PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.

Slides:



Advertisements
Similar presentations
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Advertisements

11th April 2008TOF DA & ppChiara Zampolli. DAQ-DA Three DAQ-DAs implemented, deployed, validated, and tested: TOFda TOFnoiseda TOFpulserda DCS-DA One.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
Chiara Zampolli in collaboration with C. Cheshkov, A. Dainese ALICE Offline Week Feb 2009C. Zampolli 1.
STAR HFT STAR Collaboration Meeting - LBNL IST Software Status Yaping Wang (University of Illinois at Chicago) Outline Offline software infrastructure.
SSD Status P. Christakoglou (NIKHEF-UU) for the SSD collaboration Thanks to: Marco vL, Enrico, Mino, Marek and Massimo.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
PHOS calibration in CDB framework M.Bogolyubsky, Y.Kharlov B.Polichtchouk, S.Sadovsky IHEP, Protvino ALICE off-line week 3 October 2005.
PHOS offline status report Yuri Kharlov ALICE offline week 7 April 2008.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Offline report – 7TeV data taking period (Mar.30 – Apr.6) ALICE SRC April 6, 2010.
107-July-2008ALICE Offline Week EMCAL Offline Status J.L. Klay Cal Poly, San Luis Obispo Offline Week - 07/July/2008.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
PHOS offline status report Dmitri Peressounko ALICE offline week,
HMPID offline status report D. Di Bari, L. Molnar, G. Volpe ALICE Offline Week, CERN, 22 June 2009.
1 ITS Quality Assurance (& DQM) P. Cerello, P. Christakoglou, W. Ferrarese, M. Nicassio, M. Siciliano ALICE OFFLINE WEEK – April 2008.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
C. Oppedisano, 9 October 2007, ALICE Offline Week 1 RECONSTRUCTION ALGORITHM CALIBRATION OBJECT ESD STRUCTURE ONGOING TASKS.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
EMCAL : Online Software Status 1) General info/intro 2) DCS-related: detector configuration, Data Points 3) DAQ: Detector Algorithms 4) QA, AMORE 5) Offline-related:
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
TPC QA + experience with the AMORE framework Marian Ivanov, Peter Christiansen + GSI group.
Hycal Energy Resolution, Timing, &Trigger Efficiency, A cumulative study. Chris Mauney.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – March 15th 2010.
Features needed in the “final” AliRoot release P.Hristov 26/10/2006.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Status of the Shuttle Framework Alberto Colla Jan Fiete Grosse-Oetringhaus ALICE Offline Week October 2006.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
Javier Castillo 1 Muon Embedding Status & Open Issues PWG3 - CERN - 15/02/2011.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – October 20th 2008.
Quality assurance for TPC. Quality assurance ● Process: ● Detect the problems ● Define, what is the problem ● What do we expect? ● Defined in the TDR.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
Ssd simulation status : preparation for embedding Jonathan Bouchet Svt Meeting : 09/19.
Some topics for discussion 31/03/2016 P. Hristov 1.
D. Elia (INFN Bari)Offline week / CERN Status of the SPD Offline Domenico Elia (INFN Bari) Overview:  Response simulation (timing info, dead/noisy.
AliRoot survey: Calibration P.Hristov 11/06/2013.
D. Elia (INFN Bari)ALICE Offline week / CERN Update on the SPD Offline Domenico Elia in collaboration with H. Tydesjo, A. Mastroserio Overview:
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
V4-19-Release P. Hristov 11/10/ Not ready (27/09/10) #73618 Problems in the minimum bias PbPb MC production at 2.76 TeV #72642 EMCAL: Modifications.
CALIBRATION: PREPARATION FOR RUN2 ALICE Offline Week, 25 June 2014 C. Zampolli.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
January 2009 offline detector review - 2 nd go 1 ● Offline – Geometry – Material budget – Simulation – Raw data – OCDB parameters – Reconstruction ● Calibration.
V4-18-Release P. Hristov 21/06/2010.
Christoph Blume Offline Week, July, 2008
Massimo Masera INFN sezione di Torino
Calibrating ALICE.
v4-18-Release: really the last revision!
Commissioning of the ALICE HLT, TPC and PHOS systems
ZDC Status Report Outline C. Oppedisano E. Scomparin
ALICE Offline Week, CERN
EMCal Offline Code Status: Introduction and tasks
TPC status - Offline Q&A
SDD in February ‘08 cosmic run
CMS Pixel Data Quality Monitoring
Presentation transcript:

PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008

Simulation Status of PHOS FEE is still being changed: – Simulation of PHS raw data needs flexible handles instead of hard-coded parameters Physical parameters of the first PHOS module differs from the designed ones: – PHOS crystal light yield and related parameters should be changeable without recompilation of the code A class AliPHOSSimParam supplies various simulation parameters to PHOS. 7 July 2008PHOS offline status2

Steering the simulations (as of offline week Apr-2008) AliPHOSSimParam sets PHOS simulation parameters: Float_t fLightYieldMean ; // Average number of // photoelectrons per GeV Float_t fIntrinsicAPDEfficiency; // APD efficiency including // geometric coverage Float_t fLightFactor ; // Average number of photons // collected by APD per GeV Float_t fAPDFactor ; // factor relating light // yield and APD response Float_t fAPDNoise; //RMS of APD noise Float_t fEMCDigitThreshold ; //minimal energy to keep digit Float_t fEMCADCchannel ; //width of ADC channel in GeV Float_t fTOFa ; //constant term of TOF resolution Float_t fTOFb ; //stochastic term of TOF resolut. 7 July 2008PHOS offline status3

PHS FEE: raw data simulation {energy, time, id} is converted to 2 pulses as ALTRO samples, High Gain and Low Gain AliPHOSPulseGenerator: – Parameters of the signal shaper – Parameters of ALTRO sampling: Noise Pedestal Number of samples Number of presamples Now all FEE parameters are hard coded. Last week a necessity to change the parameters without recompilation of the code has been realized (namely, the number of samples can vary up to 1023). A redesign of AliPHOSPulseGenerator will be done to provide the required flexibility. 7 July 2008PHOS offline status4

PHOS configuration for PDC08 in Config.C if (iPHOS) { //=================== PHOS parameters =========================== AliPHOS *PHOS = new AliPHOSv1("PHOS", "IHEP"); //Set simulation parameters different from the default ones. AliPHOSSimParam* simEmc = AliPHOSSimParam::GetInstance() ; // APD noise of warm (+20C) PHOS: Float_t apdNoise = 0.012*2.5; simEmc->SetAPDNoise(apdNoise); //Raw Light Yield at +20C simEmc->SetMeanLightYield(18800); //ADC channel width at +18C. simEmc->SetADCchannelW(0.0125); } Simulation parameters are set in Config.C. Might be better to store them in OCDB. 7 July 20085PHOS offline status

PHOS geometry for 2008 One PHOS module is installed at 6 o’clock Position of the module is measured w.r.t. the ALICE global reference system ( ): An ascii table with survey data in ALICE global reference system was provided by the survey team. A class to convert this table to AliAlignObjAngles is ready (T.Pocheptsov). Now it is testing for consistency, overlaps, etc (G.Shabratova). Real centerIdeal center X, mm130 Y, mm Z, mm July 20086PHOS offline status

More about geometry In May a request from P.C. has been passed to PHOS to provide a single PHOS module for simulations in PDC, as a geometry-as-built. Now the option to set an arbitrary number of modules in arbitrary configuration is provided: –AliPHOS *PHOS = new AliPHOSv1("PHOS", “PHOS3_noCPV"); –AliPHOS *PHOS = new AliPHOSv1("PHOS", “PHOS345_noCPV"); However, we asked to leave all 5 modules for PDC08. A few overlaps/extrusions have been discovered by Andreas. Now fixed. 7 July 2008PHOS offline status7

1 module at 6 o’clock 7 July 2008PHOS offline status8

PHS raw data PHS raw data simulation and reconstruction did not change Real mapping differs from the ideal one: Cables will not be reconnected till the end of 2008 New mapping is to be provided for reconstruction and DA: Renaming the 4 mapping files is sufficient. It will be done as soon as next data is taken. 7 July 20089PHOS offline status Expected Equipment IDActual Equipment ID

