RARF QnA Session November 1, 2007. General Information EDS 4-1 RARF due on Friday, November 9, 2007. This includes pink, blue, white cells. (Also should.

Slides:



Advertisements
Similar presentations
Welcome to EXPRESS Your Online Enrollment Tool Guided Tour Please use the Navigation Buttons at the bottom of each screen to proceed through the tour and.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Testing Workshop: Reactive Capability Testing
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
1 New Generation Commissioning Emal Latifzai Operations Support Engineer New Generation Information Forum ERCOT Public November 4, 2014.
National Service Trust Automation Project Training Materials: Members and Alumni Corporation for National & Community Service (CNCS) National Service Trust.
How to Submit a Matching Gifts Application.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 16, 2010.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
RARF QnA Session April 17, Resource Registration Process and Schedule Final RARF forms sent during week of April 7 –New Resources should get blank.
Load Resource Inputs to the Multi-Interval Real-Time Market ERCOT is requesting input from LRs and QSEs to enable running meaningful MIRTM simulations.
Sai Moorty ERCOT Integration Options into ERCOT systems.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
1 Cutover Daily Call 4:30 PM November 23, :30.
Workshop: Reactive Power Testing:
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Lead from the front Texas Nodal 1 Registration Deep Dive Overview / Kick Off Sept 25, 2008.
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
Optimizing Deployment of CCGT Duct Firing Capacity in the Nodal Market Josh Clevenger Brazos Electric Cooperative.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Rent Reasonableness Tuesday, September 11, 2012 Connect to Audio: Dial Enter Participant Code # Please mute your phones before the.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
1 Update to NATF on Resource Registration Feb 2, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
Steady-State Working Group: Resource Modeling Discussion Wes Woitt September 27 th, 2011.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
1 Nodal Stabilization Market Call December 27, 2010.
1 Cutover Daily Call 10:30 AM November 23, :30.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
1Texas Nodal Update on Disclosure Issues, including NMMS/RARF Data Discussion ERCOT Staff October 27, 2009.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
October 29, 2012 RARF Workshop 2 ERCOT RARF Data Request Issues Jay Teixeira Manager, Model Administration.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Lead from the front Texas Nodal 1 Texas Nodal Registration meeting- RARF Question &Answer Matt Mereness August 9 th, 2007.
Issues with Reactive Testing and the NDCRC S. Looney QMWG, 11/5/2012.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
GUIDE ON HOW TO REGISTER AND GET THE AWARDS.
Market Trials Update NATF March 2,
DART Request Training for Korea Account Managers
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Resource Registration Update
DART Request Training for Australia Distributors
Presentation transcript:

RARF QnA Session November 1, 2007

General Information EDS 4-1 RARF due on Friday, November 9, This includes pink, blue, white cells. (Also should include EDS 3 data) EDS 4-2 RARF due later this year. This includes gray cells.

Reference Information Guide and white papers available at ents/index.html ents/index.html ents/index.html Optional help sessions available 9-12 M-F through November 9. Send to to request a time.

Resource Parameter Questions –How do we fill this out for wind resources? N/A for now; how RUC works with wind resources is still a question. –How do we fill this out for combined cycle resources, as breaker close is before we reach LSL and before the steamer is on? –What if there are multiple breakers? –Are these times additive or overlapping? –If I enter zero as minimum online time, will I get startup costs if I am pulled offline before I close the breaker? Enter a 1 to ensure you run. –All time is in hours.

Resource Parameter Questions –How do I fill this out? Sample in the guide –Does every point have to be filled in? No. The systems will extend the rates of the first MW back to zero and the last MW to infinity. All numbers are positive. –What if my normal and emergency ramp rates are the same? That is ok. Please enter same information in both sections –How does the Reasonability Ramp Rate fit in? It is used for data validation.

Seasonal Net Max Ratings What are the seasonal sustainable and emergency ratings? –PMAX. Net = Generation less auxiliary. The ones in pink is used in Nodal systems while the rest are planning numbers How are these used by Nodal systems?

Reactive Capability Questions Where do I get this curve? –Generator manual, known as the D-curve. We will put an example in the guide. What is the Net Maximum Leading/Lagging Operating Capability? –Need to determine if this is still required.

Transformer Questions What if there is one transformer for multiple units? –Enter data once What if there are multiple transformers for one unit? –Attach additional information Where would I find the transformer information? –Nameplate, manual, test records

Planning Questions Auxiliary load –Define large and small motor –Accuracy of this data –Where do we define the total MW/MVAR of Aux Load?

Planning Questions Subsynchronous Resonance –Please provide additional information on what this is and when it will be used. Does not have to be submitted by end of year, but please include a plan on what/how/when you may obtain the data. ERCOT will include additional information in the guide.