By: Rob Wong Peter L’Heureux Skylur Jameson Marc Driscoll
Idaho near Snake River Plain June 5, 1976 Flood control, Power Generation, Irrigation Unstable Area Overconfidence Eleven Dead $400,000,000 in damages Rexburg, Wilford, Sugar City, Salem, Hibbard
Inadequate Monitoring Techniques Lack of Professionalism Overlooked Inspections Inoperable Safety Features Maintenance & Operations Main outlet inoperable Communication Errors Workers to Designers
Dam Supervision Failed Cost-benefit analysis Leak Detection Lack of Local Support Sited in unstable area Communication Absence
Rebuilding took years Dam never rebuilt President Ford requests $200 million Claims Program Ended January 1987 7,563 total = $322 million
Voland Gerard. Engineering by Design. 2nd Edition. New Jersey: Pearson Education, Inc., e/case_studies_project/Teton%20Dam.htm Accessed 16 February e/case_studies_project/Teton%20Dam.htm