By: Rob Wong Peter L’Heureux Skylur Jameson Marc Driscoll.

Slides:



Advertisements
Similar presentations
Jason Thom MADCS – October Handy Reference – THE place to look it up Identify Safe Procedures Operation Records Past records can be invaluable Maintenance.
Advertisements

Copyright ©2011 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Introduction to Engineering Experimentation, Third.
The Failure of Teton Dam
The Teton Dam Failure By Matthew Reddy and Robert Cundill.
Pool Cue Marc Driscoll Peter L’Heureux Skylur Jameson Rob Wong.
1994 – 2006……?.  Largest hydroelectric dam in the world  Largest construction project for China since building the Great Wall  Chinese government claims.
Sharif University of Technology Civil Engineering Department Tehran-Iran Dam Safety An Approach to Prevent Dam Incidents.
Montana Safe Digging Law 2014 Joint Engineers Conference Thu - Nov :00am-11:30am.
Geology of Idaho The Snake River Plain. Idaho can be divided into 6 natural geologic regions, each with its own unique characteristics.
Reinforced Concrete: A Fundamental Approach, Sixth Edition By Edward G. Nawy Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey.
“Those who are not dissatisfied will never make any progress
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Unit 1 Cultural relics Period 5 Listening and talking.
Ben & Jerry's, the Vermont proprietor of ice-cream activism, has produced in the UK a limited-edition batch of apple pie-flavored pints— called "Apple-y.
Take 5 for Safety E. Lessard May 5, LANL Electrical Accident May 3, 2015  LOS ALAMOS, N.M. —Los Alamos National Laboratory workers were injured.
City of Salem Mayor Kimberley Driscoll. Budget Overview $128 million annual operating budget $128 million annual operating budget 50% of revenues supporting.
PowerPoint Slides to Accompany Applied Behavior Analysis for Teachers Seventh Edition Paul A. Alberto Anne C. Troutman ISBN: Alberto &
Engineering Mechanics: Statics, Thirteenth Edition R. C. Hibbeler Copyright ©2013 by Pearson Education, Inc. All rights reserved. EXAMPLE 9.1.
Pipeline Qra Seminar Title slide Title slide.
Limmer et al., Emergency Care Update, 10th Edition © 2007 by Pearson Education, Inc. Upper Saddle River, NJ CHAPTER 33 Ambulance Operations.
Three Gorges Project: A Project of the Century By: Xinyu Huang.
Kenneth (Kenny) Mercado Division Vice President of Distribution Electric Operations Turning on the Lights.
1 Middle East Performance Measurement & Benchmarking Conference Challenges of Measurements in Service Industry 21 st to 22 nd June 2004, Dubai Sunil Thawani.
Ford 1. Ford 2 Ford 3 Ford 4 Ford 5 Ford 6 Ford 7.
Copyright ©2011 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Chapter Cost-Benefit Analysis Concepts and Practice.
Engineering Mechanics: Statics, Thirteenth Edition R. C. Hibbeler Copyright ©2013 by Pearson Education, Inc. All rights reserved. EXAMPLE 3.1.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Copyright ©2010 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Introduction to Environmental Engineering, First Edition.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
EKG Plain Simple Plain and Simple CHAPTER Third Edition Copyright ©2012 by Pearson Education, Inc. All rights reserved. EKG Plain and Simple, Third Edition.
Engineering Mechanics: Statics, Thirteenth Edition R. C. Hibbeler Copyright ©2013 by Pearson Education, Inc. All rights reserved. EXAMPLE 11.1.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative Geneva, 8 – 10 December 2009 Flood Forecasting Issues in Ghana by J. Wellens-Mensah.
FIGURE 8-1 Generic I/O Subsystems Peter Spasov Microcontroller Technology: The 68HC11, Fourth Edition Copyright ©2002 by Pearson Education, Inc. Upper.
Take 5 for Safety E. Lessard May 12, Arc Flash Event at INL Involving Situational Awareness Barrier  On April 15, 2015, Idaho National Lab workers.
