API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – 281-387-7874 cell National Oilwell.

Slides:



Advertisements
Similar presentations
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Advertisements

API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Page 1Version 2.1 Request for conditional approval Information required to support request for conditional approval to forward a draft standard IEEE 802.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Value Stream Mapping: August 2005 Current State Nancy Terranova October 26, 2006.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
SC18:TG8 API Specification Q1 Guidance Document.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Doc.: IEEE /0648r5 Submission July 2007 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2007 Date: Authors:
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
San Francisco, CA. SC8 Liaison Report
Legal Module Release Date: June 27, Legal Module Introduction  Enhance existing functionality to streamline the Legal module  Legal Record  Legal.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /262r1 Submission July 2002 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
2013 Voting Statistics 2014 Election Information Red Knights International Firefighter Motorcycle Club Thomas L Caisse Chair – Nominations Committee 24.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
1 Vascularized Composite Allograft (VCA) Transplantation Committee Fall 2015 Update.
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Month Year IEEE Motions in July, 2017 Plenary
Task Group 19LH Liner Hanger Equipment
Task Group API 19SS Sand Screens
IEEE 1914 NGFI IEEE RoE TF Opening Report
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
API 16F June 2017 Specification for Marine Drilling Riser Equipment
API S64 Summer Conference Update.
Status Update on API 16Q / 16R / 16F
API SC6 Valves and Wellhead Equipment
ISO TC64/SC4/WG2 June 2010 status
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Specification on float equipment
RAISING PERFORMANCE. TOGETHERTM
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API Summer Standardization Conference
IEEE Motions in July Plenary DCN:
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
Task Group J Midweek Report
API Standard 53 Update June 2017
Month Year IEEE Motions in July Plenary DCN:
API 16 AR Specification for Drill-through Equipment Remanufacturing
Specification on float equipment
LMSC Policy and Procedures Update
API 10 F.
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
Sheung Li Task Group J Chairperson March 19, 2004
Float Equipment API Spec 10F
IEEE ac – May 2013 First Sponsor ballot closed on May 5, 2013.
Task Group Status January 2013
API 16C Choke and Kill Equipment
API 16A January 24, 2019 Winter Conference – San Antonio
API RP 59 Well Control Operations Chair – Tom Proehl
API Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
TGaq Closing Report Date: Authors: July 2015 July 2015
TGaj editor report for Sponsor Ballot
Presentation transcript:

API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – 281-387-7874 cell National Oilwell Varco

API 16F API 16 F – Specification for Marine Drilling Riser Equipment First Edition, August 2004

API 16F Status Currently working on rewriting the entire document. Estimated date for complete document to go to ballot 4th quarter of 2015 Currently two addendums closed ballot on June 11 2014. Currently working on another addendum to address section 10 drape hose and jumper line issue. Currently all hoses and jumper lines go to API 16C.

API 16F Addendum Addendum is to clarify two API 16F sections Section 7 Remove reference to the tensioning foundation in API 16F. Ballot closed on June 11, 2014 Ballot passed with 13 yes, 1 no, 1 abstain, 4 didn’t vote. There are 3 comments that need to be addressed.

API 16F Section 14 Current API 16F stated riser running equipment to be designed and tested per API 8C. Addendum remove riser running equipment from API 8C and put all design for riser running equipment into API 16F. Ballot closed June 11, 2014. Ballot passed with 14 yes, 0 no, 2 abstain, 3 didn’t vote. 32 comments that need to be addressed.