the TTCrx BX counter and the BX counter at the output of the L0 buffer must all be equal Data from FEE BX tag BCR, L0R preset/get BC counter via ECS To L0 trigger L0yes L0 buffer DPRAM 256 L0 derandomizer DPRAM 128 Inside SYNC: Programmable L0 buffer latency (R/W pointers) Start W_Add Start R_Add To ODE controller BXId(3:0) We fix the L0 latency on Odin, then we align playing with ODE timing parameters. The effective alignment is checked on a L0yes, looking at dedicated flags. On request, also the 4 LSB of the BX counter can be directly checked on the FIFO of the ODE controller. (BCR) The Muon FE has “to BCId” data BEFORE the L0 buffer

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 5 Simplified Scheme of System SPS (Sept06) ODIN SPS signals TFC controls Transition Board ODE (x2) TELL1 30 CARDIAC Chains ( ch.s out) Service Board Optical splitter Optical data Links Tell1 ECS (CCPC) PVSS-based control system FEE setup and control program I 2 C chains (Auxiliary trigger) (L0 yes) TFC controls Eth. switch DAQ PCs L0  processor ODE setup and control program Trigger sc. and trigger logic TFC controls TELL1 TFC controls DAQ console LVDS (15m) LVDS (20m) CANbus ELMB Data Event hits (x2)

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 6 System Time Alignment: Coarse BX alignment in the SPS TB Known effective L0 latency of 160 cycles starting from an external trigger (no L0 processors and L0DU, of course): around 145 cycles. Known signal cable lengths: 20m Evaluated Trigger delay All channels in each chamber considered in time among themselves (small size system) The adopted procedure was the following: 1.Set an initial L0 latency = 145 cycles 2.Given a trigger, generate13 consecutive triggers (…), centering the triggered event inside the window (L0 latency = 145 – 6  event on the 7 th slot) 3.Set the Odin in such a way to issue a max number of triggers = 13 4.Look at the data on the MEP buffer (fast) or on the DAQ PC (slower). 5.Change the ODE/FEE settings until the alignment is reached Initial hints: In order to align received hits/events (readout data) and triggers The key parameter is the L0 accept latency

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 7 3GEMMWPC Coarse BX alignment Histograms constructed from acquired data after ~ 5-10 scintillator triggers t slot # N of events SYNC number Having the same Odin and ODE settings, the same cable lengths, the MWPC signals appeared at first as arriving two BX before the 3GEM ones (detector response) Vth = 4 fC Vth = 6.5 fC The MWPC were delayed by 2 cycles and then all the signals centered again w.r.t. the trigger reducing the L0 latency Finally an alignment was obtained within +/- 1 slot 3GEM MWPC

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 8 Fine Time on data: before alignemnt MWPC GEM Slot # In this case, we wanted to center on the 3 rd slots

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 9 Fine Time on data: after alignemnt MWPC GEM

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 10 3GEM fine time (before fine alignment) Fine Time alignment using SYNC histograms 3GEM fine time (after fine alignment) After BX retuning X MWPC fine time

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 11 Different methods of time alignment 1 – Without beam

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 12 Scheme of the synchronous pulsing system SB FEB SB TFC The PDM issues a pulse synchronous to a given BCId Backplane distribution (<< 1 m) 1 12 FEB ECS distribution: I2C chains (LVDS cables, m) CARIOCA DIALOG CARIOCA Pulse_In Next DIALOG can program the pulse delay to the CARIOCA input PDM TTCrx

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 13 Some remarks about the Pulsing System (PS) 1.The pulse distribution is not equalized “naturally”. 2.Even without perfect equalization, the PS can be used as it is for a rough alignment (+/- 1 cycle). 3.In principle, it could be perfectly equalized using the DIALOG programmable delays, compensating for the different travel distances (in primis, cable lengths and detector responses)  Cable length data base (information exist, to be built) Considering the beam conditions of the pilot run, we now plan to exploit the full potentiality of the PS in order to get a good alignment already without beam

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 14 Use of the pulsing system We will perform “pulsing” runs already in the commissioning phase, as soon as a good part of the detector and system electronics are installed This can be done using TFC signals emulating the nominal bunch structure The TFC can also issue triggers in correspondance with the programmed BXId on the PDM. In such a way regular data taking is possible. The aim/result of these runs would be: To test system connectivity in detail (also for debug purposes); To build and check a “time position map” of the system To realize a time system alignement at the level of +/- 1 BX (or better) TFC PDM ODE (L0 buffers) Pulse Detectors Hits DAQ L0y