FIGURE 11-1 Bit assignments for the Timer Control, Mask, and Flag Register Peter Spasov Microcontroller Technology: The 68HC11, Fourth Edition Copyright.
THE TETON DAM FAILURE.
Southwest Florida Water Management District Association of State Floodplain Managers Orlando, Florida June 9, 2009.
Copyright ©2011 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Chapter Cost-Benefit Analysis Concepts and Practice.
SunSatFriThursWedTuesMon January
INTRODUCING S HILUV ENERGY IS OUR POWER!. W HO WE ARE ? SHILUV is a company that represents professional engineers in energy related fields of construction.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Copyright ©2011 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Chapter Cost-Benefit Analysis Concepts and Practice.
Figure A--1 Thomas L. Floyd Digital Fundamentals, 8e Copyright ©2003 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved.
Copyright ©2011 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Chapter Cost-Benefit Analysis Concepts and Practice.
U.S. Department of the Interior U.S. Geological Survey Monitoring Surface-Water-Quality in the Tongue River Watershed of Montana and Wyoming Stacy Kinsey.
Human-Environment Interaction
Figure 2--2 Key Features of the Reading Process Gail E. Tompkins Literacy for the 21st Century, 3e Copyright ©2003 by Pearson Education, Inc. Upper Saddle.
Chapter 15 What Do People in Different Jobs Do?. Human Behavior in Organizations, 2 nd Edition Rodney Vandeveer and Michael Menefee © 2010 Pearson Education,
What does a Civil Engineer do?
North Park Sandy Breuer, Director of Parks and Recreation Craig Schlichting, Director of Community Assets and Development.
Logan River Floodplain Mapping Kedric Curtis, Josh Hogge, Jordan Jarrett, Jared Justensen 4/25/2015 CEE 6190 Photo credit:
Copyright ©2011, ©2006, ©1998 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Systems Engineering and Analysis, Fifth.
Towards Sustainable and Efficient Monitoring NW Hydro Operators Forum - May 8, 2013.
© 2015 Pearson Education, Inc.
Visual Argument Practice.
©2004 by Pearson Education. ©2004 by Pearson Education.
Flood Plain Management Strategies
For each W, W, £ , describe cost – advantages and disadvantages
© 2015 Pearson Education, Inc.
DATE at LOCATION (North Lot, 2nd Floor Parking garage, etc.)
©2004 by Pearson Education. ©2004 by Pearson Education.
Incomplete Design: The Early Quest for Manned Flight
Section 2.5 Graphing Techniques; Transformations
Section 2.5 Graphing Techniques; Transformations
Can Technology Save Us? Smart pigs, SCADA, Integrity management, and Leak detection – What more could we need? Dr. Tom Bubenik, CC Technologies, Inc. –
Pipeline Incident.
The University of Adelaide, School of Computer Science


Future Flood Event 2019 Mega Flood CA Central Valley
Presentation transcript:

By: Rob Wong Peter L’Heureux Skylur Jameson Marc Driscoll

Idaho near Snake River Plain June 5, 1976 Flood control, Power Generation, Irrigation Unstable Area Overconfidence Eleven Dead $400,000,000 in damages Rexburg, Wilford, Sugar City, Salem, Hibbard

 Inadequate Monitoring Techniques  Lack of Professionalism  Overlooked Inspections  Inoperable Safety Features  Maintenance & Operations  Main outlet inoperable  Communication Errors  Workers to Designers

 Dam Supervision  Failed Cost-benefit analysis  Leak Detection  Lack of Local Support  Sited in unstable area  Communication Absence

 Rebuilding took years  Dam never rebuilt  President Ford requests $200 million  Claims Program  Ended January 1987  7,563 total = $322 million

 Voland Gerard. Engineering by Design. 2nd Edition. New Jersey: Pearson Education, Inc.,  e/case_studies_project/Teton%20Dam.htm Accessed 16 February e/case_studies_project/Teton%20Dam.htm