Beam Delivery configuration materials to start discussion Andrei Seryi, Deepa Angal-Kalinin, Hitoshi Yamamoto BDS area GDE meeting at KEK, January 19-20,

Slides:



Advertisements
Similar presentations
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
Beam Delivery, MDI related updates Andrei Seryi for BDS Area GDE/LCWS meeting at Bangalore March 10, 2006.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Overview of Extraction Line Designs and Issues
Beam Delivery System Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi for BDS Area review video meeting March 28, 2006.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
September 20, 2006 Global Design Effort 1 Process of change of BDS baseline to 14/14 configuration BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto,
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Photon collider: ILC configuration and IR issues ( how to make 14mr compatible with gamma-gamma) Valery Telnov Budker INP IRENG07, Sept.18, 2007, SLAC.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Interaction Region Issues and Beam Delivery R&D Issues & IR Design Status R&D Plans T. Markiewicz Klaisner Review 4/15/1999.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei.
February 05, 2007 Global Design Effort 1 Beam Delivery System R&D S4 Task Force Chris Damerell, Hitoshi Hayano, Marc Ross Deepa Angal-Kalinin, Andrei Seryi,
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Global Design Effort Beam Delivery System Summary Andrei Seryi, SLAC ALCPG/GDE meeting October 25, 2007.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
THE NEXT LINEAR COLLIDER DAMPING RING COMPLEX J.N. Corlett, S. Marks, R. Rimmer, R. Schlueter Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley,
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
Grahame Blair, Tomoyuki Sanuki, Andrei Seryi
Machine Detector Interface Design Updates
ILC Interaction Region and Machine Detector Interface
Beam Delivery update Andrei Seryi December 12, 2005
CLIC-ILC BDS & MDI work.
Updates on IR and FF for super-B factory
The 2mrad horizontal crossing angle IR layout for the ILC
Electron Source Configuration
Extract from today’s talk given to DCB
Andrei Seryi Materials for discussion TILC-08
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

Beam Delivery configuration materials to start discussion Andrei Seryi, Deepa Angal-Kalinin, Hitoshi Yamamoto BDS area GDE meeting at KEK, January 19-20, 2006

19-20 Jan 06 A.Seryi 2 Progress RDR work –Contacting Technical systems (Magnets, Vacuum, Instrumentation, etc) to establish communication and define scope the work –Start to estimate and request needed resources Design work –Continue design optimization, e.g. –Finalize optics for tune-up extraction and diagnostics –Consider improvements in 2mrad extraction chicanes (0.7MW SR loss at 1TeV CM) –Will consider low power tune-up dumps –Technical consideration of push-pull requirements –Radiation physics study for single IR hall; self shielded detector; MPS –design for 1TeV compatibility –Any design changes will go through CCB

19-20 Jan 06 A.Seryi 3 ILC BDS baseline Magnets Vacuum Collimation and beam dumps Instrumentations Civil RF, cavity package, cryomodule Layout and counts are accurate to better than 10% : anticipate very small change of optics in diagnostics and fast extraction. If will go e.g. to single dump and add a beamline to the main dump – could have some effects on the count as well

19-20 Jan 06 A.Seryi 4 Lengths, counts of magnets ( for present optics) Total length of beamlines – m Counts of magnets (N Ltotal Laverage) –Bends: m6.97m –Quads:536996m1.86m –Sextup:4039.6m0.99m –Octup:4660.8m1.32m –Kickers2*50200m 2m Total length of magnets (active length) –4673 m Active / Total length –38.9 % –This number (active/total) is underestimation, e.g. length of BPMs is not included (if stick out of magnets) or other instrumentation

19-20 Jan 06 A.Seryi 5 Vacuum system Total length of vacuum system ~12km –about 7500m of drifts with simple vacuum chamber –about 3400m are in bends with moderate SR. Design of chamber need to be evaluated –Several chicanes in extraction with high SR losses. Special chamber design will be needed. About a thousand of quads and bends and about a thousand of BPMs, with associated vacuum connections There is instrumentation which require optical windows The aperture ranges from couple of cm to half a meter in some places in extraction line Vacuum requirements, about 10nTorr near IR (tbc) The need for fast valves in several places (e.g. near dumps) Perhaps one of the biggest single cost items in BDS Other (minor) questions –narrow gaps from collimators take into account in conductance eval. –Specific requirements for vacuum readout for MPS and BDS diagnostics ? –Accel. phys. tech. group to contacts e.g. for vacuum req. reeval.