CPV raw data Now CPV raw data simulation is implemented (in svn trunk since 7 July 2008): – AliPHOSCpvRawWrite – a new class – AliPHOS::Digits2Raw – updated for CPV raw data CPV mapping: – 1 CPV module is 1 DDL, total 5 CPV modules – 1 DDL is divided into 16 row – 1 row is 10 Dilogic chips – 1 Dilogic ship is 48 (=6x8) pads In total, 7680 pads per module Reconstruction of CPV raw data will come next 7 July PHOS offline status

On-line processing Two DA are implemented: – Relative gain equalization by mean deposited energy and HG/LG ratio (PHOSGAINda.cxx) – Bad channel map The algorithmic code for DAQ DA and HLT DA is identical – AliPHOSRcuDA1 – AliPHOSDA2 The histograms produced by DAQ DA and HLT DA are identical and scalable – due to per-RCU parallelization of DA in HLT, each process produced histograms for ¼ of PHOS module. DA is embedded to DAQ and HLT environments: data reading and decoding are different. There is only one preprocessor for all DAs, independent on HLT/DAQ environment 7 July 2008PHOS offline status11

DA deployment in DAQ PHOSGAINda is deployed in P2 on the DQM DAQ machine DA processes data from PHYSICS and STANDALONE runs This DA is permanently running for taken data in P2 PHOS still runs stand-alone, therefore Shuttle does not pick up DA’s histograms 7 July 2008PHOS offline status12

PHOS HLT at P2 PHOS HLT is fully operational at P2 – Basic chain providing on-line monitoring running without a single stop for a week 7 July PHOS offline status

Zero Suppression in HLT Software “zero suppression” possible in HLT – Not on a sample level at this point, behaving more like a sparse scan – Possible to implement on sample level if needed 7 July PHOS offline status

HLT Reconstruction Energy and timing extraction Clustering for HLT has been implemented – Based on the algorithm used by off-line Most of the off-line reconstruction has been ported to HLT during the last weeks – Not been sufficiently tested and debugged 7 July PHOS offline status

PHOS HLT DA Running on HLT using same code as off-line Porting of offline code provides possibility to do more advanced physics calibration Needs more testing with the FXS 7 July PHOS offline status

HLT On-line Monitoring Using PHOS HLT Online Monitoring used for debugging and visualisation Integration into AliEVE started (first version routinely used) With new ported reconstruction better visualisation and performance monitoring is possible 7 July PHOS offline status

HLT On-line Monitoring 7 July PHOS offline status

About DCS DP A set of DCS DPs which are potentially useful for offline reconstruction was submitted to the Shuttle team a year ago No correction of calibration parameters is expected for DCS DPs. The DCS DPs might be useful (but not mandatory) to see for reference, if some unexpected data appears. PHOS PVSS is being integrated in P2 with very little manpower (0.25 FTE). No DCS DPs are monitored, nor archived at the moment. Shuttle looks for declared DPs, does not find them and stops any actions of the PHOS preprocessor. Due to missing DCS DPs, the DAQ DA and HLT DA are not validated yet. In SVN trunk, AliPHOSPreprocessor::ProcessDCS() returns kFALSE AliPHOSPreprocessor::ProcessDCS() can check the existence of DPs which provides more flexibility. PHOS can survive without DCS preprocessor (this year). 7 July 2008PHOS offline status19

Reconstruction parameters The framework for detector reconstruction parameters is being developed (Cvetan) AliPHOSRecoParam is inherited from AliDetectorRecoParam. EMC and CPV reco parameters were merged into one object All PHOS code has been changed to follow the reco parameters framework. Submitted to Cvetan. Validation will be performed after committing the framework to CVN. 7 July 2008PHOS offline status20

QA QA histograms are filled at every step of simulation and reconstruction: – Hits – Digitization – Raw data – Local reconstruction – ESD filling So far the quality is checked “by eyes”. No quantitative criteria is provided yet. No reference objects are created nor stored in OCDB 7 July 2008PHOS offline status21

dotProject 7 July 2008PHOS offline status22