Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 1 Leilehua Ave.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Macon Campus Construction Presentation April 2007.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Twelve flowers of the year
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
45 th Ave S Shared Street Design Commission September 17 th, 2009 Megan Hoyt SDOT Traffic Operations.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
MERTON HIGH STREET MATTHEW EALES. 2 Background Southern Gas Networks have been repairing leaks in Merton High Street over a number of years resulting.
CTP1 Lane/Road Closures beginning 12/27/ W Vickery Blvd 12/27/11 Road closed between Forest Park and Summit 15 th Ave 12/27/11 Road closed at IH30 turn.
© red ©
Signal Timing Design Example Problems. Intersection of Michigan Avenue and Hewitt Road.
2.75 Miles Route A 2.75 Miles Route A Presidential SP Quarter mile markers are marked with orange circles at the locations designated
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Traffic Lights Road Signs Road Markings
Chapter 2 Signs, Signals, and Roadway Markings
Chapter 2 Notes Traffic Signs.
SECTION 3. Centerline and Edge Line Final Rule DECEMBER 1999.
APPENDIX OF MANUAL DRIVER SAFETY.
Current Construction Projects Major Projects Pinellas County.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
MAY 8, 2012 BCC PUBLIC HEARING ON BZA # SE , Nov. 03, 2011 APPLICANT: CHANTEL PRESTON APPELLANT: SHAWN R.H. SMITH, Esq., (AGENT FOR CHANTEL PRESTON)
Chapter 2 Signs, Signals, and Roadway Markings
Traffic Lights Road Signs Road Markings. Do Now… True or False  A stop sign is shaped like a triangle.  A broken yellow line means that you can pass.
Is this a square or a pentagon? It is a square.
CHAPTER 2 – NJ DRIVER TESTING. BASIC DRIVER LICENSE REQUIREMENTS 6 POINTS OF IDENTIFICATION VISION TEST: 20/50 VISION WITH OR WITHOUT CORRECTIVE LENSES.
Traffic Signs Part Two. What do these 2 signs tell you?
Instructions for Cell Cycle Foldable
Lesson 2.3 Today’s Objectives: Describe the difference between broken yellow lines and broken white lines. Explain the differences between a shared left-turn.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
GARDEN PARK ESTATES Traffic Calming Circle Modifications February 7, 2013 Presented By: Ricky Templet, Jefferson Parish Councilman District 1.
Scranton/Carter Road Reconstruction
What colour?.
Instructions for Cell Cycle Foldable
Drive Right Chapter 2 Unit 1
Safety Colors Quiz.
DICKINSON AVENUE RECONSTRUCTION
Runestone Area Education District #
© T Madas.
Concept Sketch of a Bicycle Priority Lane a) Multilane Street, along a Parking Lane When along a parking lane, right edge of bicycle priority lane is 10.
2017 PCA CAR POOL PLAN.
Colors.
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
PLANNING FOR THE 2017/18 SAGE 2YC
SW Gage Blvd - Street Repair Project
Signs Test.
Election #1 Popular Vote Electoral Vote State Red Yellow
Name: _______________________________
160 WATER STREET TOWN OF MATTAWA 160 WATER STREET
Creating a Usable Periodic Table of Elements
Instructions for Cell Cycle Foldable
Average Number of Photons
SE 12th Street Roadway Improvements February 8, 2005.
Can I color yellow?. Can I color yellow?
Safety Colors Quiz.
Be Thankful! Kindergarten Happenings! Reminders A look at our week!
What Color is it?.
29th & Choctaw Rd Project Projected time line.
Calendar Time.
While you have measured the resistance of a resistor,
Remember the traffic rules.
Slow Moving Vehicle Safety Program
Let’s Learn the Basic Colors
Nine Mile Ride – Project Timeline


Presentation transcript:

Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 1 Leilehua Ave between Macomb Road and Kline/Gordon Lane will be closed from November The lanes highlighted in yellow between Leilehua Ave and Waianae Ave will be made 2-way for residents only. Closures will be 24/7. On the lanes highlighted in yellow, there will be no parking on the Leilehua bound side of the road and no parking within 100 ft from Leilehua Ave. McCornack Road Stoneman Field Macomb Rd Kline Rd Gordon Rd Curb Work Concrete curb repair has been completed between 19 October – 5 November 2015.

Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 2 Leilehua Ave between the Kline/Gordon Lane and the Stoneman Field Road will be closed from November There will be no access to the parking of SB 645, Family and Child Care. The lanes highlighted in yellow between Leilehua Ave and Waianae Ave will be made 2-way for residents only. Closures will be 24/7. On the lanes highlighted in yellow, there will no parking on the Leilehua bound side of the road and no parking within 100 ft from Leilehua Ave. McCornack Road Stoneman Field Kline Rd Gordon Rd

Leilehua Ave Revised - Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks Phase 3 Leilehua Ave between McCornack and the Stoneman Field Road be closed from 25 November to 4 December The lanes highlighted in yellow between Leilehua Ave and Waianae Ave will be made 2-way for residents only. Closures will be 24/7. On the lanes highlighted in yellow, there will no parking on the Leilehua bound side of the road and no parking within 100 ft from Leilehua Ave. McCornack Road Stoneman Field

Leilehua Ave Revised- Road Closure at Leilehua Ave 10 November 2015 – 10 December 2015 (24 hours, 7 Days a week) Schofield Barracks McCornack Road Stoneman Field Striping Striping will be performed from 9-10 December There will be moving lane closures along Leilehua Ave. Flagmen will direct traffic. Morris Rd Mc Andrew Rd Top Lift Paving Phase B Leilehua Ave between Morris/McAndrew and McCornack will be closed on 8 December 2015 (red). The lanes between Leilehua Ave and Waianae Ave highlighted in yellow will be made 2-way for residents only. The closures will be from Top Lift Paving Phase A Leilehua Ave between Macomb and Morris/McAndrew will be closed on 7 December 2015 (orange). The lanes between Leilehua Ave and Waianae Ave highlighted in blue will be made 2- way for residents only. The closures will be from Note: During Top Lift Paving Phase A, there will be no parking in the Leilehua bound direction of the blue lanes and no parking within 100 ft of Leilehua Ave. During Top Lift Paving Phase B, there will be no parking in the Leilehua bound direction of the yellow lanes and no parking within 100 ft of Leilehua Ave.