ICEPP regional analysis center (TOKYO-LCG2) ICEPP, The University of Tokyo 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo1.

Slides:



Advertisements
Similar presentations
ASGC Updated HSIN-YEN CHEN LHCONE workshop CERN 10 Feb
Advertisements

CERN – June 2007 View of the ATLAS detector (under construction) 150 million sensors deliver data … … 40 million times per second.
ATLAS computing in Geneva 268 CPU cores (login + batch) 180 TB for data the analysis facility for Geneva group grid batch production for ATLAS special.
Overview of LCG-France Tier-2s and Tier-3s Frédérique Chollet (IN2P3-LAPP) on behalf of the LCG-France project and Tiers representatives CMS visit to Tier-1.
Status report from Tokyo Tier-2 for the one year operation after whole scale system upgrade 2014/5/20Tomoaki Nakamura ICEPP, UTokyo1 Tomoaki Nakamura on.
December Pre-GDB meeting1 CCRC08-1 ATLAS’ plans and intentions Kors Bos NIKHEF, Amsterdam.
Grid Computing for High Energy Physics in Japan Hiroyuki Matsunaga International Center for Elementary Particle Physics (ICEPP), The University of Tokyo.
ALICE Tier-2 at Hiroshima Toru Sugitate of Hiroshima University for ALICE-Japan GRID Team LHCONE workshop at the APAN 38 th.
Data oriented job submission scheme for the PHENIX user analysis in CCJ Tomoaki Nakamura, Hideto En’yo, Takashi Ichihara, Yasushi Watanabe and Satoshi.
1 A Basic R&D for an Analysis Framework Distributed on Wide Area Network Hiroshi Sakamoto International Center for Elementary Particle Physics (ICEPP),
Global Science experiment Data hub Center Oct. 13, 2014 Seo-Young Noh Status Report on Tier 1 in Korea.
Status of WLCG Tier-0 Maite Barroso, CERN-IT With input from T0 service managers Grid Deployment Board 9 April Apr-2014 Maite Barroso Lopez (at)
Site report: Tokyo Tomoaki Nakamura ICEPP, The University of Tokyo 2014/12/10Tomoaki Nakamura1.
Division Report Computing Center CHEN Gang Computing Center Oct. 24, 2013 October 24 ,
SC4 Workshop Outline (Strong overlap with POW!) 1.Get data rates at all Tier1s up to MoU Values Recent re-run shows the way! (More on next slides…) 2.Re-deploy.
Computing Coordination in Japan Takashi Sasaki Computing Research Center KEK, Inter-University Research Institute Corporation High Energy Accelerator Research.
Computing for HEP in the Czech Republic Jiří Chudoba Institute of Physics, AS CR, Prague.
Data GRID Activity in Japan Yoshiyuki WATASE KEK (High energy Accelerator Research Organization) Tsukuba, Japan
Grid Applications for High Energy Physics and Interoperability Dominique Boutigny CC-IN2P3 June 24, 2006 Centre de Calcul de l’IN2P3 et du DAPNIA.
A short introduction to the Worldwide LHC Computing Grid Maarten Litmaath (CERN)
HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Steven McDonald TRIUMF Network & Computing Services Canada’s National Laboratory.
The Impact of Distance and Time in Large Scientific Collaborations Hiroshi Sakamoto, Shaping Collaboration 2006, Geneva Dec. 11th 1/19 “The Impact of Distance.
Oxford Update HEPix Pete Gronbech GridPP Project Manager October 2014.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
Site Report: Tokyo Tomoaki Nakamura ICEPP, The University of Tokyo 2013/12/13Tomoaki Nakamura ICEPP, UTokyo1.
Connect communicate collaborate LHCONE L3VPN Status Update Mian Usman LHCONE Meeting Rome 28 th – 29 th Aprils 2014.
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 25 th April 2012.
Data transfer over the wide area network with a large round trip time H. Matsunaga, T. Isobe, T. Mashimo, H. Sakamoto, I. Ueda International Center for.
John Gordon STFC-RAL Tier1 Status 9 th July, 2008 Grid Deployment Board.
WLCG Service Report ~~~ WLCG Management Board, 1 st September
LCG-France Vincent Breton, Eric Lançon and Fairouz Malek, CNRS-IN2P3 and LCG-France ISGC Symposium Taipei, March 27th 2007.
TRIUMF a TIER 1 Center for ATLAS Canada Steven McDonald TRIUMF Network & Computing Services iGrid 2005 – San Diego Sept 26 th.
KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.
Status of ATLAS T2 in Tokyo
1.Output – Summary Workshop (up to 2006) - Summary Reports from each Project Leaders/Sub-leaders are requested by the end of December, 2006 are requested.
Alberto Aimar CERN – LCG1 Reliability Reports – May 2007
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
ATLAS Bulk Pre-stageing Tests Graeme Stewart University of Glasgow.
7 March 2000EU GRID Project Proposal Meeting CERN, M. Lokajicek 1 Proposal for Participation of the Czech Republic in the EU HEP GRID Project Institute.
SINET Update and Collaboration with TEIN2 Jun Matsukata National Institute of Informatics (NII) Research Organization of Information and Systems
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
LCG Service Challenges SC2 Goals Jamie Shiers, CERN-IT-GD 24 February 2005.
Status of Tokyo LCG tier-2 center for atlas / H. Sakamoto / ISGC07 Status of Tokyo LCG Tier 2 Center for ATLAS Hiroshi Sakamoto International Center for.
Connect. Communicate. Collaborate LHCOPN lambda and fibre routing – Episode 3 Michael Enrico Network Engineering & Planning Manager DANTE LHC Meeting,
WLCG Service Report Jean-Philippe Baud ~~~ WLCG Management Board, 24 th August
M.C. Vetterli – WLCG-CB, March ’09 – #1 Simon Fraser WLCG Collaboration Board Meeting Praha, March 22 nd, 2009 Thanks to Milos for hosting us.
Summary of SC4 Disk-Disk Transfers LCG MB, April Jamie Shiers, CERN.
WLCG Service Report ~~~ WLCG Management Board, 10 th November
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Grid Computing Jeff Templon Programme: Group composition (current): 2 staff, 10 technicians, 1 PhD. Publications: 2 theses (PD Eng.) 16 publications.
KISTI activities and plans Global experiment Science Data hub Center Jin Kim LHCOPN-ONE Workshop in Taipei1.
ATLAS Computing: Experience from first data processing and analysis Workshop TYL’10.
LHCOPN lambda and fibre routing Episode 4 (the path to resilience…)
WLCG Tier-2 Asia Workshop TIFR, Mumbai 1-3 December 2006
LHCOPN/LHCONE status report pre-GDB on Networking CERN, Switzerland 10th January 2017
ICEPP, University of Tokyo
Computing Operations Roadmap
Status report on LHC_2: ATLAS computing
Status Report on LHC_2 : ATLAS computing
LHCOPN update Brookhaven, 4th of April 2017
Update on SINET5 implementation for ICEPP (ATLAS) and KEK (Belle II)
LCG Deployment in Japan
NREN update NREN: SINET5/NII Country: Japan
Dagmar Adamova, NPI AS CR Prague/Rez
Project: COMP_01 R&D for ATLAS Grid computing
LHC Data Analysis using a worldwide computing grid
4 Years Milestone plan – (Company Name)
Jan. 24th, 2003 Kento Aida (TITECH) Sissades Tongsima (NECTEC)
Presentation transcript:

ICEPP regional analysis center (TOKYO-LCG2) ICEPP, The University of Tokyo 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo1

History of ICEPP regional analysis center 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo2 Discussion in the ATLAS-Japan group on the possibility of having a regional computing center in Japan. 1999: ICEPP, University of Tokyo decided to take the responsibility. 2001~2005: R&D work. 2005: Preparation of a computer room and an UPS room in School of Science Bldg : Deployment of the first computer system (3-year lease for ). 2009: Upgrade to the second system (3 year lease for ). Dec. 2012: Upgrade to the third system (3 year lease for ). Discussion in the ATLAS-Japan group on the possibility of having a regional computing center in Japan. 1999: ICEPP, University of Tokyo decided to take the responsibility. 2001~2005: R&D work. 2005: Preparation of a computer room and an UPS room in School of Science Bldg : Deployment of the first computer system (3-year lease for ). 2009: Upgrade to the second system (3 year lease for ). Dec. 2012: Upgrade to the third system (3 year lease for ). Member Tetsuro Mashimo (physicist):Local resource, CASTOR, Procurement, LSF Nagataka Matsui (technical staff):Local resource, AFS, GPFS, LSF Tomoaki Nakamura (physicist):Tier2 services, ATLAS analysis environment Hiroshi Sakamoto (physicist):ADCoS leader for AP region Ikuo Ueda (physicist):ADC operation System engineers, 2FTEs by 3 persons (from company)

Contribution to ATLAS jobs 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo3 Fraction of completed jobs [%] [per 6 months] 50 million ATLAS jobs have been completed per 6 months in WLCG for each production and analysis. ATLAS collaboration:~3000 ATLAS-Japan:~110 Contribution target:3~4% The last bins indicates effect of extra contribution (2560 cores) only for the production jobs. This is manly for the rush period for ICHEP2012. Total 3712 cores were deployed by the end of from Jun to Dec

2nd system ( ) 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo4 WNs Disk Arrays ~270 m 2

Removing almost all HWs in two days 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo5

3rd system ( ) 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo6

2nd system vs. 3rd system 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo7

WAN for TOKYO 2013/5/15Tomoaki Nakamura ICEPP, Univ. of Tokyo8 TOKYO ASGC BNL TRIUMF NDGF RAL CCIN2P3 CERN CANF PIC SARA NIKEF LA Pacific Atlantic 10Gbps WIX Additional new line (10Gbps) from the end of March 2013 OSAKA 40Gbps 20 Gbps 10 Gbps Amsterdam Geneva Dedicated line 14:50 Overview of the SINET 20' Speaker: Prof. Motonori Nakamura (NII) 14:50 Overview of the SINET 20' Speaker: Prof. Motonori Nakamura (NII)