望遠鏡の運用状況 友野大悟. CAUTION Telescope is becoming unstable.

Slides:



Advertisements
Similar presentations
Highly Efficient Operations Keck Scientific Strategic Planning 2009 Hilton Lewis T. Armandroff, S. Adkins, R. Goodrich J. Johnson, K. Kinoshita, R. Matsuda.
Advertisements

MIS 2000 Class 20 System Development Process Updated 2014.
Plans for Diagnostic Removals, Storage, and Re-installations during NSTX Upgrade Outage B. Stratton NSTX Team Meeting 9/13/2011.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
December 21-22, 2005Subaru Users Meeting, Mitaka Status of Remote Observation / Service Observation Junichi Noumaru Subaru Telescope National Astronomical.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
LogicBlox Organizing Telecom Business Knowledge Presented by ConfluentMinds Solutions Pvt Ltd.
1 Software Maintenance and Evolution CSSE 575: Session 1, Part 1 Course Introduction Steve Chenoweth Office Phone: (812) Cell: (937)
© Nintendo Game Document Game Development - Spring
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Unit 1 Physics Detailed Study 3.1 Chapter 10: Astronomy.
Automated Beverage Dispenser Georgia Institute of Technology April 24, 2009 Katrina Kumm Mike Fojas Mark Peterson Nick White Nick Migliaccio.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
MCAO Adaptive Optics Module Mechanical Design Eric James.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
STARS 2 Tom Winegar - National Astronomical Observatory of Japan Subaru Telescope Archive University of.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
Maintenance Overhaul Shops (off-Aircraft)
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
LBT Q Engineering and Software Review ENGG Engineering General.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki 1 Machine Learning.
January 2008: Subaru Users' Meeting Current status of Subaru Telescope Summary –Some glitches are expected while leased computers are being replaced (February.
DHHS COE Meeting Agenda May 16, 2012 Welcome Introductions Contract Compliance Reporting Open Window Updates Questions and Answers.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
The Changing World of Software Watts S. Humphrey Presentation by Cuong Nguyen.
July 22, 2009 Sunflower Project Monthly Conversion Meeting – July.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Telescope Optical Units (TOUs) Isabella Pagano (TOU PM) TOU Team Meeting Catania 11 June 2014.
Program Development Cycle
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
NSTA Web Seminar: Inspire Your Students to Solve the Challenges of Space Presented by: Sharon Bowers, Todd Toth and Mark Clemente LIVE INTERACTIVE LEARNING.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
LBT Q Engineering and Software Review ENGG Engineering General.
Phobos Magnet Status Leslie Rosenberg & Patrick Decowski, MIT Technical Advisory Committee November 1998.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
Oct 17, 2001SALT PFIS Preliminary Design Review Management, Schedule, & Budget 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Management,
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Unit 2 Lesson 3 Technology Systems. Big IDEA Big Idea: There are nine “Core Technologies” that are fundamental to all technology systems that must be.
Unit 2 Lesson 3 Technology Systems. Big IDEA Big Idea: There are nine “Core Technologies” that are fundamental to all technology systems that must be.
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
1 Chapter 5 Software Reliability Software Engineering: Design, Reliability, and Management, International Std. Edition by Martin L. Shooman.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. Event number: Event password: 2015B13 To hear the presentation.
Budget Budget Contingency/ Cost Risks Descope Options
Management Breakout: MREFC Budget Summary Victor L
Pennant Accounts Warehouse Data Review September 22, 2015
(Science Operation Division Chief)
Science Operation Report FY2017
Infor EAM in the Handling Engineering Group at CERN
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Monthly Director’s Report
Instrument Overview Larry Springer HMI Program Manager
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

望遠鏡の運用状況 友野大悟

CAUTION Telescope is becoming unstable

Agenda l Unstable operation due to –Age of mechanics and electronics –Increased work load for new instruments l What to expect in coming years –Modification of telescope in summer 2010 –Commissioning of HSC in summer 2011 –Replacement for the space of AO36?

Old mechanisms and electronics l Troubles on POpt AGSH Probe X axis l Problem on acquisition of star on NsIR AG –Image rotator? l Pointing error due to azimuth rail? l Instability of Time Code Generator l Old hardware for TWSs l etc

Work load from STN3 l Less reliable connection from home for night support l Change of URLs –.sum.naoj.org –.subaru.nao.ac.jp l Lost documents l Transferring data from STARS

Work load from HSC l Unexpected increase of work load from around June 2008 l Detailed technical questions to overcome limits in weight, size, and cost l Required to manage tasks that will be done by engineers in Hilo and Mitaka, with coordinating with those done by the contractor

What to expect in FY l Modification of telescope in summer 2010 –a couple of months of down time l Commissioning of HSC in summer 2011 –a few months of down time l Schedule and work items are still under study –Earlier work on top unit exchanger?

What to expect in FY l Replacement for the space of AO36? –Electronics and optics for AO36 will be removed from the telescope in a couple of years –The AO layer above Cassegrain focus is a good place for e.g. Better AG l Any suggestions for replacement subsystems are welcome!

Summary - our apologize, but... l Please expect more down time in the coming years despite the hard working engineers and technicians due to –Troubles –Longer lead time from additional work loads l Work items in coming years are to be studied l Ideas to replace AO36 are welcome