19-20 Jan 06 A.Seryi 6 Magnets (warm, SC, Pulsed, Special) Long weak warm dipoles Warm quads Magnet movers Warm large aperture extraction quads Kickers for fast extraction Compact direct wind SC IR quads Compact direct wind sextupole/octupole IR packages Large aperture SC IR quads Large aperture SC IR sextupoles Octupoles for tail folding SC direct wind Septa for fast extraction Warm pocket coil IR quad Warm or SC super septum extraction quads Magnetized muon spoilers (9 and 18m iron walls) Detector integrated dipoles in detectors IR antisolenoids Related: power supply stability. Location of PS. Alcoves or surface bldg.? Warm quads: cost driver: Large count IR quads: Cost driver: Unique and difficult Muon walls: Cost driver: large cost of material

19-20 Jan 06 A.Seryi 7 Muon spoilers Two magnetized walls 9m and 18m in each branch Needed to reduce muon flux at IP to below 10muons per 200 bunches Assume of beam lost at collimators Muon spoilers seem to be one of costly items and need to revisit strategy of their implementation Staging? Start with min set and add if #muons is too high? Alternatives Older NLC picture

19-20 Jan 06 A.Seryi 8 Muon spoiler material cost estimation 4m*5m (9m+18m) * 4branches * density 8Ton/m 3 * 3.3$/kg = 57M$ for the material only References for iron cost (range from 2.2$kg to 3.5$/kg): –1) M.Breidenbach et al: 3.48$/kg – SiD muon system (Babar Kawasaki experience. M.B.: “Note iron is a commodity with big fluctuations”) –2) L.Keller: raw material=0.7$/kg, fabrication=1.5$/kg, total=2.2$/kg probably obsolete data –3) F.Asiri: material $1000/ton in US. Cost of prepared, cut, crated and delivered to order is about $3,300/ton. Korean Iron may be purchased for about 30% less in US.

19-20 Jan 06 A.Seryi 9 Civil layout ?s Location of shafts (8?) –at each dump (6) and IP (2) ? Location of positron go-around tunnel Do we need service tunnels? Alcoves for electronics? Location of power supplies? Shaft also here? Service tunnels? e+ tunnel ?

19-20 Jan 06 A.Seryi 10 Beam dump enclosures & service tunnels? Shafts?

19-20 Jan 06 A.Seryi 11 Drawings and other misc. questions Drawings like those CF layouts shown in previous page – should they be provided to all GDE on password protected web site? Are there global guidance on what cranes or other transportation machines will be available in the halls, alcoves and in the tunnel? –e.g. if we need to move 12m long magnet, or remove collimator, what is the procedure? Is there global guidance on limits for sizes of components?

19-20 Jan 06 A.Seryi 12 Beam dumps and collimations Full power dumps (18MW) (6) –Removing tune-up dumps will be considered Photon (~1-3?MW) dumps (2) Fixed aperture protection collimators (~60) Adjustable spoilers and absorbers (~60) Passive devices to limit betatron aperture (to be designed) Forming the task force to estimate beam dump cost and understand importance of site and ground water Beam Dumps and Collimation technical system – 1 name out of 3. Very big issue. Can we solve it in 48hours?

19-20 Jan 06 A.Seryi 13 RF, cryomodule, cavity package systems Crab cavity systems Based on 3.9GHz deflecting mode cavity developed at Fermilab –Present 3.9GHz CKM cavity not suitable as prototype – it is mechanically too soft, its frequency is 3.925GHz, etc. Experience with 3.9GHz accelerating mode cavity is also relevant Fermilab is best positioned to make RDR design and cost estimation, as well as start work on real crab cavity design and prototype, to be built in ~1.5 years Coordination with UK colleagues and work sharing need to be discussed. E.g. cavity itself – Fermilab, phase stabilization system – UK ?