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 15 The L0  can be added in the chain. If it is set to accept the event, we could also “measure” and align the L0  latency. We could go further Also, If we align at least some towers of the MS using Pulsing, one could also imagine to emulate (pulsed) tracks in the apparatus. Would this be useful for the L0  commissioning, before the beam ? - Also, If we align at least some towers of the MS using Pulsing, one could also imagine to emulate (pulsed) tracks in the apparatus. Would this be useful for the L0  commissioning, before the beam ? TFC PDM ODE (L0 buffers) Pulse Detectors Hits DAQ L0y Hits+BXId L0  Processor L0  answer (yes)

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 16 Different methods of time alignment 2 – With beam

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 17 One TDC histogram per logical channel is automatically filled in the SYNC chip and can be readout through ECS. The same histograms can be filled on a BX per BX basis, in such a way to reproduce the bunch structure locally, at the level of the ODE boards, where data are BX-tagged 1. SYNC histograms and bunch structure Theoretically, this method provides the exact position of the given FE channels w.r.t. the absolute BX number. This method is very effective in the highly populated stations, less in the others. It requires relatively high Luminosity and for this reason will probably not be effective in the foreseen scenario of the startup phase. But it will be there... Simulated SYNC histograms in the case of a 75 ns bunch structure

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 18 2) Interaction trigger from Cal(l)o(t) This method is very similar to the one used in the recent SPS TB: 1.Start from a  aligned setup 2.Trigger on very isolated MB triggers (in this case it helps !!!) from Calo, 3.generate artificially 3-5 consecutive triggers (or more, if possible) 4.In the data, look for the hits in the super-event window 5.Re-adjust the latencies consequently 6.Check alignment consistency with the other subsystems As the Calo trigger and BX is already aligned to the orbit, this method is compatible with the one using the bunch structure. Interaction trigger are generally “dirty” and not perfectly suitable for time alignment. The best, of course, would be to trigger on MIPs (  )

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 19 3) Muon halo with the Calorimeter...But: Not sufficient for full Muon Detector commissioning - no muon halo events in the outer regions - M1-M5 are projective from IP… Muon halo could be useful to accelerate time alignment of the inner part of Muon Detector. Triggering on muons would give clean tracks, perfectly in time

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 20 The TDC histogram of muon hits permits the best time alignment. This method must be used anyhow (for M2-M5) before Physics Runs to maximize trigger efficiency. We will use this method when we already have a sufficiently good prealignment and a reasonable Muon Trigger, possibly a MuonID at HLT level. The problem at low luminosity will be the available statistics in the less crowded outer regions. 4) Muon identification through a “HLT like” algorithm + DAQ, look at TDC of Muon hits

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 21 Program for alignment Starting from the inner regions, we foresee to reach a good pre-alignment on at least a significative part of the System (if not on the whole System), before the arrival of the beam B) When the beam is there, we will widely exploit the HCAL features, concerning both the MB and the muon (halo) triggers. The alignment will be found by reading consecutive triggers. C)When a reasonable alignement is reached, the L0  enters the game D) Meanwhile, MuonId algorithms are used to refine the alignment A) As soon as a complete tower of the MS is installed and equipped, start commissioning in the pit. In this first phase commissioning will consist in: 1. System debugging (missing channels, cabling errors...) 2. System time alignment (pulse system) 3. Possibly, combined tests with the L0  Points 2 and 3 require a working Odin in our partition. This exercise will continue on a tower basis while the MS is being installed.

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 22 Installation+commissioning Schedule (Sept. 06) Hardware situation is fair We will start Electronics (functional) commissioning in March

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 23 1.An ECS structure working at system level. We have simple panels to control FE boards (CARDIAC, ODE), but this are still inadequate at the system level (and are not in PVSS). A lot of work must be done in this direction. 2.Also, an important amount of work is to be done on System Data Base handling, which can be crucial in the pre-alignment phase. 3.Phaenomenology concerning pilot run conditions should be studied better: - Hit multiplicity per region, - statistics / distribution of μ from beam gas, - rate per channel and the needed running time with the different methods.... What is still lacking

A. Lai – 18/10/2006 – L0 workshop: Muon BX Time Alignment 24 Conclusions We will get a good time alignment already without beam By using Calo-generated triggers we can verify the alignment with the beam in a relatively fast way (1-2 days?) in such a way to let the Muon trigger enter the game as soon as possile This will be “easy” for the inner part of the detector (R1-R2), more problematic for the outer regions (to be studied better), where we will probably have to rely on the pulsing alignment. Work to be done on the ECS side.