Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.

Slides:



Advertisements
Similar presentations
Paul Bullows MIFPO, MIIRSM Health and Safety Manager
Advertisements

Emergency Preparedness and Response
Border Engineering Training Association Health and Safety.
Security, Fire Safety and Health and Safety at Central European University.
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 5.
Chemical Release Explosion Toxic Vapors. Fire Tornado Smoke Power Outage 16.
Manchester Central Site Induction Aims of this induction: Identifing key information and instruction necessary to work safely at Manchester Central,
Environmental Health & Safety Fire Safety for MSO, Medical Students and Nursing Students.
NEBOSH Fire and Risk Management Certificate Issue October
Leaders in Life. Safety. Technology. Interactive Firefighter’s Display.
Building Marshal General Duties Evacuation Assistance Accountability Scene Integrity NC STATE UNIVERSITY Environmental Health and Public Safety Fire Protection.
Cleaning: fire safety ESOL Nexus.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
Chapter 1.5 Fire Regulations. Components of a fire Fuel: Something that burns Air: Oxygen to keep the fire going Heat: Gas, electricity, etc.
Smoke Control Fire-Rated Stairwells Fireproofing of Structural Components Egress Lighting Fire-Resistive Construction Elements Fire and Smoke Dampers Emergency.
How to create... A Fire Evacuation Plan.
SELECTING A SAFE ASSISTED LIVING HOME A guide to help families select the safe living environment their loved ones deserve.
Employee Emergency Action Plans and Exit Routes Training Program.
EGRESS AND FIRE PROTECTION
Student Briefing College Of Engineering February 2011.
Immanuel Church Feniscowles
KUSU Commercial Services Student Staff Training Module 5 Fire Safety.
Environmental Health & Safety
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.

IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
Fire Precautions Regulations 1997 Alexi and Mat. Employers Responsibility Employers are responsible for providing multiple access and exit points in the.
1/05 Means of Egress WAC School Safety Training.
Help us defend the world against Fire with the Fire Precaution Act 1971 !
© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
Merseyside Fire and Rescue Service Fire Safety Inspections.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Health & Safety at Craighall Campus. This brief introduction provides details of our safety and emergency arrangements at Craighall Campus.
Department of Automatic Control & Systems Engineering Safety Induction.
HE UTTAR PRADESH FIRE PREVENTION AND FIRE SAFETY RULES 2005
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
Fire Safety in the Workplace Pupils will learn how to act when faced with a fire in a work setting.
10 Fire Safety Rules 10 Fire Safety Rules.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
THE GRAMMAR OF SAFETY SIGNS Legislation. Safety signs should be placed/posted whenever there is a risk that cannot be controlled by any.
AWARENESS Make yourself familiar with fire exits, break glass points and extinguishers The fire assembly point is marked and can be found in the car.
Fire Safety Tips How to Make Sure the Only Fire is on the Inside!
Fire Safety in the Theater By: Haley Patton Patti Ott Beaney Corral
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
Fire Safety Laura Escalante Miriam Barquera Ivan Morales Chad Jones.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 4.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Means of Egress Don Ebert- Risk Manager (509)
Safety Signs Contents Introduction to safety signs. Prohibition signs
6/7/20161 Underground Safety Training. 6/7/20162 Recognize the physical layout of MI-65 and MINOS underground. Be aware of specific hazards of the underground.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Building The topic ‘Building’ can be divided into three parts: Passive fire protection Fire protection that is built-in in the building (for example fire.
Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection.
Fire Risk Assessment Judith Evans BEng(HONS) CMIOSH
Safety in the Neutrino Platform Hall
Safety Systems for ALICE
HSE rules & regulations
M.Tavlet, H.Taureg - ALICE
What Library Staff Should Know About Fire Safety
Cryogenic Risk Assessment in LHC
FACILITY EMERGENCY PROCEDURES
February 2019.
Click to start.
Fire Safety Training 1.
Emergency Evacuation Plan
FIRE DRILL Greenbank Preschool, Greenbank Church Braidburn Terrace, EDINBURGH EH10 6ES TEL: A ON DETECTING FIRE 1 SOUND THE ALARM.
Fire Safety City Campus
Presentation transcript:

Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005

Review 21 June 2005pkf2 Safety of premises 1.Fire and ODH detectors 2.Evacuation sirens 3.Escape routes 4.Means of alert 5.Emergency plans 6.Assembly point 7.Access policy 8.Access permissions 9.Access control systems

Review 21 June 2005pkf3 Fire and ODH detectors The hall is equipped with a set of smoke detectors. The type is a light beam across the hall. ODH detectors are installed in the RF test bunkers. These alerted during a complete stop of the main cryoplant compressors. ODH detection has not been fund necessary at the magnet test stands.

Review 21 June 2005pkf4 Evacuation sirens The fire detection releases automatically the evacuation sirens. This was inadvertently tested during the open door day in The ODH detectors have been connected to the CERN alarm transmission system.

Review 21 June 2005pkf5 Escape routes Escape routes are, normally, marked on the floor. However rapid changes to the use of the available space may leave a delay between a new installation and the marking on the floor. There is a constant effort between the different teams, the TSO and SC to maintain escape routes of sufficient width to allow a rapid evacuation. The number of escape doors and their place should be in conformity with the rules for this. No more than 30 metres from any point to an exit door.

Review 21 June 2005pkf6 Means of alert and for fire fighting Telephones are available No red telephones are installed in the hall General emergency stops are installed The fire and ODH detectors are related to the SCR Fire-fighting extinguishers are available

Review 21 June 2005pkf7 Emergency plans and exits and assembly point Emergency plans are posted at the main doors Exit signs are posted over the doors Doors can be opened from inside, mostly by crash-bars The assembly point is marked

Review 21 June 2005pkf8 Access to SM 18 The access policy is: Only authorised persons have access to the hall. Access is granted by the TSO upon request from the supervisor of each person. A condition for working in the hall is that the basic safety courses of level 1 and 2, plus a half day introduction to the risks in cryogenics have been followed.

Review 21 June 2005pkf9 Implementation of the access policy Outside normal working hours the access system opens the doors by a valid access card. The data base is in such a state that the courses cannot be checked. Any valid CERN card opens the doors. During working hours pedestrians and 2 wheel vehicles can enter freely. The site manager can open the gate for the access of cars. E.g. for loading or unloading. The BA 7 entrance barrier is normally closed and can be opened with any valid CERN card.