19-20 Jan 06 A.Seryi 14 Instrumentation BPM and their channels~ 1100 –Large aperture (r=3cm) – design issues Laser wire systems Current monitors, loss monitors (standard) Feedbacks and fast luminosity monitors, pair monitor Spectrometer and polarimeter upstream & downstream Alignment – Civil group & Instrumentation This week at SLAC – mtg of Instrumentation technical group for discussion of feedbacks in BDS etc

19-20 Jan 06 A.Seryi 15 IR systems and magnets Unique, difficult magnets, integration with detectors, R&D One of the high cost items (~ X0M$ ?) Do not have sufficiently detailed sketches that would allow to make technical and engineering evaluation One of concerns and the area where trying to pull in resources 20(14)mrad IR magnets – design and cost estimation by BNL 2mrad IR magnets – design and cost estimation by Fermilab and Saclay IR instrumentation, LUMI/BEAMCALs, IP BPMs, kickers

19-20 Jan 06 A.Seryi 16 20/14mr BNL Issue of resources at BNL

19-20 Jan 06 A.Seryi 17 Si D Forward Masking, Calorimetry & Tracking mrad, L*=3.51m Q-EXT CRAB QF1 SD0 QD0 ECALECAL HCAL Muon Yoke Support Tube Lo-Z LumCal BeamCal

19-20 Jan 06 A.Seryi 18 QD0 SD0 QF1 SF1 Q,S,QEXF1 Disrupted beam & Sync radiations Beamstrahlung Incoming beam 60 m Shared Large Aperture Magnets Rutherford cable SC quad and sextupole pocket coil quad Conceptual design of 2mrad IR

19-20 Jan 06 A.Seryi 19 Details of zero degree design Design of 20 & 2 mrad IR need to advance to and beyond this level of details

19-20 Jan 06 A.Seryi 20 IR hall sizes GLD: 72m x 32m x 40m [Snowmass data] SiD: 48m x 18m x 30m [SiD Collab. Mtg December 2005] Large range (3.5 times in volume) Parametric studies of cost (~excavated volume)

19-20 Jan 06 A.Seryi 21 Cost of BDS Two approaches should give about the same answer –Bottom -> top approach (count parts, individual cost) –Top -> bottom (compare with recently built accelerators, scale, and adjust for differences) With exception of special systems, whose cost could be added, BDS is a lot of kms of warm magnets and vacuum chambers It should be possible to compare it, for example, with Main Injector cost, scale according to beamline length, length of magnets and add special costly systems (beamdumps, muon walls, IR halls, IR and FD) –There are many caveats (e.g. more precise power supplies could be more expensive) but top-bottom cost should also give correct answer

19-20 Jan 06 A.Seryi 22 Possible cost saving strategies Singe IR (will be chosen when more design and cost information will be available, in ~5month) Install only fraction (half) of bends at 500GeV CM stage –this will increase difficulty and cost of the energy upgrade Design all quads as consisting from two halves and install only one half at 500 GeV CM –same difficulty with upgrade Replace high power tune-up dumps with low power –additional beamline from BDS entrance to main dump => +cost Consider staging construction and installation of muon walls (e.g. start with min 5m wall). Install more if muon rate is too high –May be difficult to install the wall in operational tunnel –Consider alternative muon spoilers Undisrupted beam size at dump window - rely not on drift but more on rastering - shorten extraction lines (MPS)

19-20 Jan 06 A.Seryi 23 Some milestones Feb 13-14, GDE mtg at Fermilab – review BDS optics Bangalore –one more iteration on IR comparison –first report on technical evaluation of push-pull? –evaluation (e.g. rad. physics) of single IR hall –more details on upgrade paths from single IR –including consideration of upgrade to gamma-gamma Will set up review of beam dump cost and design – end of March? End of May – full picture of IR performance and cost –possibly, that is when will choose the favorite IR design