Lesson 5 ODOT Merging Best Practices. Merging Best Practices Our Task: As the best practices are written, they are not complimentary Can we merge the.

Slides:



Advertisements
Similar presentations
Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
Advertisements

Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
PROJECT RISK MANAGEMENT
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Lesson 2 ODOT Useful Information and Uncertainty “[I]t is possible to improve on common sense” by methodically focusing on the package of premises and.
Lesson 1 ODOT Simple Models. Simple Models Learning Outcomes As part of a group, develop conceptual models of REC, stressors, and a highway project Identify.
ASSESSMENT IN HIAs Elizabeth J. Fuller, DrPH, MSPH Georgia Health Policy Center.
Strategic Environmental Assessment (SEA) Manual Environmental Protection Department H. M. Wong 18 June 2005.
HEADQUARTERS Strategic Environmental Assessment ”SEA is a systematic process for evaluating the environmental consequences of proposed policy, plan or.
Britta Bierwagen 1, Roxanne Thomas 2, Kathryn Mengerink 2 & Austin Kane 2 1 Global Change Research Program National Center for Environmental Assessment.
EIAScreening5(Gajaseni, 2007) 1 EIA - Operating Principles.
Introduction to Decision Analysis
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
Moving towards a more comprehensive planning SEA and indicators Per Christensen Aalborg University Denmark.
ENVIRONMENTAL MANAGEMENT PLAN
Topic 6 Environmental Impact Assessments. EIA – Introduction The start Effectiveness?
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
What is Business Analysis Planning & Monitoring?
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
Environmental Risk Analysis
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Discussion of Draft CEQ Guidelines for Addressing Climate Change in NEPA Projects Tim Stroope, NEPA Coordinator, GMUG National Forest
PRM 702 Project Risk Management Lecture #28
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Performance Measurement and Analysis for Health Organizations
UNEP Training Resource Manual Topic 13 Slide 1 Aims and objectives of SIA are to: F analyse how proposals affect people F identify and mitigate adverse.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
Wetlands and Poverty Reduction Project Anglophone regional practitioners training course MODULE 3 POLICY SETTING AND ADVOCACY By Teddy Tindamanyire, Isah.
UNEP Training Resource Manual Topic 11 Slide 1 Aims of EIA implementation and follow up are to: F carry out conditions of approval F ensure they work effectively.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Management & Development of Complex Projects Course Code MS Project Management Risk Management Framework Lecture # 22.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
1 Monitor and Evaluate Planning Step 9. 2 Social Science Activities in Land Use Planning Planning StepsSocial Science Activities Steps 1 & 2: Identify.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
CHEVRON PIPE LINE COMPANY Risk Based Prioritization Process.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Mitigation and Impact management
Global Environmental Change and Food Systems Scenarios Research up to date Monika Zurek FAO April 2005.
Division of Technology, Industry, and Economics Economics and Trade Branch SESSION 7 - How to do Integrated Assessment Stage D: Issuing policy recommendations.
Lesson 4 ODOT Best Practices. Best Practices Our Challenge: Best Practices for Action-Focused and Resource-Focused analyses are distinct Distinct best.
The new EC impact assessment: what for? EUROPEAN TRADE UNION CONFEDERATION Sophie Dupressoir.
CUMULATIVE EFFECTS ASSESSMENT METHODOLOGY AND TECHNIQUES.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Reporting in the EIA process.
NPC Study on Prudent Development of North American Oil and Gas Resources Resources and Supply Task Group - Framing Questions Oil & Gas Resources: What.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Public Participation in Sustainability Planning and Socio-Economic Impact Assessment in Canada.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
09/20/2010 National Petroleum Council Future Transportation Fuels Study Supply and Infrastructure Task Group Update November 9, 2010 Joseph Caggiano 1.
Risk Assessment: A Practical Guide to Assessing Operational Risk
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
Strategic Environmental Assessment Patrick White and Nelly Isyagi.
K. Bruce Jones EPA Office of Research and Development U.S. EPA Science Advisory Board Regional Vulnerability Assessment Advisory Panel Meeting October,
EIA (Environmental Impact Assessment)
EIA approval process, Management plan and Monitoring
Risk Assessment.
5. Impact assessment world café: Cumulative impacts
Reporting in the EIA process
1.
Strategic Environmental Assessment (SEA)
Analysis of the notification of compensatory measures
Presentation transcript:

Lesson 5 ODOT Merging Best Practices

Merging Best Practices Our Task: As the best practices are written, they are not complimentary Can we merge the best practices into a single, coherent approach to a complete EIA?

Merging Best Practices Predicting Effects Predicting Effects Scoping Disclosing the Implications Disclosing the Implications Identify useful information 2. Resource-Focused Analysis Conduct: 1. Action-Focused Analysis Discuss uses and limits of the information

Merging Best Practices Matching Best Practices and EIA components ►Scoping - a process ►Predicting Effects – two-part analyses ►Disclosing Implications and Determining the Environmental Consequences – analysis (identify, determine, modify & monitor)

Merging Best Practices FHWA Checklists

Merging Best Practices Which EIA component does this step best fit: Confidence that the impacts will occur? A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Can the impacts be sufficiently described and specified now to allow for useful evaluation? A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: If the impacts are not evaluated now, will future evaluations be irrelevant? A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Identify the study area’s directions and goals (transportation as well as social, economic, cultural, and ecological) A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Inventory the study area’s notable features (these are specific indicators … [including] elements of the biophysical and human environment considered valuable, vulnerable, or unique) A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Identify impact-causing activities of the proposed action and alternatives (both activities required for implementing the project and those likely to be caused by the project) A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Identify indirect effects for analysis (by exploring cause-effect relationships between project activities and goals or notable features and isolating issues of concern) A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Analyze the identified indirect effects (with an appropriate forecasting tool) A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Evaluate the analysis results (communicate the results and accompanying assumptions and uncertainties about the results to decision makers and the public; conduct sensitivity and risk analyses; use the results as a factor in project decision) A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Assess the consequences and develop mitigation (if appropriate) based on results A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: What is the geographic area affected by the project? A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: What are the resources affected by the project? A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: What are the other past, present, and reasonably foreseeable actions that have impacted these resources? A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: What were those [past, present, and RFFA] impacts? A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: What is the overall impact on these various resources from the accumulation of actions? A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Identify the significant cumulative effects associated with the proposed action and define the assessment goals A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Establish the geographic scope for the analysis A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Establish the time frame for the analysis A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Identify other actions affecting the REC A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Characterize the RECs identified in scoping in terms of their response to change and capacity to withstand stresses A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Characterize the stresses affecting these RECs and their relation to regulatory thresholds A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Define a baseline condition for the RECs A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Identify the important cause-and-effect relationships between human activities and RECs A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Determine the magnitude and significance of cumulative effects A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Modify or add alternatives to avoid, minimize, or mitigate significant cumulative effects A.Scoping B.Model C.Analysis

Merging Best Practices Which EIA component does this step best fit: Monitor the cumulative effects of the selected alternative and adapt management A.Scoping B.Model C.Analysis

Merging Best Practices Scoping: SCvM NCHRP FvA CEQ (all)

Merging Best Practices Model: SCvM NCHRP FvA CEQ n/a 5 n/a 5 - 7

Merging Best Practices Analysis: SCvM NCHRP FvA CEQ n/a 6 – 8 4 &

Merging Best Practices Bonus Disclosing and Reducing Uncertainty: SCvM NCHRP FvA CEQ 1 – 3 (all) 1, & 5 11